MinnesotaHF 71994th Legislature, 2025-2026HouseWALLET

Safe routes to school grant program funding provided, bonds issued, and money appropriated.

Sponsored By: Mary Franson (Republican)

Signed by Governor

Capital Investment

Personalized for You

How does this bill affect your finances?

Personalize government policy and PRIA will tell you what this bill means for your household, plus every other piece of legislation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Bill Overview

Analyzed Economic Effects

91 provisions identified: 82 benefits, 2 costs, 7 mixed.

State bonds fund projects, add debt

The law requires state bond sales of up to $1.183585 billion for projects funded through the bond proceeds fund. It also requires up to $87.35 million in bonds for state transportation fund projects. Both amounts cover authorized bond-related expenses. These bonds fund public investments but create state debt, subject to state constitutional and bond-financing rules.

Sewer extension funded for Rush Lake homes

Chisago County receives $820,000 to plan, design, and build a sewer extension serving 20 homes on Rush Lake. The project extends the Shorewood Park Sanitary Sewer District system. The grant funds sewer access, not direct payments to homeowners.

More repairs for low-income public housing

The law provides $17.5 million to repair federally financed, publicly owned housing for low-income households. Half goes to the metro area and half to greater Minnesota. Greater Minnesota awards must achieve the widest geographic spread across Regions 1 through 10. The housing agency may favor projects using nonstate money or addressing health, safety, or energy needs. The usual affordable-housing supply priorities and restrictions do not apply to this funding.

More funding for community water systems

The law provides $56 million for water infrastructure grants: $26 million for wastewater and $30 million for drinking water. Projects must meet program rules, appear on agency priority lists, and rank within the fundable range. After eligible projects in a category receive funding for the year, remaining uncommitted money can shift between categories. Another $19 million matches federal grants for clean-water and drinking-water revolving funds, supporting qualified capital projects. Eligible municipalities also receive $30 million through the point source implementation grant program for qualified capital projects.

Higher borrowing ceiling for drinking water

The law raises the outstanding debt limit for Minnesota’s drinking-water revolving fund financing from $1 billion to $1.5 billion. This adds $500 million in borrowing capacity while keeping total outstanding debt capped at $1.5 billion. The change does not itself award project funding or household loans.

More repairs and upgrades for colleges

The University of Minnesota receives $40 million for facility preservation, and Minnesota State receives $64.612 million under state preservation rules. Another $35 million funds Phase 1 of the university’s St. Paul campus center, including design, construction, demolition, hazardous-material removal, and utilities. Alexandria Technical and Community College receives an additional $4 million for Phase 2 improvements beyond its 2025 funding. That work includes heating and cooling, the former transportation building’s exterior, program areas, equipment, and student-center space. Southwest Minnesota State University receives $1.2 million to design, renovate, furnish, and equip its Physical Education gym.

Highway funding grows through budget transfer

The law transfers $254 million from Minnesota’s general fund to the Highway User Tax Distribution Fund in fiscal year 2027. This is a one-time transfer. It adds highway funding while reducing money in the general fund. The transfer does not provide household payments or directly change household taxes.

Vehicle owners pay lower 2027 registration taxes

For registration periods starting January 1 through December 31, 2027, affected vehicle owners pay temporarily reduced registration tax rates. The rate is 1.25% for vehicles in the first covered statutory class and 1.285% for the second. Registration invoices must show the temporary reduction and the difference in tax. Savings depend on the vehicle's taxable value and class.

Brainerd airport gets emergency response upgrades

The law provides $2 million for new public-safety infrastructure at Brainerd Regional Airport. Funding covers planning, design, construction, and equipment. The upgrades support agency wildfire response, search and rescue, and other agency needs.

Cities get public building improvement grants

Osseo receives $214,000 for City Hall roof replacement and access improvements. It also receives $800,000 for public works security systems, fencing, office repairs, and a cold-storage addition. Ranier receives $554,000 to plan, build, furnish, and equip a new public works maintenance building. Robbinsdale receives $3.325 million to design a new public works facility; that grant does not fund construction.

Cities get recreation project planning money

Plymouth receives $5 million to design and engineer an ice center expansion and City Center road realignment. The road work must stay within the area bounded by Vicksburg Lane and Trunk Highway 55. St. Paul receives $1 million for early planning at CHS Field, covering baseball-required upgrades, a locker room, visitor amenities, and contaminated-soil cleanup. West St. Paul receives $1 million to design a plaza, urban beach, playground, dry creek, and trails at 150 Thompson Park. These grants fund planning and design, not construction.

Cities get street and utility upgrades

St. Louis Park gets $5.1 million for property purchases, street reconstruction, sidewalks, bikeways, bridges, utilities, and water-quality infrastructure. Stewartville gets $3.096 million to build and pave part of 15th Avenue Northeast in High Forest Township along the city border. That grant also covers drainage at 6th Street Northeast, including culverts and storm sewers. Waconia gets $4.7 million for local roads, connecting streets, trails, and bond-eligible utilities tied to Highway 5 reconstruction. The Highway 5 stretch runs from Highway 284 and South Olive Street to county state-aid Highway 59, or Main Street.

