Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1711 Repair of Plastic Pipe [49 CFR 192.311]
0.1K chars
A. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [49 CFR 192.311]
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1713 Bends and Elbows [49 CFR 192.313]
1.5K chars
A. Each field bend in steel pipe, other than a wrinkle bend made in accordance with §1715, must comply with the following. [49 CFR 192.313(a)] 1. A bend must not impair the serviceability of the pipe. [49 CFR 192.313(a)(1)] 2. Each bend must have a smooth contour and be free from…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1715 Wrinkle Bends in Steel Pipe [49 CFR 192.315]
0.8K chars
A. A wrinkle bend may not be made on steel pipe to be operated at a pressure that produces a hoop stress of 30 percent, or more, of SMYS. [49 CFR 192.315(a)] B. Each wrinkle bend on steel pipe must comply with the following. [49 CFR 192.315(b)] 1. The bend must not have any sharp…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1717 Protection from Hazards [49 CFR 192.317]
0.9K chars
A. The operator must take all practicable steps to protect each transmission line or main from washouts, floods, unstable soil, landslides, or other hazards that may cause the pipeline to move or to sustain abnormal loads. In addition, the operator must take all practicable steps…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1719 Installation of Pipe in a Ditch [49 CFR 192.319]
3.1K chars
A. When installed in a ditch, each transmission line that is to be operated at a pressure producing a hoop stress of 20 percent or more of SMYS must be installed so that the pipe fits the ditch so as to minimize stresses and protect the pipe coating from damage. [49 CFR 192.319(a…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1721 Installation of Plastic Pipe [49 CFR 192.321]
0.5K chars
A. Plastic pipe must be installed below ground level except as provided by Subsections G, H, and I of this Section. [49 CFR 192.321(a)] B. Plastic pipe that is installed in a vault or any other below grade enclosure must be completely encased in gas-tight metal pipe and fittings …
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1723 Casing [49 CFR 192.323]
0.7K chars
A. Each casing used on a transmission line or main under a railroad or highway must comply with the following. [49 CFR 192.323] 1. The casing must be designed to withstand the superimposed loads. [49 CFR 192.323(a)] 2. If there is a possibility of water entering the casing, the e…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1725 Underground Clearance [49 CFR 192.325]
1.0K chars
A. Each transmission line must be installed with at least 12 inches (305 millimeters) of clearance from any other underground structure not associated with the transmission line. If this clearance cannot be attained, the transmission line must be protected from damage that might …
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1727 Cover [49 CFR 192.327]
2.7K chars
A. Except as provided in Subsection C, E, F and G of this Section, each buried transmission line must be installed with a minimum cover as follows. [49 CFR 192.327(a)] Location Normal Soil Consolidated Rock Inches (Millimeters) Inches (Millimeters) Class 1 Locations 30 (762) 18 (…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1728 Additional Construction Requirements for Steel Pipe Using Alternative Maximum Allowable Operating Pressure. [49 CFR 192.328]
3.0K chars
A. For a new or existing pipeline segment to be eligible for operation at the alternative maximum allowable operating pressure calculated under §2720, a segment must meet the following additional construction requirements. Records must be maintained, for the useful life of the pi…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-1729 Installation of Plastic Pipelines by Trenchless Excavation [49 CFR 192.329] [Formerly §1725]
0.6K chars
A. Plastic pipelines installed by trenchless excavation must comply with the following. [49 CFR 192.329] 1. Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at …
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-921 [49 CFR 192.321(d)]
1.7K chars
E. Plastic pipe that is not encased must have an electrically conducting wire or other means of locating the pipe while it is underground. Tracer wire may not be wrapped around the pipe and contact with the pipe must be minimized but is not prohibited. Tracer wire or other metall…
Chapter 17. General Construction Requirements for Transmission Lines and Mains [49 CFR Part 192 Subpart G]-923 [49 CFR 192.321(h)(3)]
0.4K chars
I. Plastic mains may terminate above ground level provided they comply with the following. [49 CFR 192.321(i)] 1. The above-ground level part of the plastic main is protected against deterioration and external damage. [49 CFR 192.367(i)(1)] 2. The plastic main is not used to supp…
Chapter 17. General Provisions-1701 Definitions
35.8K chars
A. The provisions of the Act relating to definitions, words and terms are hereby incorporated by reference and made a part hereof and will therefore apply and govern the interpretation of these rules, unless the context otherwise requires or unless specifically redefined in a par…
