25,665 sections across 776 Alaska regulatory chapters.
18 AAC 75-220 Application for amendment
1.1K chars
The owner or operator must file an application with the department for a change in operation that would change the dollar amount of financial responsibility required under 18 AAC 75.235(a). The application must include appropriate proof of financial responsibility under 18 AAC 75…
18 AAC 75-225 Renewals
0.9K chars
(a) An application for renewal of department approval of proof of financial responsibility must be submitted to the department at least 30 days, but no earlier than 90 days, before the current approval of proof of financial responsibility expires, except for a nontank vessel. For…
18 AAC 75-235 Amount and evidence of financial responsibility; general provisions
9.0K chars
(a) Each vessel or facility must be specifically covered by an approved form of financial responsibility. The dollar amounts of required financial responsibility set out in AS 46.04.040 or 46.04.055 are adjusted, based upon the percentage change between the reference base index a…
18 AAC 75-236 Amount and evidence of financial responsibility; onshore production facilities
3.1K chars
(a) In addition to the other applicable requirements of this chapter, for an onshore production facility, the amount of financial responsibility required is based on maximum daily production of oil, measured in barrels per day. "Maximum daily production" means the highest amount …
18 AAC 75-237 Public access to records
0.6K chars
Records received by the department under 18 AAC 75.205 - 18 AAC 75.290, including financial responsibility applications, operations files, and proof of financial ability to respond to a spill incident, are subject to AS 40.25.110-40.25.220. Notes 18 AAC 75.237 Eff. 12/8/95, Regis…
18 AAC 75-240 Certificate of proof of financial responsibility
4.1K chars
(a) If the department approves a proof of financial responsibility, it will issue a certificate to the applicant stating that the proof of financial responsibility requirements have been met for each vessel or facility identified in the application. (b) The original certificate, …
18 AAC 75-245 Self-insurance
6.7K chars
(a) In order to demonstrate financial responsibility through self-insurance, an applicant shall maintain in the United States, working capital and net worth, each in an amount at least equal to the applicable amount required under 18 AAC 75.235(a), or a lesser amount necessary to…
18 AAC 75-250 Insurance
5.1K chars
(a) An applicant may demonstrate financial responsibility with insurance for the applicable amount required under 18 AAC 75.235(a), in full or in part. The applicant shall provide proof of insurance issued by an insurer either who is authorized to sell insurance in Alaska under a…
18 AAC 75-255 Surety
1.7K chars
(a) An applicant may demonstrate financial responsibility with a contract of surety, in full or in part, for the applicable amount required under 18 AAC 75.235(a). The applicant shall submit the contract of surety to the department on forms supplied by the department. (b) The iss…
18 AAC 75-260 Guaranty
1.3K chars
(a) An applicant may demonstrate financial responsibility with a contract of guaranty, in full or in part, for the applicable amount required under 18 AAC 75.235(a). The applicant shall submit the contract of guaranty to the department, using a form supplied by the department. (b…
18 AAC 75-265 Letters of credit
2.5K chars
(a) An applicant may demonstrate financial responsibility with a letter of credit, in favor of the State of Alaska, for the applicable amount required under 18 AAC 75.235(a), in full or in part. The letter of credit(1) must be irrevocable for a period of not less than one year on…
18 AAC 75-270 Other proof of financial responsibility for tank vessels, oil barges, oil terminal facilities, oil exploration or production facilities, pipelines, and railroad tank cars
2.4K chars
(a) This section applies to other proof of financial responsibility for tank vessels, oil barges, oil terminal facilities, oil exploration or production facilities, pipelines, and railroad tank cars. An applicant may demonstrate financial responsibility for the applicable amount …
18 AAC 75-271 Proof of financial responsibility for nontank vessels
5.4K chars
(a) This section applies to proof of financial responsibility for nontank vessels. An applicant may demonstrate financial responsibility for the applicable amount required under 18 AAC 75.235(a) (5) or (6), in full or in part, with (1) evidence of financial responsibility meeting…
18 AAC 75-272 Termination or cancellation of proof of financial responsibility
0.9K chars
Termination or cancellation of proof of financial responsibility does not relieve a person subject to AS 46.04.040 or 46.04.055 from (1) the requirement to provide proof of financial responsibility if that person's vessel or facility remains in operation as defined in 18 AAC 75.2…
18 AAC 75-275 75.275
0.7K chars
An agent designated for service of process under AS 46.04.040(e) must be a resident of the state or a corporation authorized to do business in the state. If no designation is made and filed, or if process cannot be served in Alaska upon the designated agent, process may be served…
18 AAC 75-280 Classification as an oil terminal facility
1.4K chars
(a) If a vessel is to operate as an oil terminal facility as defined at AS 46.04.900, the owner or operator shall submit a written request for classification of the vessel as an oil terminal facility to the department. The request for classification must include the (1) name of t…
18 AAC 75-285 Oil terminal facilities
3.4K chars