Columbia Heights plans public works improvements

Columbia Heights receives $2.478 million to plan and design a public works facility and expanded public recycling area. The grant also covers an access road and related facility and infrastructure improvements. It may pay for property purchases and project-related demolition.

Communities get water and sewer funding

The Pollution Control Agency gets $1.5 million for projects or grants through the Statewide Drinking Water Contamination Mitigation Program. The Metropolitan Council gets $15 million for grants to eligible metropolitan cities to address unwanted water entering sewer systems. These funds support public infrastructure rather than direct household payments. The law does not set household water-bill savings.

Como Zoo gets new animal habitats

St. Paul gets $9.35 million to design, build, furnish, and equip new big-cat and African animal habitats at Como Zoo. The habitats must include space for training, enrichment, off-exhibit housing, and veterinary care. The grant supports zoo facilities rather than direct household payments.

Corrections can reuse leftover project money

The Department of Corrections can use unspent money from a completed project to preserve its facilities. It must first give written notice to the management and budget commissioner. The original appropriation's spending deadline still applies. The law does not specify the amount available.

Duluth convention center gets facility upgrades

The Duluth Entertainment and Convention Center Authority receives $4.9 million for facility improvements. Work includes elevators, escalators, heating, energy efficiency, disability access, and replacement seats. The grant funds the center rather than direct household benefits.

Funding repairs prisons and expands training

The law provides $39.208 million to preserve state correctional facilities, with a required report listing every funded project. Faribault receives $10.712 million to expand vocational-programming space in the Dakota Building, including demolition, renovation, furnishings, and equipment. Another $350,000 pays for early planning to combine and expand correctional facilities statewide. Clay County receives $1.872 million to design, build, furnish, and equip Phase 1 of a nonsecure juvenile detention facility in Moorhead.

Hilltop gets a new tornado shelter

Hilltop gets a $2.5 million grant for a new tornado and emergency shelter. The money covers site preparation, construction, furnishings, and equipment. This is a grant to the city, not a payment to residents.

Historic sites receive preservation funding

The Minnesota Historical Society receives $5 million for state historic sites and buildings, including landscaping, exhibits, markers, and monuments. The society sets priorities based on need, and state asset-preservation spending rules apply. Another $1 million funds matching grants for county and local capital preservation projects. Those projects must qualify under Minnesota Statutes section 138.0525; the provision does not state a matching rate.

Landowners get conservation agreement funding

The law provides $2 million for Reinvest in Minnesota Reserve conservation easements purchased from landowners. These agreements protect or restore wetlands, grasslands, and waterways for water quality, habitat, and flood reduction. The board must prioritize using federal money for targeted new lands or sensitive lands with expiring federal conservation agreements. It can create or amend agreements to allow restoration, and up to 5% can fund restoration and enhancement. The law does not set payments for individual landowners.

Libraries gain more grant matching options

For grants awarded after June 30, 2026, public library jurisdictions can use nonstate money to meet matching requirements. Matching funds no longer have to come only from local sources. This change expands funding options without changing grant amounts.

Local governments get public facility grants

Lake of the Woods County gets $6 million to design, engineer, build, furnish, and equip law enforcement and government facilities. The project supports accessibility, public services, public safety, and energy efficiency. Its funded improvements are exempt from Minnesota Statutes, section 16B.325. Mendota Heights gets $4 million to plan and design a combined city hall and police facility, not to build it.

Local road grants gain spending flexibility

Unspent money from the $10 million Sturgeon Lake Road rail grade separation appropriation can fund road improvements in the project area. Its appropriation and bond sale authority remain available through December 31, 2030. A separate existing $10 million Highway 36–Lake Elmo Avenue interchange appropriation can fund one or more grants. Eligible recipients are Washington County, Lake Elmo, Grant, or any combination; spending remains limited to eligible portions of that interchange.

Local roads and historic bridge get funding

Redwood Falls gets $1.3 million to design and restore the historic 1938 Swayback Bridge, Number 89859. Slayton gets $2 million to plan, design, engineer, build, and equip 34th Street reconstruction from Juniper Avenue to 160th Avenue. Stearns County gets $3 million for 322nd Street reconstruction in and near St. Cloud, between county state-aid highways 4 and 133. That grant also covers design, engineering, environmental analysis, and land purchases.

Martin County plans veterans service offices

Martin County receives $300,000 to design renovations in an existing county-owned building in Fairmont. The space is for University of Minnesota Extension, 4-H, and Veterans Services offices. The grant pays for office design, not new veterans benefits or household payments.

