17,802 sections across 1,773 Connecticut regulatory chapters.
RCSA 29-232-79 Flue connection
0.5K chars
Regulations of Connecticut State AgenciesSec. 29-232-79. Flue connectionEach gas fired boiler shall be equipped with a four-inch vent pipe or flue extended to an approved location outside the building or connected to a chimney flue. Where the horizontal run is more than ten feet,…
RCSA 29-232-8 Examination fees
0.5K chars
Regulations of Connecticut State AgenciesSec. 29-232-8. Examination feesA fee of twenty-five dollars shall be charged for each applicant taking the examination for a certificate of competency. If an applicant fails to pass the examination, this fee shall be good for a period of o…
RCSA 29-232-80 Stamping of existing boilers
0.5K chars
Regulations of Connecticut State AgenciesSec. 29-232-80. Stamping of existing boilersEach existing boiler shall be stamped with a serial number of the state of Connecticut (preceded by the letters CONN, said letters and figures to be not less than five-sixteenths of an inch in he…