13,942 sections across 1,673 North Dakota regulatory chapters.
33.1-25-01-N.D. Admin. Code § 33.1-25-01-05 Identification of underground sources of drinking water and exempted
2.1K chars
aquifers. 1. The director may identify and shall protect as an underground source of drinking water all aquifers or parts of aquifers which: a. Supply any public water system; or b. Contain a sufficient quantity of ground water to supply a public water system and: (1) Currently s…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-06 Permitting
5.6K chars
1. Application for a permit. a. Any person who is required to have a permit shall complete, sign, and submit an application to the director. b. When the owner and operator are different, it is the operator's duty to obtain a permit. c. The application must be complete before the …
33.1-25-01-N.D. Admin. Code § 33.1-25-01-07 Area permits
1.8K chars
1. The director may issue a permit on an area basis, rather than for each well individually; provided, that the permit is for injection wells: a. Described and identified by location in permit applications, if they are existing wells; b. Within the same well field, facility site,…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-08 Draft permits and fact sheets
2.8K chars
1. Draft permits. a. When the application is complete, the director shall tentatively decide to either prepare a draft permit or deny the application. b. If the director decides to prepare the draft permit, it shall contain the following information: (1) All required permit condi…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-09 Public notice and comment - Requests for hearings - Public hearings -
2.3K chars
Response to comments. 1. Public notice. a. The director shall give public notice that the following actions have occurred: (1) A draft permit has been prepared. (2) A hearing has been scheduled. (3) Intent to deny a permit application. b. Public notice shall be given to allow thi…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-10 Conditions applicable to all permits
2.8K chars
1. 1. The general conditions contained under title 40 CFR part 144, section 144.51 apply to class I and class V underground injection control permits. All conditions shall be incorporated into the permits, either expressly or by reference. 2. A permittee may not commence injectio…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-11 Technical requirements
5.9K chars
1. Construction requirements. a. (1) Existing wells shall achieve compliance with construction requirements prior to permitting or according to a compliance schedule established as a permit condition. 10 (2) New injection wells shall submit plans for testing, drilling, and constr…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-12 Plugging and abandonment
2.0K chars
1. Any class I permit shall include, and any class V permit may include, a plan for plugging and abandonment which shall be incorporated into the permit as a condition to ensure that movement of fluids either into an underground source of drinking water or between underground sou…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-13 Mechanical integrity
1.7K chars
1. A permit for any class I well shall include, and for any class V well may include, a condition prohibiting injection operations until the permittee shows to the satisfaction of the director that the well has mechanical integrity. 2. An injection well has mechanical integrity i…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-14 Area of review
0.5K chars
The area of review for each injection well or each field, project, or area of the state shall be determined according to title 40 CFR part 146, section 146.6 (for nonhazardous waste injection wells) or title 40 CFR part 146, section 146.63 (for hazardous waste injection wells). 1…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-15 Schedules of compliance
1.0K chars
1. The compliance schedule of a class I nonhazardous waste injection well or a class V injection well must require compliance as soon as possible, and not later than three years after the effective date of the permit. 2. If the schedule of compliance is for more than one year, th…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-16 Authorization of class V underground injection wells
6.6K chars
1. Authorization of injection into a class V well is authorized indefinitely, subject to the requirements of subsections 4, 5, and 6 of section 33.1-25-01-10 and subsection 3 of section 33.1-25-01-12, and title 40 CFR part 144, sections 144.84(b)(1) through (4). 2. The owner or o…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-17 Requirements for hazardous waste injection wells
0.5K chars
The owner or operator of all wells injecting hazardous waste shall comply with the requirements for hazardous waste management facilities as specified under title 40 CFR parts 144, 146, including subpart G, part 148 and including specifically section 144.14. History: Effective Ja…
33.1-25-01-N.D. Admin. Code § 33.1-25-01-18 Class IV wells
0.5K chars
All class IV wells are prohibited except wells used to inject contaminated ground water that has been treated and is being injected into the same formation from which it was drawn if such injection is approved by the director in accordance with title 40 CFR part 144, section 144.…
33.1-34-01-N.D. Admin. Code § 33.1-34-01-01 Analytical specifications
3.1K chars
1. Petroleum and fuel product specifications. Petroleum and fuel products, including gasoline, alcohol-blended gasoline, diesel, tractor fuel, fuel oil (heating oil), kerosene, biodiesel, biodiesel blends, and all other alternative fuels shall comply with the most current applica…
33.1-34-01-N.D. Admin. Code § 33.1-34-01-02 Labeling specifications
5.7K chars
1. Posted octane rating. The posted octane rating of a gasoline or alcohol-blended gasoline is the mathematical average of the octane as determined by the ASTM D2699 Research Method engine test and the octane as determined by the ASTM D2700 Motor Method engine test. a. The posted…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-01 Definitions
