R.29.1-1101 Public Works Policies, Procedures and Regulations
0.1K chars
§ 1101. Public Works Policies, Procedures and Regulations. Policies and Procedures for the Implementation of Capital Improvement Projects.
R.29.1-1102 Definitions
1.9K chars
§ 1102. Definitions. The following are definitions of terms and titles used in the body of the procedures. Other terms not defined should be self-explanatory: (a) “ CIP ” stands for Capital Improvement Project and is defined as construction of new public facilities, or projects w…
R.29.1-1103 Project Initiation: Policy - Project Initiation
0.8K chars
§ 1103. Project Initiation: Policy - Project Initiation. (a) Work on capital improvement projects shall be initiated only upon the approval of the Chief of Engineering. (b) Only capital improvement projects with adequate funds to accomplish the intent and scope of each project sh…
R.29.1-1104 Same: Application
0.3K chars
§ 1104. Same: Application. The provisions of §§ 1103 through 1112, shall apply to all capital improvement projects under the purview of the Department, or more specifically, those projects assigned to any Engineering or Operations Division of this Department.
R.29.1-1105 Same: Creation and Preliminary Processing of Projects
1.4K chars
§ 1105. Same: Creation and Preliminary Processing of Projects. There are essentially two (2) methods by which projects are created: (a) Public Law. A project may be created through the enactment of a public law requiring joint action by the Legislative and Executive Branches of t…
R.29.1-1106 Same: Designation of the Using Agency
0.3K chars
§ 1106. Same: Designation of the Using Agency. If there is no clear distinction regarding the role of the Using Agency, the Director of Public Works shall define, designate and inform the specific government of Guam agency who will assume this role on each specific project.
R.29.1-1107 Same: Project Assignment
0.4K chars
§ 1107. Same: Project Assignment. After the Department of Public Works has been properly notified of the creation of a project, the implementing division shall be responsible for assigning a project manager to manage all aspects of the project. Project assignments shall be made b…
R.29.1-1108 Same: Project Identification and Numbering Procedures: Capital Improvement Projects (Except Highways)
2.4K chars
§ 1108. Same: Project Identification and Numbering Procedures: Capital Improvement Projects (Except Highways). The project identification and numbering code will have twelve (12) characters: (a) Project Category. The first two (2) characters will indicate the Project Category: Ex…
R.29.1-1109 Same: Same: Highway Projects
2.4K chars
§ 1109. Same: Same: Highway Projects. The highway project identification and numbering code will have twelve (12) characters: (a) Project Category. The first three (3) characters will indicate the road, intersection or bridge designation. Digits will indicate the Route Number. Le…
R.29.1-1110 Same: Same: Implementation Responsibility
0.2K chars
§ 1110. Same: Same: Implementation Responsibility. The Principal Engineer of the Implementing Division shall assure that all projects are numbered properly.
R.29.1-1111 Same: Project Filing Procedures. General
3.3K chars
§ 1111. Same: Project Filing Procedures. General. All project files must be created and maintained in accordance with the following format and procedures. There shall be one project file with two (2) basic divisions which must be initiated and maintained separately: DIVISION ONE …
R.29.1-1112 Same: Same: Implementation Responsibility
0.1K chars
§ 1112. Same: Same: Implementation Responsibility. The Project Manager shall assure that all necessary documents are executed and filed properly.
R.29.1-1113 Project Planning: Policy - Planning
0.8K chars
§ 1113. Project Planning: Policy - Planning. All capital improvement projects must be subjected to proper planning processes to assure that the following project requirements are fully and properly addressed, evaluated and resolved: (a) Function and compatibility with an establis…
R.29.1-1114 Same: Application
0.3K chars
§ 1114. Same: Application. The provisions of §§ 1103 through 1114 shall apply to all capital improvement projects under the purview of the Department or more specifically, those projects assigned to any Engineering or Operations division of this Department.
R.29.1-1115 Same: Project Planning Procedures
0.6K chars
§ 1115. Same: Project Planning Procedures. The following are procedures governing the planning of all projects. Planning shall be defined as any activity which precedes the actual production of construction plans and specifications. Planning activities include but are not limited…
R.29.1-1116 Same: Determination
0.4K chars
§ 1116. Same: Determination. (a) The Chief of Engineering shall determine whether planning, wholly or in part, can best be accomplished in-house, or whether the nature and magnitude of the project is such that consultant services are required. (b) Should planning by consultant be…
R.29.1-1117 Same: Planning
1.2K chars
§ 1117. Same: Planning. Whether planning is done wholly, or in part in-house, or by consultant, the Project Manager must assure that the following are accomplished: (a) The Using Agency parameters that contribute of the project program and design are established; COL 2026-08-06 C…
R.29.1-1118 Same: Public and Special Interest Group Participation in Project Planning Activities
0.9K chars
§ 1118. Same: Public and Special Interest Group Participation in Project Planning Activities. The Principal Engineer shall determine if a project has sufficient impact on environment, the public, a community or a special interest group to warrant a public or special meeting. If a…
R.29.1-1119 Same: Same: Evaluation of Results
0.3K chars
§ 1119. Same: Same: Evaluation of Results. The Project Manager shall assure that all comments and suggestions made during the meeting are thoroughly evaluated. The Project Manager shall incorporate into the project all feasible and beneficial comments or suggestions before finali…
R.29.1-1120 Same: Preparation of the Design Scope of Work
0.2K chars
§ 1120. Same: Preparation of the Design Scope of Work. Based upon planning results, the Project Manager shall establish the project design concept and detailed design scope of work.
