ColoradoHB25-10142025 Regular SessionHouseWALLET

Increasing Efficiency Division of Water Resources

Sponsored By: Cleave Simpson (Republican), Dusty Johnson (Republican), Dylan Roberts (Democratic), Meghan Lukens (Democratic)

Signed by Governor

Water

Personalized for You

How does this bill affect your finances?

Personalize government policy and PRIA will tell you what this bill means for your household, plus every other piece of legislation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Bill Overview

Analyzed Economic Effects

8 provisions identified: 3 benefits, 0 costs, 5 mixed.

Federal water projects get permit extensions

The State Engineer can extend well permits needed for federally authorized water projects for up to one year per extension. The engineer must find good cause and review each project at least annually. Permit holders must explain construction delays and estimate the time needed to finish.

Groundwater objectors get five extra days

People entitled to object to notices under Colorado's designated-groundwater law now have 35 days after the notice's last publication. The former deadline was 30 days. Objections must be filed in writing.

Well owners get two construction years

Conditional designated-groundwater permits now allow two years for construction, replacing one year plus a possible one-year extension. The same change covers outside-basin well permits issued on or after April 21, 1967. Permits expire for missed construction deadlines or missing construction reports under agency rules; agencies must notify holders and applicable contractors. Designated-groundwater completion reports must include well depth, water-bearing formations, and maximum sustained pumping rate. The law covers pending and future applications, plus existing and future valid permits.

Bedrock water rights follow land ownership

The law extends groundwater allocation rules to bedrock aquifers designated by the Ground Water Commission. Allocations depend on ownership of the land above the aquifer and the available groundwater beneath that land. Permits must base withdrawals on a 100-year aquifer life. Applications must include replacement-plan requests or plans when commission rules require replacing water losses in alluvial aquifers. Existing fees remain $60 per aquifer allocation decision and $100 per well-permit application.

Bedrock well owners face simpler paperwork

Conditional bedrock groundwater permits no longer require a sworn beneficial-use statement within three years. Instead, holders must report the first beneficial use within 35 days, and the well must meet construction requirements. A separate final permit is no longer required when the well satisfies its permit conditions and other applicable groundwater-law requirements. The conditional permit then serves as the final decision on the water right, with protections against waste and harm to others.

Expired well permits get paid reinstatement

The Ground Water Commission can restore expired conditional designated-groundwater permits; the State Engineer can restore expired outside-basin well permits. Holders must provide satisfactory proof that construction finished within two years after issuance and pay a $30 filing fee. Neither option covers permits formally expired by an order issued before September 1, 2025. Conditional designated-groundwater permits also cannot qualify if they expired because proof of beneficial use was missing.

Water-right owners get staggered abandonment reviews

Water-right abandonment lists are due July 1, 2030, for divisions 1–3 and July 1, 2035, for divisions 4–7. Each group repeats every 10 years, with related notice, objection, and protest deadlines shifted to match. Hearings begin at the September or October court term in 2032 and 2037, respectively. Without protests, judges must confirm the lists unchanged after July 1 of those years and every tenth anniversary thereafter. Contested cases follow civil procedure and evidence rules; judges can allow additional protests and protect water-right owners.

Well owners get longer proof deadline

Non-bedrock conditional permit holders must submit a sworn statement of beneficial use within three years after issuance. If proof is missing then, the commission must give holders 21 days after receiving notice to respond, up from 20. Missing well-completion proof must also be supplied; statements for permits issued on or after July 14, 1975, require $30. Satisfactory proof keeps the permit in force; no response or inadequate proof causes expiration without reinstatement. For non-bedrock wells, verified use and compliance lead to final permits with limits preventing waste and protecting other water users.