Metro communities get trail project grants

Champlin gets $500,000 for property, easements, and early planning for an Elm Creek Greenway link from Mississippi Crossings to Elm Creek Park Reserve. Ramsey County gets $4.75 million to design and build about 2.25 miles of multiuse trail along Vadnais Lake's southern edge, with related site work. Washington County gets $2.931 million for a trail from county state-aid Highway 5 to Brown's Creek State Trail. That grant also funds an overlook and viewing area at the historic Point Douglas-St. Louis River Road Bridge. Washington County gets another $1 million for land, design, and construction to extend the Hardwood Creek Regional Trail in Hugo.

Minneapolis parks get recreation facility funding

The Minneapolis Park and Recreation Board gets another $6 million for North Commons Park, adding to its 2020 funding. Work includes the community building, sports fields, and renovation and relocation of the water park. The board gets $1.5 million to plan, design, and build a new Cedar Riverside Recreation Center. Another $1.8 million funds planning, design, construction, furnishings, and equipment to renovate Berger Fountain and Plaza in Loring Park.

Minnesota Zoo gets facility improvement funding

The Minnesota Zoological Board receives $9 million to preserve and improve zoo infrastructure and exhibits. The money can replace outdated or poor-condition buildings and build or renovate site trails and roads. Exhibit renovations can improve animal welfare, safety, and guest viewing. State asset-preservation rules apply, with added authority for these specified projects.

Mississippi riverfront projects receive improvement grants

St. Cloud receives $3 million for its Mississippi Riverwalk Connection Project. Eligible work includes grading, trails, needed pedestrian crossings, lighting, landscaping, riverbank stabilization, shoreline restoration, and utilities. Champlin receives $350,000 to build a jetty and stabilize the bank upstream of the Mississippi Crossings public docks. Each grant is limited to its named project.

More funding for community recreation centers

Breckenridge receives $3 million to design, build, furnish, and equip a community center. Brooklyn Park receives an additional $7.5 million for its community activity center addition, creating a regional athletic facility with multiple courts. Chanhassen receives $2.5 million for design, furnishings, equipment, and possible land purchases for a regional recreation and event center. Its plans include two indoor ice sheets, a walking track, indoor turf, a playground, meeting rooms, and gathering space. Northfield receives $3 million to expand and renovate its Community Resource Center, including safety, security, building systems, and existing spaces.

Museums and auditorium receive building grants

St. Paul receives $40 million to plan, renovate, furnish, and equip Roy Wilkins Auditorium. It also receives $3.6 million to buy property and build, furnish, and equip the Minnesota Latino Museum. The museum must be at 85 West Water Street on Harriet Island. Olmsted County receives $2.322 million to design, expand, renovate, furnish, and equip its History Center museum.

National Guard facilities get repair funding

The law provides $3.5 million to plan and design a new aircraft hangar at Duluth International Airport. The hangar supports the Minnesota Air National Guard's 148th Fighter Wing. Another $2.3 million funds preservation at readiness centers statewide under state asset-preservation rules. The hangar appropriation pays for planning and design, not construction.

Natural resources facilities get repair money

The Department of Natural Resources receives $30 million to preserve or replace state facilities and recreation assets. State spending and capital-program priorities apply unless more specific project standards govern. Another $3 million renovates and expands the St. Paul fish hatchery; leftover money can improve other state buildings. The law also provides $1.4 million for public lands and capital improvements, with priorities set by the commissioner. Any reforestation must follow state reforestation requirements.

Oak Park Heights redevelopment deadline extended

Oak Park Heights has through December 31, 2029, to use existing Allen S. King power plant site redevelopment funds. The appropriation and bond sale authority remain available until that date. The money covers property purchases and early planning and design of public infrastructure for site development. The law does not add a new appropriation here.

Regional parks get improvement funding

The law provides $10 million for regional park improvements and purchases of recreational open-space land. The Metropolitan Council and metropolitan parks agencies can use the money under the council's policy plan. This appropriation cannot buy easements, which are rights to use or protect land without owning it.

Road projects get wetland replacement funding

The law provides $4.5 million to replace wetlands drained or filled by eligible work on existing public roads. The money supports land, permanent easements, and wetland restoration, creation, improvement, or preservation. The Board of Water and Soil Resources can work statewide and contract with public and private partners for replacement credits. Land and permanent easement purchases must use fair market value set by the board. Up to 5% of the money can fund restoration and enhancement.

Solid waste projects get capital grants

The law provides $10.514 million for solid waste capital assistance grants. The agency must prioritize the three highest-ranked projects on its January 2026 capital budget request list. Funding goes to selected projects, not directly to households.

South St. Paul funds new pool

South St. Paul receives $4.15 million to design, build, and equip a new swimming pool and aquatics center. The grant is exempt from Minnesota Statutes section 16B.325, but separate project design requirements still apply. The project must use efficient, low-impact lighting, native and pollinator-friendly plants, WaterSense-certified low-flow plumbing, daylight, and shade. It must also include walking and biking amenities, materials with low levels of volatile organic compounds, and solar-ready infrastructure.

