322 sections in this chapter.
R.255.614 § 255.614 Damage prevention program.
0.7K chars
(a) Each operator of a buried pipeline shall carry out a written program to prevent damage to that pipeline by excavation activities in accordance with 16 NYCRR Part 753, Protection of Underground Facilities. Each operator of a buried pipeline, except for gathering lines in Class…
R.255.615 § 255.615 Emergency plans.
3.1K chars
(a) Each operator shall establish written procedures to minimize the hazard resulting from a gas pipeline emergency. At a minimum, the procedures must provide for the following: (1) receiving, identifying and classifying notices of events which require immediate response by the o…
R.255.616 § 255.616 Customer education and information program.
3.9K chars
(a) Except for an operator of a petroleum gas system covered under subdivision (j) of this section, each pipeline operator must develop and implement a written continuing public education program that follows the guidance provided in the American Petroleum Institute's (API) Recom…