3.9K chars
For the purpose of this chapter, the following definitions apply: 1. "Act" means the federal Water Pollution Control Act of 1972, Public Law 92-500, as amended by the Water Quality Act of 1987 [Pub. L. 100-4; 33 U.S.C. 1251-1376]. 2. "Bank of North Dakota" means the Bank of North…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-02 Eligibility
1.8K chars
1. A political subdivision is eligible for financial assistance under the state revolving fund if its project is included in the current intended use plan. 2. Loans may be made only to political subdivisions that: a. Demonstrate tangible financial capability to assure sufficient …
33.1-35-01-N.D. Admin. Code § 33.1-35-01-03 Refinancing
0.5K chars
Loans may be made to political subdivisions to refinance existing debt obligations if they were incurred and building was initiated after March 7, 1985, and if the debts were used to finance projects identified in the intended use plan. In addition, the projects must satisfy the …
33.1-35-01-N.D. Admin. Code § 33.1-35-01-04 Intended use plan
0.6K chars
The department will annually prepare a wastewater treatment works construction priority list according to the department's review and point award. All proposed wastewater treatment works must be on the priority list in order to be funded under the state revolving fund program. It…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-05 Annual public hearing on proposed intended use plan
0.7K chars
Upon tentative completion of the annual revision of the intended use plan, the department shall conduct a hearing to receive oral and written comments from the public on the proposed intended use plan. At least thirty calendar days' notice must be given of the public hearing in a…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-06 Emergency amendment of intended use plan
0.7K chars
The department may add a project to the intended use plan, by emergency amendment, if the proposed project will alleviate or mitigate a dire physical threat to the health and safety of persons or if the proposed project is necessary to take advantage of an unexpected economic dev…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-07 Project priority list removal procedure
0.4K chars
The department may remove a project from the intended use plan if the project has been fully funded or the project is no longer eligible under the priority system or the political subdivision responsible for the project has expressed in writing no interest in the program. History…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-08 Project bypass procedure
0.5K chars
The department may bypass the priority established for funding as follows: 1. The political subdivision being bypassed provides to the state a written statement endorsing the bypass; or 2. The political subdivision being bypassed fails to submit information within the timeframe r…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-09 Deadline for application
0.3K chars
Project assistance applications may be submitted at any time by eligible political subdivisions. History: Effective January 1, 2019. General Authority: NDCC 61-28.2-01; S.L. 2017, ch. 199, § 1 Law Implemented: NDCC 61-28.2-01; S.L. 2017, ch. 199, § 70
33.1-35-01-N.D. Admin. Code § 33.1-35-01-10 Reserve for section 319 nonpoint source management projects
0.4K chars
The department may set aside a portion of the available funds for section 319 nonpoint source projects for the first six months of each fiscal year. The amount of the set-aside must be determined by the department. History: Effective January 1, 2019. General Authority: NDCC 61-28…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-11 Application procedure
0.5K chars
The application procedure will be designed by the department and approved by the environmental protection agency to include all necessary requirements as contained in the Act and applicable federal regulations, state laws, and rules. The application procedure will be contained in…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-12 Loan agreement
0.8K chars
1. The loan agreement will be a legally binding contract between the financial agent and the political subdivision. The agreement will contain general conditions and may, if necessary, contain special conditions. 2. The general conditions of a loan agreement will include the requ…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-13 Release
0.4K chars
By its acceptance of the loan agreement, the political subdivision releases and discharges the department, its officers, agents (including its financial agent), and employees from all liabilities, obligations, and claims arising out of the project work under the loan agreement. H…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-14 Loan amendments
0.4K chars
The loan agreement may be amended in writing according to the terms of the respective loan agreement including an amendment when the amount of loan funds necessary to pay project costs are greater than the original amount in the loan agreement. History: Effective January 1, 2019.…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-15 Inspections
0.6K chars
During the building of the project, the political subdivision shall provide inspection services sufficient to ensure that the project is constructed in accordance with approved plans and specifications. The department will conduct interim project inspections to determine complian…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-16 Loan default
1.0K chars
The political subdivision must agree that upon default in the payments of principal and accrued interest on the loan or in the performance of any covenant or condition of the loan agreement, the department, through its financial agent, may at its option, do one or more of the fol…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-17 Financing method
1.2K chars
1. A loan shall be made for a period of time not to exceed thirty years or the design life of the wastewater treatment works facility, whichever is shorter. 2. Interest on the loan accrues and must be paid as provided in the loan agreement. 3. All repayment schedules must be esta…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-18 Interest rate determination