Sports and ice facilities get funding

The law provides $4.5 million to repair and preserve the National Sports Center in Blaine under state asset-preservation rules. Another $750,000 funds grants to local governments for ice facilities. That grant money cannot buy ice resurfacing or edging equipment.

State forests and communities get trees

The law provides $3.5 million to restore and improve state forests managed by the natural resources commissioner. Eligible work includes native seeds and seedlings, planting, seeding, site preparation, and protection under state forest-management requirements. The Metropolitan Council gets $5 million for community tree-planting grants. Another $800,000 funds trees within the Capitol Area as part of the Capitol Mall Design Framework.

State security fence skips building permit

A new eight-foot security fence and access controls at the Bureau of Criminal Apprehension's Maryland Building need no State Building Code building permit. The exemption applies only to this specified work. It does not change permit requirements for other construction.

State trails receive repairs and extensions

The law provides $2 million to renovate paved and unpaved state trails, with projects chosen by the commissioner. Another $2 million designs and builds a paved, multiuse Cuyuna Lakes State Trail segment in Brainerd. It connects the existing trail at the Northern Pacific Center to 28th Street Southeast. A separate $2 million funds engineering and construction of the Root River State Trail from Preston to Carimona.

Three cities get fire facility funding

Eden Prairie gets $2 million to design, build, furnish, and equip storage for regional fire, police, and public safety vehicles and equipment. Golden Valley gets another $2 million for Phase II construction, equipment, furnishings, and site work at its new fire station. That station must include space for regional response and training, and the grant adds to its 2023 funding. Minnetonka gets $2.5 million to demolish and rebuild Fire Station 2 in the city's northeast quadrant. Its project includes furnishings, equipment, round-the-clock operations, housing, decontamination, gear storage, and training.

Visitors with disabilities get park improvements

The law provides $1 million to design and build accessibility improvements at state parks, recreation areas, and wildlife management areas. The work supports access for visitors with disabilities.

Washington County roads get project funding

Stillwater gets $4.3 million to design, engineer, and build an intersection at Washington Avenue and North Frontage Road, plus related safety upgrades. Washington County gets $9.6 million for environmental review, land rights, and final design for a Cottage Grove road realignment. That project covers County Road 19A and 100th Street South; the grant does not fund construction. The county also gets $500,000 for safety and congestion improvements at Bailey Road and Woodbury Drive in Woodbury.

Woodbury gets La Lake Park improvements

Woodbury receives $2 million to design, build, and equip facilities and infrastructure at La Lake Park. The project includes a shelter, restrooms, picnic areas, trails, and a trailhead. It also funds stormwater management and natural-resource improvements to protect water quality and ecosystem health.

Cities extend utilities and rebuild streets

Newport receives $4 million for right-of-way, water, sewer, storm drains, and affected streets in its specified project area. Its project must address unwanted water entering the sewer system. Proctor receives $3.5 million to extend water, sewer, and electric utilities from Ugstad Road across Interstate 35 along the frontage road, and replace utilities from Ugstad Road to 2nd Street. Rice Lake receives $3.8 million for a Martin Road water extension, frontage-road water and sewer extensions, and sewer work near Martin and Rice Lake roads. Rice Lake’s projects support safe drinking water, area development, or planned road reconstruction.

Cities fund drinking-water treatment and repairs

Minnetrista receives $3 million to plan, design, build, furnish, and equip a new water treatment plant. Oak Park Heights receives $1.6 million for design and engineering of drinking-water improvements to remove PFAS chemicals. Silver Bay receives $1.07 million to improve or replace pressure-control stations and related water distribution systems. These grants fund local water systems, not direct household payments.

Cities get coordinated utility and street repairs

Keewatin receives $5.5 million to replace water mains, sanitary and storm sewers, and streets. Lake Benton receives $863,000 for water, sanitary sewer, and storm sewer replacement along U.S. Highway 75 during highway reconstruction. Lake Lillian receives an additional $3.5 million to replace aging water, sanitary sewer, storm sewer, and street infrastructure. Loretto receives $2.7 million for water mains and valves, sanitary sewer, stormwater systems, and related street rebuilding. Cohasset receives $3 million for water tower repairs, citywide water and sewer extensions, storm sewers, and related street work. Crystal receives $1.75 million for planning, design, and engineering of water-main, street, sidewalk, and storm-sewer work on Douglas Drive from Medicine Lake Road and 29th Avenue North to West Broadway.

