R.266.155 Section 266.155: Process Weight Rate for Shakeout Operations
0.2K chars
Section 266.155 Process Weight Rate for Shakeout Operations The process weight rate for shakeout operations is calculated by using the weight of the sand and other materials freed from the casting.
R.266.160 Section 266.160: Process Weight Rate for Drying Operations
0.2K chars
Section 266.160 Process Weight Rate for Drying Operations The process weight rate for drying operations is calculated by using the weight of the material to be dried, as weighed entering the dryer.
R.266.165 Section 266.165: Process Weight Rate for Concrete Batch Plants
0.2K chars
Section 266.165 Process Weight Rate for Concrete Batch Plants The process weight rate for concrete batch plants is calculated by using the weight of the cement, aggregate and water as added at the batch plant.