148 sections in this chapter.
R.22.50-50305 Notification, Reporting, and Recordkeeping
2.4K chars
§ 50305. Notification, Reporting, and Recordkeeping. (a) Notification. Owners and operators shall notify the agency of any of the following changes in information relating to an UST or tank system by submitting the “Notification for Underground Storage Tanks” form prescribed by t…
R.22.50-50306 Periodic Testing of Spill Prevention Equipment and Containment Sumps Used for Interstitial Monitoring of
3.7K chars
§ 50306. Periodic Testing of Spill Prevention Equipment and Containment Sumps Used for Interstitial Monitoring of Piping and Periodic Inspection of Overfill Prevention Equipment. (a) Owners and operators of UST systems with spill and overfill prevention equipment and containment …
R.22.50-50307 Periodic Operation and Maintenance Walkthrough Inspections
2.7K chars
§ 50307. Periodic Operation and Maintenance Walkthrough Inspections. (a) To properly operate and maintain UST systems, not later than October 13, 2018, owners and operators must conduct walkthrough inspections that, at a minimum, check the following equipment as specified below: …