Cities receive aging infrastructure repair grants

Excelsior receives $5.613 million for right-of-way purchases, streets, water mains, sewers, and other public infrastructure under its pavement plan. Minnetonka Beach receives $4.54 million to replace aging water, sanitary, and utility infrastructure. South Haven receives $3.5 million for water distribution, sanitary and storm sewers, water filters, and street reconstruction. Thomson Township in Carlton County receives $1.5 million to replace aging water distribution, sanitary sewer, and street infrastructure. Wrenshall receives $1.5 million for phased replacement of aging water and storm sewer systems and street reconstruction.

Cities receive wastewater treatment funding

Eveleth receives $2.5 million for wastewater filtration and repairs to help meet phosphorus and mercury rules. Grand Marais receives $1.908 million to improve its existing wastewater plant and address aging and failing infrastructure. Winona receives $6.5 million for planning, design, construction, and equipment upgrades at its existing wastewater plant. West Union receives $900,000 for a new municipal wastewater system, including sanitary sewers and city street reconstruction.

Cities replace aging water and sewers

New Ulm receives $4 million to finish a gravity sewer system, replace a water main, and remove a lift station. That grant also replaces surface features affected by the work. Russell receives $1 million to replace aging and failing municipal infrastructure, including water improvements. Silver Lake receives $3 million for planning, design, engineering, construction, and equipment for stormwater, wastewater, and drinking-water systems. Silver Lake’s work includes wastewater ponds, sewers, storm drains, and water distribution lines.

Communities gain sewer repairs and capacity

Moose Lake receives $1.575 million to plan, design, and line a sewer main. New Germany receives $4 million to design, engineer, build, and equip expanded wastewater treatment capacity. North Zumbro Sanitary Sewer District receives $12 million for Phase 1 of a regional treatment plant, lift stations, and connecting pipes. This adds to its 2023 funding and must serve Zumbrota, Goodhue, Pine Island, Wanamingo, and Prairie Island Indian Community’s Elk Run settlement lands.

Communities gain water connections and planning

East Bethel receives $3 million to connect East Bethel Elementary and Cedar Creek Elementary to city water and sewer. The work includes a new water tower and treatment facility. Ghent receives $3 million for Phase 1 municipal water improvements. Waseca receives $1 million for land or permanent easements, surveys, and planning and design of a new water tower—not construction. Norman, Clay, or Polk County, alone or in authorized combinations, can receive $5 million for Phase 1 of the West Central Regional Water System, including land, transmission mains, and related infrastructure.

Communities get expanded sewer service systems

Holdingford receives $1 million for a new primary wastewater lift station. Laketown Township receives $6.4 million to replace wastewater collection systems in areas 6B, 6F, 6D-3, and 6D-4, including septic tanks, mains, service lines, lift stations, demolition, and street restoration. Bloomington receives $4 million to increase sewer capacity in its north central area, including the Penn American District. The Central Iron Range Sanitary Sewer District receives $1.4 million for more capacity, Buhl lift station upgrades, and security and sewer improvements along Highway 169 between Great Scott Township and Chisholm. Cook receives $1.5 million for inflow and infiltration collection-system improvements and utility extensions to the North Loop.

Communities get more flood protection funding

The law provides $19.84 million for public flood-control projects, including $10 million for Moorhead infrastructure. Unused Moorhead money can fund qualifying Clay County or Buffalo Red River Watershed District projects required for the Fargo-Moorhead Area Diversion Project. Another $840,000 funds Rice Creek Watershed District design work near Interstate 35W to address flooding in New Brighton, St. Anthony Village, and Roseville. State funding also covers the municipal local share where project costs exceed 2% of median household income multiplied by the municipality's household count. Projects are prioritized by need and available funding; recipients must create wetlands eligible for replacement credit when practical and consistent with the project.

Communities get wastewater treatment upgrades

Jordan receives $5.375 million to design, build, and equip wastewater treatment improvements. The Alexandria Lake Area Sanitary District receives $5 million to build and equip Phase Two upgrades at its regional wastewater facility. Big Lake receives $3.5 million to design and engineer wastewater treatment facility improvements and renovations. Cold Spring receives $5.5 million to design and engineer improvements to its wastewater treatment facility.

Communities get water towers and mains

Kandiyohi receives $4 million for planning, engineering, construction, and equipment for Phase 2 water infrastructure improvements. Lonsdale receives $4.851 million for a new water tower and connected water mains. Minneapolis receives $12.36 million to line about 2.6 miles of a 36-inch main under 2nd Street North and Washington Avenue North. Minneapolis also receives an additional $4 million for planning, environmental analysis, engineering, and construction of a water distribution facility in Hennepin County. Dayton receives $3 million to acquire land and plan, design, and build a water tower for storage and firefighting pressure.