Chapter 17. General Provisions-1703 Ownership of Licenses and Permits
0.6K chars
A. Licenses and permits issued by the board or division as provided in the Act are and shall remain the property of the board or division at all times. B. A license shall be issued in the name of the owner of the riverboat or of the eligible facility. One license will be issued f…
Chapter 17. General Provisions-1705 Transfers of Licenses or Permits
0.5K chars
A. Licenses and permits are not transferable or assignable. If the status of the licensee or permittee should change such that the person no longer needs or is entitled to the license or permit, then the license or permit shall be cancelled and any tangible item which evinces suc…
Chapter 17. General Requirements for Permit, Exploration and Development Procedure Systems-1701 Responsibilities
0.6K chars
A. Persons seeking to engage in surface coal mining and reclamation operations must submit an application for and obtain a permit for those operations in accordance with this Subpart. Persons seeking to conduct coal exploration or development operations must first file the notice…
Chapter 17. Grant Policy-1701 Grant Program Policy Manual
0.4K chars
A. LRS Grant Policy Manual, fiscal year 1995, provides uniform requirements for the Administration of Louisiana Rehabilitation Services (LRS) grants and the principles for determining costs applicable to activities assisted by LRS grants for grants to institutions of higher educa…
Chapter 17. Grant Policy-1703 Federal Financial Participation
0.5K chars
A. The total federal financial participation in expenditures for construction of facilities for community rehabilitation program purposes for each year can not exceed 10 percent of LRS' allotment of Section 110 Funds for that year. B. For each fiscal year, LRS' expenditures for r…
Chapter 17. Grant Policy-1705 Community Rehabilitation Program
1.3K chars
A. A Community Rehabilitation Program is a program that provides directly or facilitates the provision of one or more of the following vocational rehabilitation services to individuals with disabilities to enable those individuals to maximize their opportunities for employment, i…
Chapter 17. Grant Policy-1707 General Provisions
0.3K chars
A. LRS will accept solicited and unsolicited grant proposals from institutions of higher education, hospitals, nonprofit organizations, and state and local governments for the establishment of Community Rehabilitation Program facilities and construction of community rehabilitatio…
Chapter 17. Grant Policy-1709 Establishment of Community Rehabilitation Program Facilities
2.8K chars
A. Federal financial participation is available in expenditures for the establishment, development, or improvement of a public or nonprofit community rehabilitation program for the following types of expenditures. 1. The establishment, development, or improvement of a public or n…
Chapter 17. Grant Policy-1711 Construction of Community Rehabilitation Program Facilities
1.3K chars
A. Federal financial participation is available in expenditures for the construction of a facility for community rehabilitation program purposes for the following types of expenditures: 1. acquisition of land in connection with the construction of a new building for a community r…
Chapter 17. Grant Policy-1713 Financial Administration
2.7K chars
A. Standards for Financial Management Systems. A grantee must expand and account for grant funds in accordance with state laws and procedures for expending and accounting for its own funds. Fiscal control and accounting procedures must be sufficient to: 1. permit preparation of r…
Chapter 17. Grant Policy-1715 Payment Requirements
0.7K chars
A. If progress and/or completion of services are provided to the satisfaction of LRS, payments are to be made as specified in the contract agreement, stipulating rate or standard of payment, billing intervals, and invoicing provisions. B. Withholding of Payments 1. Payments for p…
Chapter 17. Grant Policy-1717 C. Violation of Terms. When a grantee has materially failed to comply with the terms of a grant, LRS may suspend the grant in whole or in part. The notice of suspension will state the reasons for the suspension, any corrective action required of the grantee, and the effective date. Suspensions shall remain in effect until the grantee has taken corrective action satisfactory to LRS or given evidence satisfactory to LRS that such corrective action will be taken or until LRS terminates the grant. New obligations incurred by the grantee during the suspension period will not be allowed unless LRS expressly authorizes them in the notice of suspension or an amendment to it. Necessary and otherwise allowable costs which the grantee could not reasonably avoid during the suspension period will be allowed if they result from obligations properly incurred by the grantee before the effective date of the suspension and not in anticipation of suspension or termination.