0.6K chars
The interest rate on a loan will be determined by the department with consultation from the financial agent and must be based on the combined costs related to the total financial state revolving fund loan package. The interest rates on individual loans may vary; however, the rate…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-19 Amount of financial assistance
0.7K chars
A political subdivision may apply for any amount of financial assistance. The department may award less than the amount requested in the application. In determining the financial assistance for 6 each political subdivision, the department may consider the proposed construction an…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-20 Files and records
0.5K chars
All files and records pertaining to the project must be maintained by the political subdivision throughout the project and made accessible to the department and the environmental protection agency and their agents according to state and federal law. These files and records must b…
33.1-35-01-N.D. Admin. Code § 33.1-35-01-21 Reservation of rights
1.4K chars
1. Nothing in this chapter prohibits a political subdivision from requiring more assurances, guarantees, indemnity, or other contractual requirements from any party performing project work. 2. Nothing in this chapter affects the department's right to take remedial action, includi…
37-01-01-N.D. Admin. Code § 37-01-01-01 Organization and functions of department of transportation
2.5K chars
1. Organization of the department. a. History. The state highway department was created, in its organizational concept, by chapter 159 of the 1927 Session Laws. Extensive changes in duties and responsibilities were made by the enactment of chapter 177 of the 1953 Session Laws and…
37-02-01-N.D. Admin. Code § 37-02-01-01 Facing material
0.4K chars
The identification emblem (see Figure 1) consists of a fluorescent yellow-orange triangle with a dark red reflective border. The yellow-orange fluorescent triangle is for daylight identification. The reflective border defines the shape of the fluorescent color in daylight and bec…
37-02-01-N.D. Admin. Code § 37-02-01-02 Visibility
0.3K chars
The emblem shall be entirely visible in daylight and at night from all distances between six hundred feet and one hundred feet [182.88 meters to 30.48 meters] from the rear when directly in front of lawful upper beam of headlamps. General Authority: NDCC 39-21-50 Law Implemented:…
37-02-01-N.D. Admin. Code § 37-02-01-03 Color values
0.4K chars
The spectrophotometric color values of the yellow-orange fluorescent material shall have a dominant wave length of five hundred ninety to six hundred ten millimicrons and a purity of ninety-eight percent before test. After the durability test under section 37-02-01-08, the domina…
37-02-01-N.D. Admin. Code § 37-02-01-04 Minimum reflective values
2.5K chars
The reflective material shall have minimum intensity values at each of the angles listed in this section. After the durability test under section 37-02-01-08, the minimum reflective intensity values for the reflective material shall not change more than twenty percent from the va…
37-02-01-N.D. Admin. Code § 37-02-01-05 Material strength
0.5K chars
The reflective and fluorescent materials shall be tough, flexible, and of sufficient thickness and strength to meet the requirements of sections 37-02-01-02 through 37-02-01-10. After the durability test under section 37-02-01-08, the fluorescent and reflective material shall sho…
37-02-01-N.D. Admin. Code § 37-02-01-06 Backing material
0.5K chars
Backing material for portable emblems shall be equivalent to four-hundredths of an inch [1.016 millimeters] minimum thickness aluminum, 22 gage [.03 inches or 0.762 millimeters] minimum thickness mill-galvanized or coated sheet steel with the surface clean and receptive to a dura…
37-02-01-N.D. Admin. Code § 37-02-01-07 Testing standards
0.5K chars
The emblem shall be tested in conformance with the following sections from SAE J575, Tests for Motor Vehicle Lighting Devices and Components: Section B - Samples for Tests Section D - Laboratory Facilities Section E - Vibration Test Section H - Corrosion Test (pertains to face of…
37-02-01-N.D. Admin. Code § 37-02-01-08 Durability test
0.7K chars
Samples shall be exposed to the sun at an angle of forty-five degrees to horizontal and facing south per American Society for Testing and Materials, ASTM D 1014, Method of Conducting Exterior Exposure Tests of Paints on Steel. DURABILITY TEST PERIODS Minimum Test Period, months: …
37-02-01-N.D. Admin. Code § 37-02-01-09 Replacement of fluorescent material
0.4K chars
The yellow-orange fluorescent material in the center of the emblem shall be replaced when not visible in normal sunlight for a distance of six hundred feet [182.88 meters]. The red fluorescent material shall be replaced when not visible at night for a distance of six hundred feet…
37-02-01-N.D. Admin. Code § 37-02-01-10 Strength test
0.5K chars
Each test sample shall be dropped from a height of five feet [1.53 meters] to a smooth, hard surface equivalent to rigid metal or concrete. Each test sample shall be submitted to three drop tests: 3 corner drop, edge drop, and flat drop. Failure shall be considered to have occurr…
37-02-02-N.D. Admin. Code § 37-02-02-01 Mounting
0.7K chars
The emblem shall be mounted point up (see Figure 1) in a plane perpendicular to the direction of travel. It shall be placed centrally at the rear of the vehicle, unobscured, and two to six feet [1 to 1.83 meters] above the ground measured from the lower edge of the emblem. It may…
37-02-02-N.D. Admin. Code § 37-02-02-02 Use of emblem
0.3K chars
The emblem shall not replace such warning devices as tail lamps, reflectors, flashing lights, or warning flags and is not to be used as a clearance marker for wide equipment. General Authority: NDCC 39-21-50 Law Implemented: NDCC 39-21-50 1 2…