Communities receive sewer repair funding

The Duluth North Shore Sanitary District receives $958,000 to reduce unwanted water entering its sewer collection system. Waseca receives $8.9 million to reduce unwanted water, increase sewer capacity, and rebuild the Nelson Lift Station and related infrastructure. Taylors Falls receives $1.5 million for sanitary sewer improvements. St. Paul receives $13 million for underground sanitary sewers beneath West 7th Street as part of the Highway 5 project. It assigns $6.5 million each to Kellogg Boulevard–St. Clair Avenue and St. Clair Avenue–Interstate 35E.

Higher grants for public water lines

Lead service line grants can now cover up to 100% of public line replacement costs, up from 50%. Under the general program rules, grants must cover 100% of replacement costs for privately owned portions. State general obligation bond money can fund only publicly owned portions. Other program funds can cover private portions; no particular household or project is guaranteed a grant.

Local water projects target harmful contaminants

Hastings receives $17.5 million for its Eastern Water Treatment Plant and piping to remove PFAS chemicals from drinking water. Apple Valley receives $3 million to plan and design plant renovations and expansion addressing PFAS. Lafayette receives $3.087 million for reverse-osmosis treatment and related improvements addressing high chloride levels and preventing further disinfection-product violations. The joint water board serving Albertville, Hanover, and St. Michael receives $5 million to expand treatment capacity and address manganese and radium.

Minneapolis gets Northeast storm sewer funding

Minneapolis receives $8 million to design and build a new storm sewer under 13th Avenue Northeast. It runs from 2nd Street Northeast to a new outlet at the Mississippi River.

More help removing drinking water contaminants

The law provides $15 million for lead service line replacement grants and $17 million for emerging contaminant grants. Lead replacement money from state general obligation bonds covers only publicly owned portions of service lines. Other lead program funds can cover up to 100% of privately owned portions under program rules. Emerging contaminant grants cover up to 50% of eligible costs, capped at $5 million per project and reduced by federal funding. Projects must appear on the relevant Health Department priority lists and receive certification from the Commissioner of Health.

Road corridors receive utility upgrade funding

Floodwood receives $1.5 million for water and sewer main replacement and expansion, plus street reconstruction along County Road 832. Spicer receives $2.1 million for a lift station and water, sewer, and road improvements serving the southeast County Road 8 area. St. Francis receives $4 million for public water and sewer work along Highway 47, from Cree Street to 241st Avenue. Two Harbors receives $2 million for public infrastructure tied to the Highway 61 reconstruction. Eligible work there includes utilities, wastewater and stormwater systems, streets, lighting, sidewalks, trails, crossings, and pedestrian ramps.

Three cities get water plant repairs

International Falls receives $4.8 million for capital improvements at its existing water treatment facility. Work can include expansion, replacement of aging parts, security upgrades, and site improvements. Burnsville receives $2.75 million for plant renovations, including electrical parts, water lines, and surface-water treatment upgrades. Duluth receives $4.268 million for Lakewood water plant improvements, including historic pumphouse roof and structural repairs, tank repairs, and clearwell and clarifier upgrades.

Two dams get safety repair funding

Anoka receives $4.696 million to design, engineer, and build operational and safety improvements at the Rum River Dam. After completion, leftover money can fund specified hydroelectric, fish-passage, recreation, and navigational-lock improvements. Three Rivers Park District receives $5.64 million for Coon Rapids Dam improvements. This includes $1.8 million for hydraulic cylinders and $1.2 million for underwater pier and concrete repairs. Unspent funds can support further improvements to the dam's structure, safety, and operation.

Water projects gain contaminant cleanup grants

Eligible drinking water projects can receive emerging-contaminant grants when the program has an appropriation. Projects must address a confirmed exceedance of a federal drinking water limit or an Environmental Protection Agency health advisory level. They must appear on the Drinking Water Revolving Fund Project Priority List, earn required priority points, and receive health commissioner certification. Grants cover up to 50% of eligible costs based on bids, capped at $5 million per project. Specified federal emerging-contaminant funds reduce the grant.

Water treatment and pumping upgrades funded

Eagle Lake receives $6 million to build and equip a drinking water treatment plant addressing high manganese and other water-quality problems. Ely receives $3.9 million for Burntside Lake intake and pumphouse work, water mains, pumps, controls, bridge crossings, and treatment upgrades. St. Paul Regional Water Services receives $1.5 million to repair or replace aging systems at the Fridley pump station. That work covers electrical, mechanical, piping, gate, sump pump, and water pump systems.

Mahnomen gets skilled nursing facility funding

The Mahnomen Health Center Joint Powers Board receives $10 million for a skilled nursing facility in Mahnomen. The grant pays for design, construction, furnishings, and equipment. It does not change individual healthcare eligibility or benefit amounts.

Minneapolis Avivo facilities get renovation funding

The law gives Hennepin County $5 million to renovate Avivo facilities at 1900 and 1908 Chicago Avenue in Minneapolis. Funding covers design, site preparation, demolition, environmental cleanup, and renovation to support ongoing operations. The grant does not create household payments or change service eligibility.

