73 sections in this chapter.
880-X-10C-880-X-10C-.51 Contemporaneous Reclamation
0.2K chars
Reclamation efforts including, but not limited to, backfilling, grading: topsoil replacement and revegetation of all land that is disturbed by surface mining activities, shall occur as contemporaneously as practicable with mining operations.
880-X-10C-880-X-10C-.52 Backfilling And Grading: Timing
1.2K chars
(1) Contour mining. Rough backfilling and grading s shall follow coal removal by not more than 60 days or 1,500 linear feet. The State Regulatory Authority may grant additional time and/or distance for rough backfilling and grading if the permittee can demonstrate, through a writ…
880-X-10C-880-X-10C-.53 Backfilling And Grading: General Requirements
3.7K chars
(1) Disturbed areas shall be backfilled and graded to (a) Achieve the approximate original contour, except as provided in paragraph (11) of this section; (b) Eliminate all highwalls, spoil piles, and depressions, except as provided in paragraph (8) (small depressions) and in para…