(a) An oil terminal facility may not transfer a liquid bulk oil product to or from a tank vessel or oil barge if the oil product is declared as liquid bulk cargo, unless the tank vessel or oil barge provides proof to the terminal operator that the tank vessel or oil barge has a c…
18 AAC 75-290 Enforcement
1.4K chars
If a person required to provide proof of financial responsibility under AS 46.04.040, AS 46.04.055, or 18 AAC 75.205 - 18 AAC 75.290 fails or refuses to do so, the department will, in its discretion, (1) seek civil assessments and costs under AS 46.03.760 or other appropriate sta…
18 AAC 75-300 75.300
4.8K chars
(a) Subject to (b), (c), and (g) of this section, a person in charge of a facility or operation shall notify the department by telephone, and immediately afterwards send the department a written notice by facsimile, electronic mail, hand delivery, or first class mail, informing t…
18 AAC 75-305 Posting of information required
1.6K chars
(a) The owner or operator shall display a discharge or release notification placard, provided by the department, that includes telephone numbers of department offices in conspicuous locations on a(1) tank truck containing more than 500 gallons of a hazardous substance, in additio…
18 AAC 75-310 Scope and duration of initial response actions
2.5K chars
(a) Immediately after receiving notice from a person or after otherwise becoming aware of a discharge or release of a hazardous substance to land or waters of the state, a responsible person shall, as required by 18 AAC 75.315, immediately contain and control the discharge or rel…
18 AAC 75-315 Initial response actions
2.8K chars
(a) A responsible person shall investigate, contain, and perform a cleanup of a sudden or recent discharge or release of a hazardous substance (1) in consultation the department, upon notification of a discharge or release under 18 AAC 75.300; (2) in a manner that does not result…
18 AAC 75-320 Department oversight of containment and cleanup
3.1K chars
(a) The department will determine that a responsible person's containment and cleanup efforts are inadequate under 18 AAC 75.315 or 18 AAC 75.325 - 18 AAC 75.396 if the department determines that (1) the responsible person has not used, or has not adequately used, containment equ…
18 AAC 75-325 Site cleanup rules: purpose, applicability, and general provisions
7.6K chars
(a) The requirements of 18 AAC 75.325 - 18 AAC 75.390 are referred to in this chapter as the "site cleanup rules." The site cleanup rules establish administrative processes and standards to determine the necessity for and degree of cleanup required to protect human health, safety…
18 AAC 75-330 Interim removal actions
2.1K chars
(a) The department, or a responsible person as provided in (c) of this section, will perform an interim removal action if the department determines that an interim removal action is necessary under the site cleanup rules to prevent (1) human or environmental exposure to a hazardo…
18 AAC 75-333 Qualified environmental professionals and qualified samplers
4.6K chars
(a) A responsible person shall ensure that a qualified environmental professional (1) prepares the site characterization work plan required under 18 AAC 75.335(b)(1); (2) prepares the site characterization report required under 18 AAC 75.335(c)(1); (3) performs sampling collectio…
18 AAC 75-335 Site characterization
3.5K chars
(a) Before proceeding with site cleanup under the site cleanup rules, a responsible person shall characterize the extent of hazardous substance contamination at the site. (b) A responsible person shall submit a site characterization work plan to the department for approval before…
18 AAC 75-340 Soil cleanup levels; general requirements
9.3K chars
(a) This section provides the requirements for cleanup levels for hazardous substances in soil. For each site, except as provided in (b) of this section, a responsible person shall propose soil cleanup levels for approval, shall base those cleanup levels upon an estimate of the r…
18 AAC 75-341 Soil cleanup levels; tables
28.2K chars
(a) If a responsible person uses method one for petroleum hydrocarbons for a non-Arctic zone under 18 AAC 75.340, the soil cleanup levels must be based on Table A1 in this subsection. TABLE A1. METHOD ONE - PETROLEUM HYDROCARBON SOIL CLEANUP LEVELS IN NONARCTIC ZONES (See notes t…
18 AAC 75-345 Groundwater and surface water cleanup levels
18.8K chars
(a) Except as otherwise provided in this section, cleanup of a discharge or release of a hazardous substance to groundwater or surface water must meet the requirements of this section. (b) Contaminated groundwater must meet (1) the cleanup levels in Table C if the current use or …
18 AAC 75-350 Groundwater use
3.3K chars
Subject to 18 AAC 75.345(c), groundwater at the site is considered to be a drinking water source unless a responsible person demonstrates or the department determines that (1) the groundwater is not (A) used for a private or public drinking water system; (B) within the zone of co…
18 AAC 75-355 Sampling and analysis
5.0K chars
(a) Unless the department determines that final confirmation sampling is not needed to meet the requirements of the site cleanup rules, a responsible person shall submit a sampling and analysis plan for approval under 18 AAC 75.360, and after implementing the plan, shall submit t…
18 AAC 75-360 Cleanup operation requirements
8.3K chars
A responsible person shall ensure that site cleanup is conducted or supervised by a qualified environmental professional. A responsible person shall submit each of the following elements for approval before work on that element begins, and for additional approval if a modificatio…
18 AAC 75-365 Offsite or portable treatment facilities
6.7K chars