Minneapolis family services facility gets funding

Hennepin County receives $1.131 million to design and build an expansion and renovation of St. David's at 1130 Nicollet Mall. The Minneapolis facility must provide early education, children's mental health care, pediatric therapy, and family-support services. State bond-financed property rules apply to the grant.

State treatment facilities get preservation funding

The law provides $23 million to preserve facilities operated by Direct Care and Treatment. The commissioner of administration manages the money under state asset-preservation rules. This funds facility improvements, not direct household payments or changes to who qualifies for care.

Veterans homes get repairs and renovations

The law provides $77.372 million for veterans homes and cemeteries. This includes $15 million for preservation at eight homes and three cemeteries, following state asset-preservation rules. The homes are in Minneapolis, Hastings, Fergus Falls, Montevideo, Bemidji, Preston, Silver Bay, and Luverne; cemeteries are in Little Falls, Preston, and Duluth. Minneapolis gets $17.2 million to renovate Building 16, with hazardous-material removal allowed. Hastings gets $45.172 million for buildings and infrastructure, including demolition, site preparation, and asbestos and other hazardous-material removal.

Duluth funds center serving homeless residents

Duluth’s housing authority receives $8.85 million for a community engagement center in Duluth serving people experiencing homelessness. The grant pays for planning, design, construction, furnishings, and equipment. It funds a service facility, not direct household payments or new individual eligibility rights.

Housing infrastructure funding for two cities

Mountain Lake receives $2 million to design and build streets, drinking water systems, and sanitary and storm sewers for more housing. Rochester receives $13.224 million for Phase 1 sewer and water expansion to support additional regional housing. Rochester's grant also covers part of Phase 2, from the Chicago and North Western Railroad to Marion Road Southeast and 19th Avenue Southeast. These grants fund public infrastructure, not direct housing aid to residents.

New construction grants for emergency shelters

The law provides $10 million for statewide competitive shelter grants to cities, counties, and qualifying housing authorities. Grants cover up to 100% of capital costs for a project or phase, capped at $7 million per project. At least 40% goes to greater Minnesota unless eligible requests there are insufficient. Priority favors added facilities or beds and facility improvements; projects with operating agreements and at least 10% applicant funding rank first, followed by those with agreements and smaller contributions, then those with at least 10% contributions alone. Shelters must be safe, sanitary, accessible, suitable for people experiencing homelessness, and meet building codes when completed.

Austin learning lab gets training funding

The Austin Port Authority receives $4 million to renovate space for a learning laboratory at the Hormel Institute in Austin. The grant covers design, construction, furnishings, and equipment. The lab supports workforce development, kindergarten-through-grade-12 activities, and professional training in science, technology, engineering, math, and biological imaging. It funds the facility, not direct household payments.

Better facilities for specialized student needs

Area Special Education Cooperative No. 997 receives $6.5 million to develop a learning center in East Grand Forks. It serves students with autism, cognitive disabilities, emotional and behavioral disorders, and other specific needs, including a Level IV regional program. The law also provides $1.7 million for facility preservation at both Minnesota State Academies campuses. Another $1.3 million preserves Perpich Center for Arts Education facilities. State capital spending rules apply to these projects.

Shakopee gains workforce and college spaces

Shakopee receives $4 million for workforce-training and college education spaces in its Innovation Hub. The money pays for design, construction, furnishings, and equipment. It is restricted to those spaces and does not provide tuition aid or household payments.

Cities receive street and sidewalk funding

Osseo receives $586,000 for sidewalks and streetscape improvements on Central Avenue downtown. St. Cloud receives $3.4 million for right-of-way purchases and public infrastructure for its 5th Avenue South Campus and Downtown Connection. Richfield, Hennepin County, or both receive $2 million toward the local share of Nicollet Avenue reconstruction. The roughly 1.4-mile road and utility project runs from 77th Street to 66th Street and includes supporting streets. Funding covers early planning and property, right-of-way, or easement purchases, and the project must proceed in cooperation with Hennepin County.

Highways and historic bridge receive funding

Fillmore County receives $2 million to design, engineer, and rehabilitate the historic Forestville Bridge. The law provides $3 million for property purchases, final design, and construction at four Highway 13 intersections in Savage. The intersections are at Quentin, Lynn, Chowen, and Washburn avenues; necessary related roads and utilities are also eligible. Another $1.2 million from the trunk highway fund supports planning, environmental review, engineering, and right-of-way purchases for interchange reconstruction. That funding covers Interstate 35 at Scott County State-Aid Highway 2, not interchange construction.

State buildings receive repair account funding

The law adds $10 million to the Capital Asset Preservation and Replacement Account for eligible work under state law. This account funding does not name specific projects. Separately, the commissioner of administration receives $1.38 million to preserve and improve the East Grand Forks potato inspection facility. That facility work must follow state capital asset-preservation rules.

