117 sections in this chapter.
HAR 11-280.1-70 Temporary closure
2.0K chars
(a) When an UST system is temporarily closed, owners and operators must continue operation and maintenance of corrosion protection in accordance with section 11-280.1-31, and applicable release detection in accordance with subchapter 4. Subchapters 5 and 6 must be complied with i…
HAR 11-280.1-71 Permanent closure and changes-in-service
2.0K chars
(a) At least thirty days before beginning either permanent closure or a change-in-service of an UST or tank system under subsections (c) and (d), owners and operators must notify the department of their intent to permanently close or make the change-in-service, as required in sec…
HAR 11-280.1-72 Assessing the site at closure or change-in-service
1.2K chars
(a) Before permanent closure or a change-in-service is completed, owners and operators must measure for the presence of a release where contamination is most likely to be present at the UST site. In selecting sample types, sample locations, and measurement methods, owners and ope…