ORDER FOR DETAILED SURVEY AND SURVEY REPORT.

Minn. Stat. § 103E.265, under Chapter 103E. DRAINAGE.

Minn. Stat. § 103E.265

103E.265 ORDER FOR DETAILED SURVEY AND SURVEY REPORT. § Subdivision 1.Order. When the preliminary hearing order is filed with the auditor, the drainage authority shall order the engineer to make a detailed survey with plans and specifications for the proposed drainage project and submit a detailed survey report to the drainage authority as soon as possible. § Subd. 2.Waiver. The drainage authority may waive the detailed survey order and the detailed survey if it determines that adequate data, plans, and specifications have been furnished by a United States engineer. History: 1990 c 391 art 5 s 41