18 chapters · 122 sections in this title.
Mich. Comp. Laws § 29.5j Terminal at which tank filled by pipeline; high level alarm system; testing; plans and specifications; final inspection; fire and emergency plan.
1.8K chars
Sec. 5j. (1) Each terminal at which a tank filled by pipeline is located shall comply with the following requirements: (a) Each terminal shall be equipped with a high level alarm system. (b) The high level alarm system shall be set to activate at a predetermined level in each tan…
Mich. Comp. Laws § 29.5k Attended terminal at which tank filled by pipeline; high level alarm system.
1.0K chars
Sec. 5k. In addition to the requirements specified in section 5j, each attended terminal at which a tank filled by a pipeline is located shall comply with the following requirements: (a) The high level alarm system at the terminal shall provide an audible sound of sufficient deci…
Mich. Comp. Laws § 29.5l Unattended terminal at which tank filled by pipeline; high level alarm system.
0.6K chars
Sec. 5l. In addition to the requirements specified in section 5j, each unattended terminal at which a tank filled by pipeline is located shall comply with the following requirements: (a) The high level alarm system shall be capable of systematically shutting off or diverting the …
Mich. Comp. Laws § 29.5m Remote control terminal at which tank filled by pipeline; high level alarm system; equipment; sounding of audible trouble alarm.
0.7K chars
Sec. 5m. In addition to the requirements specified in section 5j, each remote control terminal at which a tank filled by pipeline is located shall be equipped with a high level alarm system which is fail-safe and will provide an audible trouble signal at the remote control point.…