More infrastructure funding for business development

The law provides $2 million for Greater Minnesota business development public infrastructure grants. It also provides $2 million each for innovative business infrastructure and transportation economic development infrastructure grants. Brooklyn Center receives another $3 million for public infrastructure serving its Opportunity Site. That work can include site preparation, utilities, stormwater ponds, roads, and public parking. Brooklyn Center’s infrastructure must serve the site and support public travel to and use of it.

Earlier project funding and borrowing canceled

The law cancels $70.937 million in earlier appropriations and reduces the matching bond sale authority by the same amount. Cancellations from 2023 appropriations are $62.372 million, $2.5 million, and $1.6 million. It also cancels $465,000 from a 2017 appropriation and $4 million from a 2020 appropriation. The supplied provisions do not name the affected projects or recipients.

Tighter limits on bond-funded water grants

Only Minnesota local governments can receive the affected drinking water grants paid with state general obligation bond money. Bond-funded service-line grants can pay only for removing and replacing publicly owned portions and the construction needed for that work. These limits apply to grant recipients and spending, not directly to household water customers.

Dellwood trail grant covers revised route

The law changes the Dellwood route covered by the White Bear Lake Communities Lake Links Trail grant without changing its amount. The specified endpoint changes from Washington County's western line to Meadow Lane. Covered segments are Echo Street–Dwinnell Avenue, Yellow Birch Road–Echo Street, and Meadow Lane–Yellow Birch Road. The previously listed segment from Dellwood Road and Dellwood Avenue to Meadow Lane and Dellwood Avenue is removed.

Library construction aid requires local matching

The law provides $2 million for Mary C. Murphy library construction grants through the education commissioner. Grants support eligible library projects under state law. Library construction grants awarded after June 30, 2026, also require local matching funds.

Navigation aid cap changes with limits

State navigation project aid is capped at 80% of total project cost, replacing 80% of the nonfederal share. Using total cost can allow more aid for projects with federal funding, but the 80% ceiling remains binding. The aid cannot serve as a match for other state funds. The commissioner cannot take on continuing funding responsibility for a commercial navigation facility project.

State caps near-term bond debt payments

The law limits general fund transfers for bond debt payments to $1.184495 billion for the biennium ending June 30, 2027. This limits demands on the general fund but can constrain the amount or timing of bond sales. Before each sale, the management and budget commissioner must estimate debt payments and adjust the planned sale to stay within the cap.

University gets forestry land; state pays debt

The state must transfer all state-owned land within Carlton County's Cloquet Forestry Center to the University of Minnesota Board of Regents. The university pays nothing, and the attorney general must approve the transfer's form. The law spends $1.3 million from the general fund in fiscal year 2027 to retire related bonds and financing costs. Once all related debt is retired, the land and improvements are no longer treated as state bond-financed property.

Sponsors & Cosponsors

Sponsor

  • Mary Franson

    Republican • House

Cosponsors

  • Fue Lee

    Democratic • House

  • Leon Lillie

    Democratic • House

  • Pappas

    Affiliation unavailable

  • Kari Rehrauer

    Democratic • House

Roll Call Votes

All Roll Calls

Yes: 182 • No: 18

House vote • 5/17/2026

Passage, as amended

Yes: 122 • No: 11

Senate vote • 5/17/2026

Third Reading

Yes: 60 • No: 7

Actions Timeline

  1. Secretary of State Chapter 130

    5/27/2026Senate
  2. Governor's action Approval

    5/27/2026Senate
  3. Presentment date

    5/20/2026Senate
  4. Third reading Passed vote: 60-7

    5/17/2026Senate
  5. Second reading

    5/17/2026Senate
  6. Urgency declared rules suspended

    5/17/2026Senate
  7. Introduction and first reading

    5/17/2026Senate
  8. Received from House

    5/17/2026Senate
  9. Bill was passed as amended vote: 122-11

    5/17/2026House
  10. Third reading as amended

    5/17/2026House
  11. Amendeda

    5/17/2026House
  12. Motion prevailed

    5/17/2026House
  13. Motion for reconsideration Third reading reconsidered

    5/17/2026House
  14. Motion prevailed

    5/17/2026House
  15. Motion to take from table

    5/17/2026House
  16. Motion prevailed

    5/17/2026House
  17. Motion to lay on the table

    5/17/2026House
  18. Third reading as amended

    5/17/2026House
  19. Amendeda

    5/17/2026House
  20. House rule 1.21, placed on Calendar for the Day Sunday, May 17, 2026

    5/16/2026House
  21. Second reading

    5/16/2026House
  22. Committee report, to adopt as amendeda

    5/16/2026House
  23. Committee report, to adopt and re-refer to Ways and Means

    5/7/2025House
  24. Author changed Franson made chief author

    3/24/2025House
  25. Author added Rehrauer, Lillie

    2/19/2025House

Bill Text

Related Bills