91 sections in this chapter.
R.420-3-1-420-3-1-.51 Lot Modification - Planned And Unplanned
8.9K chars
(1) General Requirements. Lot modification is the planned or unplanned changing of a lot characteristic that shall impact the EDF. (a) Planned lot modification shall be accomplished under the supervision of an engineer and in accordance with the applicable sections of these rules…
R.420-3-1-420-3-1-.52 Design Flow And Wastewater Concentrations
0.4K chars
(1) The daily design flow of sewage from dwellings shall be computed using Table 1. (2) For Large-Flow Cluster Wastewater Systems or establishments, the design flow shall be derived from Table 1. comparable systems, or other published engineering design criteria. Sizing based on …
R.420-3-1-420-3-1-.53 Gravel Field Standard EDF Sizing For Dwellings
0.5K chars
(1) The Gravel Field Standard is the minimum total trench bottom area for dwellings calculated by multiplying the number of bedrooms by the number in the column labeled "Square Feet per Bedroom” in Table 2 or Table 3. The loading rate for an EDF shall correspond to the measured o…