FAA Says Parked Planes Need Better Windproof Mooring
Published Date: 11/23/2026
Proposed Rule
Summary
The FAA wants all ATR42 and ATR72 airplanes to update their maintenance plans because strong winds can stress the landing gear when parked. This change helps keep planes safe by adding new mooring steps. Owners need to comment by January 7, 2027, and while this update might mean some extra work, it’s all about preventing costly damage and keeping flights smooth.
Analyzed Economic Effects
4 provisions identified: 2 benefits, 2 costs, 0 mixed.
Operators must update mooring maintenance rules
If you operate ATR42 or ATR72 airplanes, you must revise your existing maintenance or inspection program within 30 days after the AD's effective date to incorporate specified mooring job cards: ATR42 Job Card Package Issue Number 003 dated July 1, 2025, and ATR72 Job Card Package Issue Number 004 dated January 1, 2026. The AD applies to Model ATR42-200, -300, -320, and -500 and Model ATR72-101, -102, -201, -202, -211, -212, and -212A airplanes.
Estimated compliance cost: 90 work-hours ($7,650) per operator
The FAA estimates this AD affects 45 U.S.-registered airplanes and that revising the maintenance or inspection program will take an average of 90 work-hours per operator at $85 per hour, for an average total cost per operator of $7,650. The FAA used a per-operator estimate rather than per-airplane.
Unsafe mooring loads could cause damage or injury
The FAA states that winds within the current wind profiles could lead to loads exceeding certification limits on the nose and main landing gear while moored, which could damage NLG steering/retraction systems and MLG mooring lugs, possibly causing loss of ground control or injury to maintenance personnel during jacking or de-bogging.
New mooring wind-speed threshold (>65 knots)
The incorporated ATR mooring procedures include an updated wind speed limit of more than 65 knots in any direction for mooring. You must use the updated mooring procedures (the ATR job card packages) specified in the AD.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2025-14992, Normalizing Unmanned Aircraft Systems Beyond Visual Line of Sight Operations
The FAA and TSA want to make flying drones beyond what you can see easier and safer for everyone. This new rule will help businesses and hobbyists use drones for things like deliveries, farming, and surveys without needing to keep the drone in sight all the time. If you’re involved in drone flying or services, get ready for new rules by October 6, 2025, that could open up cool new drone opportunities while keeping skies secure.
2025-04846, Extension of the Prohibition Against Certain Flights in the Territory and Airspace of Libya
The FAA is extending the ban on certain flights over Libya for three more years, until March 20, 2028. This affects U.S. airlines, commercial operators, and pilots with FAA certificates flying in Libyan airspace, due to ongoing safety risks. The rule also reminds everyone how to apply for special approvals or exemptions if needed.
Previous / Next Documents
Previous: 2026-23749, Airworthiness Directives; ATR-GIE Avions de Transport Régional Airplanes
The FAA wants all ATR42-500 and ATR72-212A airplanes to get a software upgrade to fix a glitch that can cause dangerous cabin pressure drops during takeoff. This fix stops the outflow valve from closing too fast by improving the air system control software. Owners need to update the software soon, and the FAA is asking for comments by January 7, 2027—so no delays, and safety first!
Next: 2026-23762, Regulations Implementing the Privacy Act
The Occupational Safety and Health Review Commission is updating its Privacy Act rules to make it easier to request records by adding email as an option and tightening identity checks for everyone. These changes affect anyone asking for their personal info from OSHRC and aim to keep things safe and simple. Comments on the proposal are due by December 23, 2026, with no new costs expected.