(a) A person who owns or operates an offsite or portable treatment facility shall (1) obtain approval of an operations plan before that person accepts or treats contaminated soil; the department will approve the plan if the department determines that the operations proposed in th…
18 AAC 75-370 75.370
5.0K chars
(a) Unless the department approves the activity in question as protective of human health, safety, and welfare, and of the environment, a responsible person may not blend contaminated soil with uncontaminated soil and shall (1) segregate contaminated soil based on (A) the intende…
18 AAC 75-375 Institutional controls
3.6K chars
(a) The department will, after consultation with each landowner of the site, determine that the use of an institutional control is necessary, on a site-specific basis, if the department determines that controls are required to ensure (1) compliance with an applicable cleanup leve…
18 AAC 75-380 Final reporting requirements and site closure
6.6K chars
(a) A responsible person shall submit a written final cleanup report to the department for each site undergoing cleanup under the site cleanup rules. The report must be prepared by a qualified environmental professional. (b) The written report required by (a) of this section must…
18 AAC 75-385 Appeals
0.7K chars
A person aggrieved by a final department decision under 18 AAC 75.380 or a final department decision revoking an approval issued under the site cleanup rules may request informal review under 18 AAC 15.185 or may reguest an adjudicatory hearing under 18 AAC 15.195 - 18 AAC 15.340…
18 AAC 75-390 Waiver or modification
3.0K chars
(a) Except as provided in (b) of this section, and if the department determines that a waiver or modification will be protective of human health, safety, and welfare, and of the environment, the department will waive or modify the site cleanup rules based on a review of the quant…
18 AAC 75-395 Interference with cleanup prohibited
0.6K chars
A person may not interfere with, hinder, or obstruct the containment or cleanup of a hazardous substance conducted under this chapter. This prohibition does not apply to the United States Coast Guard or EPA. Notes 18 AAC 75.395 Eff. 1/22/99, Register 149 Authority:AS 46.03.020 AS…
18 AAC 75-396 75.396
0.7K chars
Subject to AS 29.35.020, AS 46.04.110, and AS 46.09.060, the requirements of 18 AAC 75.300 - 18 AAC 75.390 do not preempt local control that is as stringent as, or more stringent than, those requirements, and that is consistent with a regional master plan prepared under AS 46.04.…
18 AAC 75-400 Applicability
6.3K chars
(a) A person who is subject to AS 46.04.030 or AS 46.04.055(j) must file an application for approval of an oil discharge prevention and contingency plan as required under 18 AAC 75.400 - 18 AAC 75.420 and meet the applicable requirements of 18 AAC 75.430 - 18 AAC 75.495. Notwiths…
18 AAC 75-402 Delayed implementation dates
3.3K chars
(a) If a person applies for a new plan under 18 AAC 75.410, an amendment determined to be a major amendment under 18 AAC 75.415(a), or a plan renewal under 18 AAC 75.420, and that person submits an application before August 4, 2023, the department will review the application unde…
18 AAC 75-405 Pre-application notification and consultation for oil discharge prevention and contingency plans; new plans and plan renewals
1.8K chars
(a) At least 60 days before the scheduled submission date for an application package for approval of a new oil discharge prevention and contingency plan under 18 AAC 75.410 or for renewal of approval under 18 AAC 75.420, the applicant must notify the department in writing of its …
18 AAC 75-408 General procedures to apply for oil discharge and contingency plans
5.3K chars
(a) An application package for approval of an oil discharge prevention and contingency plan must contain (1) an application form supplied by the department containing (A) the applicant's legal name, address, and telephone number; (B) the name, location, and type of facility or op…
18 AAC 75-410 Procedures to apply for oil discharge prevention and contingency plans; new plans
1.1K chars
(a) An application package for approval of a new oil discharge prevention and contingency plan must be submitted in accordance with 18 AAC 75.408. An application package must be submitted at least 180 days before the proposed start of operation. (b) Repealed 4/16/2016. (c) The de…
18 AAC 75-412 Transitional provisions for review of plans approved before May 14, 1992 (Repealed)
0.4K chars
Notes 18 AAC 75.412 Eff. 5/14/92, Register 122; repealed 11/27/2002, Register 164 State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features wil…
18 AAC 75-413 Transitional provisions for review and approval of nontank vessel plans. (Repealed)
0.4K chars
Notes 18 AAC 75.413 Eff. 11/27/2002, Register 164; repealed 9/4/2014, Register 211, October 2014 Authority:AS 46.03.020 AS 46.04.030 AS 46.04.055 AS 46.04.070 State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most…
18 AAC 75-414 Procedures to apply for oil discharge prevention and contingency plans; owner or operator changes
0.7K chars
A change in the owner, operator, or name of the owner or operator of a facility or operation with an approved oil discharge prevention and contingency plan requires that the new owner or operator submit an application package as an amendment under 18 AAC 75.415. Notes 18 AAC 75.4…
18 AAC 75-415 Procedures to apply for oil discharge prevention and contingency plans; plan amendments
4.5K chars
(a) An application for approval of an amendment to an oil discharge prevention and contingency plan must be submitted in accordance with 18 AAC 75.408 and approved by the department, before a change to a plan may take effect, unless it is a routine plan update under (b) of this s…