2.3K chars
C. Violation of Terms. When a grantee has materially failed to comply with the terms of a grant, LRS may suspend the grant in whole or in part. The notice of suspension will state the reasons for the suspension, any corrective action required of the grantee, and the effective dat…
Chapter 17. Grant Policy-1719 Cost Sharing or Matching
1.2K chars
A. Nonprofit Facilities. Cost sharing or matching means the grantees share of the costs of a grant-supported project or program. The grantee's match funds must be certified as nonfederal monies and will be required up-front in the form of a check payable to LRS. LRS will then rei…
Chapter 17. Grant Policy-1721 Program Income
0.5K chars
A. Program income means gross income received by the grantee directly generated by a grant supported activity, or earned only as a result of the grant agreement during the grant period. During the grant period is the time between the effective date of the award and the ending dat…
Chapter 17. Grant Policy-1723 Property
2.2K chars
A. Title to real property and equipment acquired under a grant shall vest, upon acquisition, in the grantee. 1. Real Property. Land including land improvements, structures and appurtenances thereto, but excluding movable machinery and equipment. a. The property shall be used for …
Chapter 17. Grant Policy-1725 Equipment Management Requirements
1.5K chars
A. Requirements for managing equipment until transfer, replacement or disposition takes place shall, as a minimum meet the following requirements. 1. Property records shall be maintained accurately. (Retention and access requirements for these records are explained in §1725). 2. …
Chapter 17. Grant Policy-1727 Procurement Standard
1.3K chars
A. Code of Conduct. The recipient shall maintain a code of standards of conduct that shall govern the performance of its officers, employees or agents engaged in the awarding and administration of contracts. The code or standards shall provide for disciplinary actions to be appli…
Chapter 17. Grant Policy-1729 Monitoring
1.8K chars
A. Monitoring by Recipients. Recipients shall monitor the performance of grant supported activities. They shall review each program function, or activity to assure that adequate progress is being made towards achieving the goals of the grant. A performance report will be required…
Chapter 17. Grant Policy-1731 Retention and Access Requirements for Records
1.0K chars
A. All financial and programmatic records, supporting documents, statistical records and other records of recipients under grants shall be retained for three years after expiration date of grant. B. Equipment Records. The retention period for the equipment records starts from the…
Chapter 17. Grant Policy-1733 Programmatic Changes and Budget Revisions
2.0K chars
A. When requesting a prior approval, grantees shall address their request to the responsible LRS grants officer. Approvals shall not be valid unless they are in writing and signed by the authorized LRS official. Within 30 days from the date of receipt of a request for approval, t…
Chapter 17. Grant Policy-1735 Contract Provisions
1.3K chars
A. All contracts shall contain sufficient provisions to define a sound and complete agreement. B. Contracts shall contain suitable provisions for termination by Louisiana Rehabilitation Services. C. Audit Requirements. 2 CFR Part 200, Subpart F. D. The grantee shall furnish LRS w…
Chapter 17. Grant Policy-1737 Insurance
0.1K chars
A. Recipients shall observe LRS' requirements and practices with respect to bonding and insurance as specified in contract agreement.