Sponsors & Cosponsors

Sponsors

  • Cleave Simpson

    Republican • Senate

  • Dusty Johnson

    Republican • House

  • Dylan Roberts

    Democratic • Senate

  • Meghan Lukens

    Democratic • House

Cosponsors

  • Andrew Boesenecker

    Democratic • House

  • Brianna Titone

    Democratic • House

  • Chris Richardson

    Republican • House

  • Jennifer Bacon

    Democratic • House

  • Jarvis Caldwell

    Republican • House

  • Junie Joseph

    Democratic • House

  • Julie McCluskie

    Democratic • House

  • Jenny Willford

    Democratic • House

  • Kyle Brown

    Democratic • House

  • Karen McCormick

    Democratic • House

  • Katie Stewart

    Democratic • House

  • Lesley Smith

    Democratic • House

  • Monica Duran

    Democratic • House

  • Mandy Lindsay

    Democratic • House

  • Matthew Martinez

    Democratic • House

  • Rebecca Keltie

    Republican • House

  • Rep. S. Bird

    Affiliation unavailable

  • Sheila Lieder

    Democratic • House

  • Tisha Mauro

    Democratic • House

  • Tammy Story

    Democratic • House

  • Ty Winter

    Republican • House

  • Cathy Kipp

    Democratic • Senate

  • Dafna Michaelson Jenet

    Democratic • Senate

  • Sen. F. Winter

    Affiliation unavailable

  • Iman Jodeh

    Democratic • Senate

  • Judy Amabile

    Democratic • Senate

  • Lisa Cutter

    Democratic • Senate

  • Marc Catlin

    Republican • Senate

Roll Call Votes

All Roll Calls

Yes: 188 • No: 6

Senate vote • 4/14/2025

Third reading: Bill

Yes: 33 • No: 0

Senate vote • 4/11/2025

Refer House Bill 25-1014 to the Committee of the Whole and with a recommendation that it be placed on the consent calendar.

Yes: 7 • No: 0

Senate vote • 3/27/2025

Refer House Bill 25-1014 to the Committee on Appropriations.

Yes: 7 • No: 0

House vote • 3/5/2025

Third reading: Bill

Yes: 61 • No: 0

House vote • 3/3/2025

Committee of the whole: Amd (h.001)

Yes: 57 • No: 6

House vote • 2/28/2025

Refer House Bill 25-1014 to the Committee of the Whole.

Yes: 10 • No: 0

House vote • 1/27/2025

Refer House Bill 25-1014, as amended, to the Committee on Appropriations.

Yes: 13 • No: 0

Actions Timeline

  1. Governor Signed

    6/3/2025House
  2. Signed by the Speaker of the House

    5/15/2025House
  3. Signed by the President of the Senate

    5/15/2025Senate
  4. Sent to the Governor

    5/15/2025House
  5. Senate Third Reading Passed - No Amendments

    4/14/2025Senate
  6. Senate Committee on Appropriations Refer Unamended - Consent Calendar to Senate Committee of the Whole

    4/11/2025Senate
  7. Senate Second Reading Special Order - Passed - No Amendments

    4/11/2025Senate
  8. Senate Committee on Agriculture & Natural Resources Refer Unamended to Appropriations

    3/27/2025Senate
  9. Introduced In Senate - Assigned to Agriculture & Natural Resources

    3/10/2025Senate
  10. House Third Reading Passed - No Amendments

    3/5/2025House
  11. House Committee of the Whole Amendment - Change from ----- to -----

    3/4/2025House
  12. House Second Reading Special Order - Passed with Amendments - Committee, Floor

    3/4/2025House
  13. House Committee of the Whole Amendment - Change from Passed to Lost

    3/3/2025House
  14. House Second Reading Special Order - Laid Over Daily - No Amendments

    3/3/2025House
  15. House Committee on Appropriations Refer Unamended to House Committee of the Whole

    2/28/2025House
  16. House Committee on Agriculture, Water & Natural Resources Refer Amended to Appropriations

    1/27/2025House
  17. Introduced In House - Assigned to Agriculture, Water & Natural Resources

    1/8/2025House

Bill Text

Related Bills

Back to State Legislation