R.29.1-1121 Same: Same: Required Provisions of the Design Scope of Work
1.0K chars
§ 1121. Same: Same: Required Provisions of the Design Scope of Work. The Project Manager (or Consultant when appropriate) shall prepare a detailed design scope of work which must define and set forth the following provisions: (a) Intent of the Design Contract (b) Project Location…
R.29.1-1122 Same: Same: Approval of the Scope of Work
0.4K chars
§ 1122. Same: Same: Approval of the Scope of Work. The Project Manager shall assure that: (a) The Scope is satisfactory to the Director or authorized representative of the Using Agency and to a participating federal agency, if appropriate. (b) The Scope must then be submitted to …
R.29.1-1123 Same: Identification of Preliminary Project Costs
0.8K chars
§ 1123. Same: Identification of Preliminary Project Costs. The Project Manager shall prepare (on Schedule A as shown in Plate 7) a Project Budget which must program the probable costs for the following: (a) Planning and Design (b) Contract Administration (c) Real Estate Acquisiti…
R.29.1-1124 Same: Filing of Project Management Documents
0.2K chars
§ 1124. Same: Filing of Project Management Documents. The Project Manager shall assure that all official actions related to project planning are documented and filed in accordance with §§ 1111 and 1112.
R.29.1-1125 Procurement of Consultant Services: Policy
0.6K chars
§ 1125. Procurement of Consultant Services: Policy. (a) Only professionally qualified, experienced and reputable consultant firms shall be engaged to provide project planning and/or design services. Negotiations shall be carried out, contracts executed and administered in accorda…
R.29.1-1126 Same: Application
0.2K chars
§ 1126. Same: Application. The provisions of §§ 1125 through 1144 apply to all activities involved with procurement of consultant contracts for planning or engineering services.
R.29.1-1127 Same: Professional Consultant Files
1.8K chars
§ 1127. Same: Professional Consultant Files. The Chief of Engineering shall be responsible for creating, maintaining and updating the files of all planning, surveying, architectural and engineering consultants who are qualified to provide the Government with professional services…
R.29.1-1128 Same: Procedures for Selection of Consultants
0.1K chars
§ 1128. Same: Procedures for Selection of Consultants. The following procedures shall govern the selection of consultants for government projects.
R.29.1-1129 Same: Same: Board of Review Authority and Responsibilities
2.1K chars
§ 1129. Same: Same: Board of Review Authority and Responsibilities. (a) Membership. The Board of Review is a committee convened and chaired by the Principal Engineer of the Implementing Division and consists of the following members: (1) Chief of Engineering (2) Principal Enginee…
R.29.1-1130 Same: Same: Slate Selection (or Pre-selection of Consultants)
1.8K chars
§ 1130. Same: Same: Slate Selection (or Pre-selection of Consultants). The Principal Engineer shall convene a Board of Review to prepare and evaluate a slate of qualified consultants based upon the following criteria: (a) Specialized experience in the type of work required; (b) P…
R.29.1-1131 Same: Same: Final Selection of Consultants
1.1K chars
§ 1131. Same: Same: Final Selection of Consultants. The following shall govern the final selection of consultants: (a) The slate must be narrowed to three (3) firms in order of preference. (The standard selection work sheet with rating instructions illustrated by Plate 8 shall be…
R.29.1-1132 Same: Procedures for Conduct of Negotiations
0.1K chars
§ 1132. Same: Procedures for Conduct of Negotiations. The following procedures shall govern the conduct of negotiations with selected consultants.
R.29.1-1133 Same: Same: Negotiating Committee Authority and Responsibilities
0.9K chars
§ 1133. Same: Same: Negotiating Committee Authority and Responsibilities. (a) The negotiating committee is normally composed of the Principal Engineer and the Project Manager. (b) The size and specific membership of the committee may be increased should the Principal Engineer dec…
R.29.1-1134 Same: Same: Scope of Services
0.3K chars
§ 1134. Same: Same: Scope of Services. The design Scope of Work developed in accordance with §§ 1120 through 1122 of this Article [Manual] shall be used as the preliminary scope of services. During negotiations the contract scope of services shall be finalized between the consult…
R.29.1-1135 Same: Same: Independent Cost Estimate
0.3K chars
§ 1135. Same: Same: Independent Cost Estimate. Before the selected consultant is notified, the Project Manager shall prepare an independent cost estimate of the work ( see § 1123 of this Article [Manual]). This estimate will then be used as the basis of a mutually agreeable fee.
