PHMSA Patches Steel Thickness Rules for Secure LNG Rail Tankers
Published Date: 7/1/2025
Rule
Summary
This update fixes a small but important detail about how thick the steel walls of liquefied natural gas (LNG) rail tanks must be. Rail companies and tank manufacturers need to follow these corrected thickness rules to keep LNG shipments safe. The change is effective immediately and helps prevent accidents without adding extra costs.
Analyzed Economic Effects
1 provisions identified: 1 benefits, 0 costs, 0 mixed.
LNG Rail Tank Steel Thickness Fix
If you build or operate liquefied natural gas (LNG) rail tanks, the rule corrects minimum steel thickness requirements: the outer jacket shell must be at least 7/16 inch after forming, and the outer jacket heads must be at least 1/2 inch after forming and made from the steel specified in Sec. 179.16(c). This correction is effective immediately.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-08144 — Administrative Rulemaking, Guidance, and Enforcement Procedures
The Department of Transportation is bringing back and improving its rules for making new policies, giving guidance, and enforcing laws. This affects anyone involved in transportation regulations, making the process clearer and more consistent. These changes kick in on May 27, 2026, aiming to save time and avoid confusion without adding extra costs.
2026-08058 — Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction
This update fixes a numbering mistake in the rules for checking the maximum safe pressure of gas pipelines. Pipeline operators must follow the corrected list to avoid confusion, but no new costs or deadlines are added. The fix takes effect on August 3, 2026, making safety rules clearer and easier to follow.
2026-06323 — Pipeline Safety: Class Location Change Requirements; Response to Petition for Reconsideration
Pipeline companies and safety pros, listen up! PHMSA just said no to changes requested by the Interstate Natural Gas Association about pipeline safety rules for areas where people live or work. This means the current rules about how pipelines must be upgraded when neighborhoods grow stay in place, so companies should keep their safety upgrades on schedule without extra costs or delays.
2026-09392 — Hazardous Materials: Notice of Applications for New Special Permits
The Department of Transportation is reviewing new special permit requests for safely moving hazardous materials, like damaged lithium-ion batteries. If you work with these materials, now’s your chance to comment before June 11, 2026. These permits could change how some dangerous goods are transported, making things safer and possibly saving money on special packaging rules.
2026-09393 — Hazardous Materials: Notice of Applications for Modification to Special Permits
The Department of Transportation is reviewing requests to change special permits for safely moving hazardous materials. These changes mainly affect companies handling dangerous goods by truck, rail, ship, or plane, aiming to update or remove outdated rules. If you want to share your thoughts, you’ve got until May 27, 2026, to speak up—no fees or costs are mentioned, just a chance to keep things safe and smooth!
2026-09304 — Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee
The Gas Pipeline Advisory Committee is meeting on May 28, 2026, to talk about new safety rules for gas pipelines that affect pipeline companies and the public. They’ll review proposed changes aimed at making gas distribution safer, and everyone can join in person or online. If you want to share your thoughts, you have until June 29, 2026, to send in comments—this could impact how pipelines operate and keep communities safer.
Previous / Next Documents
Previous: 2025-12286 — Adoption of Updated EDGAR Filer Manual
The SEC is updating the EDGAR Filer Manual to match new system changes launching soon. These updates affect companies and people who file reports with the SEC, making the filing process smoother and more secure. The new rules kick in around late 2024, with no extra costs expected for filers.
Next: 2025-12309 — Critical Infrastructure Protection Reliability Standard CIP-015-1-Cyber Security-Internal Network Security Monitoring
The Federal Energy Regulatory Commission (FERC) has approved a new cyber security rule called CIP-015-1 to help protect electric companies' internal networks from cyber threats. This rule affects electric utilities and requires better monitoring of their internal systems, including electronic and physical access controls. Utilities should get ready for updates and tighter security checks soon, which might mean some new costs but stronger protection for our power grid.