Chapter 17. Grant Policy-1739 Grant Closeout
1.0K chars
A. Each grant shall be closed out as promptly as is feasible after termination. In closing out grants, the following shall be observed. 1. Upon request LRS shall promptly pay the grantee for any allowable reimbursable costs not covered by previous payments. 2. The grantee shall i…
Chapter 17. Grievance Procedure-1701 Right to File a Grievance
0.5K chars
A. Any person may file a grievance under this procedure. However, no offender or parolee shall have the right to file a grievance against the board or committee members for the decisions enumerated in R.S. 15:574.11. B. A grievance must be based upon a violation of the on Louisia…
Chapter 17. Grievance Procedure-1703 Complaint Process
2.2K chars
A. All grievances must be made in writing and submitted to the chairman of the Board of Pardons. Upon receipt, the chairman shall review the grievance and, if appropriate, forward it to the proper agency or authority for further action. B. If the grievance relates to the board, o…
Chapter 17. Grievance Procedure-1705 Resolution of Grievance
0.4K chars
A. A written response to the grievance shall be mailed to the complaining party. B. If it is determined that a board member has violated the Louisiana Committee on Parole rules and procedures, Department of Public Safety and Corrections regulations, or the Louisiana Revised Statu…
Chapter 17. Industry Assistance Program-1701 Use of Louisiana Contractors, Labor and Supplies
1.3K chars
A. The Louisiana Department of Economic Development (“LED”) and the Board of Commerce and Industry (“board”) encourages applicants and their contractors to give preference and priority to Louisiana manufacturers and in the absence of Louisiana manufacturers, to Louisiana supplier…
Chapter 17. Industry Assistance Program-1703 Qualifications
0.7K chars
A. To qualify for the exemption, in whole or in part, from the taxation referenced in Section 1715, the applicant must be: 1. a person defined as an employer within the meaning of R.S. 51:2453(1)(b)(1) and in §1105.A.1-A.5 of the quality jobs rules promulgated by this board; 2. a…
Chapter 17. Industry Assistance Program-1705 How to Apply
2.4K chars
A. An "Advance Notification" of intent to file for Industry Assistance shall be filed by the company at least 90 days prior to filing an application. An advance notification fee of $100 shall be submitted with the prescribed advance notification form. B. Application to the Board …
Chapter 17. Industry Assistance Program-1707 Additional Information May Be Required
0.2K chars
A. In addition to the information contained in the application, the applicant shall make available any additional information and records that LED and/or the board may request.
Chapter 17. Industry Assistance Program-1709 Public Hearings
0.5K chars
A. The Board of Commerce and Industry shall conduct a public hearing on an application for exemption that receives the recommendation of the secretary of Economic Development who, personally or through his designee, shall present his recommendations to the Board of Commerce and I…
Chapter 17. Industry Assistance Program-1711 Requirements for Exemption
1.4K chars
A. The secretary of Economic Development, the Board of Commerce and Industry, the governor and the Joint Legislative Committee of the Budget may consider any and all factors which are relevant to the continued operations of the applicant. These should include, but not be limited,…
Chapter 17. Industry Assistance Program-1713 Approval of the Joint Legislative Committee of the Budget and the Governor
0.9K chars
A. The Board of Commerce and Industry, after acting on the application, shall forward its recommendations together with all supporting documents and the recommendations of the Department of Economic Development to the governor and the Joint Legislative Committee of the Budget the…
Chapter 17. Industry Assistance Program-1715 Taxes to be Exempt
1.3K chars
A. The Department of Economic Development shall report to the governor and to the Joint Legislative Committee of the Budget the effect upon the applicant of the taxes or portions thereof to be exempt. Taxes that may be exempted include: 1. the corporation franchise tax; 2. sales …
Chapter 17. Industry Assistance Program-1717 Limits to Amount of Tax Exemption
0.7K chars
A. The total amount of tax exemptions that can be granted to any single applicant shall be reasonably proportionate to the amount that shall be granted to other applicants based upon each applicant’s total number of employees in Louisiana and amount of capital investment in Louis…
Chapter 17. Industry Assistance Program-1719 Contract Subject to Annual Audit and Review
1.0K chars
A. The contract shall provide that the applicant will be subject to an annual audit by the Louisiana legislative auditor. The company will receive notice of the annual review 45 days in advance. A review fee of $100 must be returned and received 15 days prior to the appointment d…