R.29.1-1136 Same: Same: Notification and Preparation for Negotiations
0.7K chars
§ 1136. Same: Same: Notification and Preparation for Negotiations. (a) The Principal Engineer shall inform the consultant of the selection in writing. He shall then arrange and conduct a conference with the consultant to explain the scope of services, departmental project managem…
R.29.1-1137 Same: Same: Proposal, Review and Conduct of Negotiations
2.3K chars
§ 1137. Same: Same: Proposal, Review and Conduct of Negotiations. (a) The Principal Engineer and his staff shall review the proposal to determine whether the scope of services was understood; the desired format followed; and if the fee as detailed is fair, reasonable and within b…
R.29.1-1138 Same: Contract Award and Notice to Proceed
1.9K chars
§ 1138. Same: Contract Award and Notice to Proceed. (a) Low Value Consultant Contract. (1) If the negotiated contract fee is equal to or less than Ten Thousand Dollars ($10,000.00), the contract may be processed as a Low Value Contract that is, the contract may be approved by the…
R.29.1-1139 Same: Amendments to Professional Consultant Contracts
0.5K chars
§ 1139. Same: Amendments to Professional Consultant Contracts. Amendments may be made to professional consultant contracts for the following reasons: (a) Increase the scope of work and corresponding increase in contract amount. (b) Decrease the scope of work and corresponding dec…
R.29.1-1140 Same: Same: Format
0.1K chars
§ 1140. Same: Same: Format. Amendments shall be executed on the standard departmental format (CD-2).
R.29.1-1141 Same: Same: Notification, Negotiation and Award
0.8K chars
§ 1141. Same: Same: Notification, Negotiation and Award. (a) Notification, negotiation and award of amendments shall be generally in accord with procedures set forth in §§ 1131 to 1138 as modified to suit the purpose. (b) The Director may approve amendments whose total value does…
R.29.1-1142 Same: Contract Provisions and Administration: Provisions of Contract
0.5K chars
§ 1142. Same: Contract Provisions and Administration: Provisions of Contract. The formal contract shall be executed on the Standard Departmental Contract Document CD-1 (Plate 10). The provisions of CD-1 are hereby adopted for official. There shall be no deviations from these prov…
R.29.1-1143 Same: Same: Administration
0.4K chars
§ 1143. Same: Same: Administration. The Project Manager shall be responsible for assuring compliance with all contract provisions, scope of work and schedule as set forth in CD-1 and §§ 1145 through 1153. The Project Manager shall immediately notify his Principal Engineer of any …
R.29.1-1144 Same: Same: References on Public Contract Practices
0.5K chars
§ 1144. Same: Same: References on Public Contract Practices. The Code of Federal Regulations, Subtitle A, Chapters 1 and 2 are hereby adopted as official references on contracting and contract administration practices. A copy of these regulations shall be retained by the Chief of…
R.29.1-1145 Project Design: Policy
1.0K chars
§ 1145. Project Design: Policy. (a) The design of capital improvement projects shall be undertaken only after proper planning has been accomplished as set forth in § 1113 through 1124 of the Article [Manual]. COL 2026-08-06 C H . 1 D IRECTOR OF P UBLIC W ORKS 21 (b) The design of…
R.29.1-1146 Same: Application
0.3K chars
§ 1146. Same: Application. The provisions of §§ 1145 through 1153 shall apply to all capital improvement projects under the purview of the Department or, more specifically, those projects assigned to any Engineering or Operations divisions of this Department.
R.29.1-1147 Same: Project Design Procedures
0.8K chars
§ 1147. Same: Project Design Procedures. The following are procedures governing the design of all projects. Design shall be defined as the actual development of complete construction plans, specifications and detailed cost estimates in accordance with an approved scope of work. D…
R.29.1-1148 Same: Determination
0.5K chars
§ 1148. Same: Determination. (a) The Chief of Engineering shall determine whether design of a project, whole or in part can best be accomplished in-house, or whether the nature and magnitude of the project or current workload is such that consultant services are required. (b) Sho…
R.29.1-1149 Same: Design
1.6K chars
§ 1149. Same: Design. Whether design is accomplished wholly, or in part, in house or by consultant, the Project Manager shall assure that the following are accomplished: (a) Design is in accordance with the approved design scope of work and in conformance with all applicable code…
R.29.1-1150 Same: Design Review and Submittal
0.8K chars
§ 1150. Same: Design Review and Submittal. (a) All design work shall be reviewed by the Project Manager, his Chief Project Manager (or team leader) and the Principal Engineer, as a minimum. (b) If design is by consultant, the Project Manager shall be responsible for the detail re…