13,942 sections across 1,673 North Dakota regulatory chapters.
43-02-02.1-N.D. Admin. Code § 43-02-02.1-10 Public notice and comment - Requests for hearings - Public hearings -
2.2K chars
Response to comments. 1. Public notice. a. The commission shall give public notice that the following actions have occurred: (1) A draft permit has been prepared; (2) A hearing has been scheduled; or (3) Intent to deny a permit application. b. Public notice must be given to allow…
43-02-02.1-N.D. Admin. Code § 43-02-02.1-11 Permit conditions
0.2K chars
All permits must contain the conditions specified in 40 CFR 144.51 and 144.52. History: Effective March 1, 1984. General Authority: NDCC 38-12-03 Law Implemented: NDCC 38-12-03
43-02-02.1-N.D. Admin. Code § 43-02-02.1-12 Technical requirements
1.6K chars
1. Construction requirements. a. General. (1) Existing wells must achieve compliance with construction requirements prior to permitting or according to a compliance schedule established as a permit condition. (2) New injection wells must be in compliance with construction require…
43-02-02.1-N.D. Admin. Code § 43-02-02.1-13 Plugging and abandonment
0.8K chars
1. Any Class III permit must include conditions to ensure the well will be plugged and abandoned so that movement of fluids is not allowed either into an underground source of drinking water or between underground sources of drinking water. 2. Any underground injection control pe…
43-02-02.1-N.D. Admin. Code § 43-02-02.1-14 Mechanical integrity
0.4K chars
A permit for any Class III well or injection project which lacks mechanical integrity must include a condition prohibiting injection operations until the state geologist is satisfied that the specifications for mechanical integrity listed in 40 CFR 146.08 have been met. History: …
43-02-02.1-N.D. Admin. Code § 43-02-02.1-15 Area of review
0.2K chars
The area of review for each injection well or each field, project, or area of the state must be determined according to 40 CFR 146.06. History: Effective March 1, 1984. General Authority: NDCC 38-12-01 Law Implemented: NDCC 38-12-02
43-02-02.1-N.D. Admin. Code § 43-02-02.1-16 Schedules of compliance
0.7K chars
1. The compliance schedule must require compliance as soon as possible, and not later than three years, after the effective date of the permit. 2. If the compliance schedule is set for a duration of more than one year, interim requirements and completion dates (not to exceed one …
43-02-02.1-N.D. Admin. Code § 43-02-02.1-17 Confidentiality of information
0.4K chars
The following information cannot be claimed confidential: 1. Name and address of permit applicant or permittee. 6 2. Information which deals with the existence, absence, or level of contaminants in drinking water. History: Effective March 1, 1984. General Authority: NDCC 38-12-02…
43-02-02.1-N.D. Admin. Code § 43-02-02.1-18 Authorization by rule
0.3K chars
The commission, acting by and through the state geologist, may authorize Class III underground injection by rule as outlined in 40 CFR 144.21, 144.25, and 144.26. History: Effective March 1, 1984. General Authority: NDCC 38-12-02 Law Implemented: NDCC 38-12-02
43-02-02.1-N.D. Admin. Code § 43-02-02.1-19 Penalties
0.3K chars
Any person who violates any provision of this chapter or any permit conditions is subject to the penalties prescribed in North Dakota Century Code sections 38-08-16 and 38-08-17. History: Effective March 1, 1984. General Authority: NDCC 38-12-05 Law Implemented: NDCC 38-12-05 7…
43-02-02.2-N.D. Admin. Code § 33.1-18-01-06 The department may approve an alternative casing design if it
3.6K chars
provides an equivalent degree of ground water protection; (2) Before placing the annular seal, the well bore must be under static conditions and all loose drill cuttings, rock chips, or other obstructions must be removed from the annular space by circulating the borehole with wat…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-01 Definitions
15.7K chars
Terms in this chapter have the same meaning as in North Dakota Century Code chapter 38-12, except: 1. "Abandoned well" means a well whose use has been permanently discontinued or that is in such a state of disrepair that it cannot be used for its intended purpose or for observati…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-02 Scope of chapter
0.8K chars
This chapter contains general rules adopted to conserve the natural resources of North Dakota and to prevent pollution of freshwater supplies, to provide for the protection of the environment and public safety, to ensure the optimum recovery of the mineral resource, and the recla…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-03 Permit required
0.4K chars
A permit is required prior to commencement of mining. The commission shall review the facility permit at least once every five years to determine whether the permit should be amended, modified, or revoked. History: Effective January 1, 2009; amended effective October 1, 2020. Gen…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-04 Submission of permit application
0.4K chars
Any person who conducts or expects to conduct mining operations shall file with the department a complete permit application and all required materials. The applicant shall file with the department proof that it submitted a copy of the application to the county recorder in the co…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-05 Review for completeness
0.6K chars
The department will determine whether the application is complete. The department will notify the applicant in writing, within thirty days after the application is submitted, whether the application is complete or specify deficiencies that must be corrected in order to complete t…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-06 Review period
0.8K chars
1. The department will have one hundred eighty days after the filing date to approve or disapprove the application. 2. The department may extend the review period not to exceed an additional one hundred eighty days if: a. Additional time is needed to correct application deficienc…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-07 Permit application and annual operating fees
0.4K chars
A fee of twenty thousand dollars must accompany the permit application. Permit revisions may require additional fees not to exceed ten thousand dollars. The annual operating fees must be based upon the costs to monitor and inspect the facility. History: Effective January 1, 2009;…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-08 Notice of hearing
0.5K chars
The commission will give thirty days' notice (except in an emergency) to the general public of the time and place of the hearing on the application. Immediately upon receiving notice of the hearing date, the permit applicant shall give notice by certified mail to surface and subs…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-09 Information added after filing date
0.7K chars
Additional information submitted to the department by the applicant to supplement, correct, amend, or clarify an application following the filing date must also be submitted with the county recorder in the county or counties in which the proposed permit area is located. The addit…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-10 Notice to agencies
0.3K chars
Within the first ten days of the review period of a permit application, the department shall send copies of the application to the department of agriculture, the state department of health, and to the state water commission. History: Effective January 1, 2009. General Authority: …
43-02-02.2-N.D. Admin. Code § 43-02-02.2-11 Summary document
0.3K chars
The permit application must contain a summary document that describes the main elements of the operation and identifies the major environmental issues involved. History: Effective January 1, 2009. General Authority: NDCC 38-12-03 Law Implemented: NDCC 38-12-03
43-02-02.2-N.D. Admin. Code § 43-02-02.2-12 Permit approval or denial
0.3K chars
Within ninety days of the hearing, or a reasonable time thereafter, the department will notify the applicant of the commission's decision as to whether the permit is approved or denied. History: Effective January 1, 2009. General Authority: NDCC 38-12-03 Law Implemented: NDCC 38-…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-13 Bond
1.0K chars
1. Before any person receives a mining permit, the person shall submit to the department and obtain its approval of a surety bond or cash bond. An alternate form of security may be 9 approved by the department. Each such surety bond must be executed by a responsible surety compan…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-14 Permit application - General requirements
0.9K chars
1. All applications must be submitted in a format satisfactory to the department. The applicant shall provide information that is complete, current, presented clearly and concisely, and supported by appropriate references to technical and other written material. All technical ana…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-15 Permit application - General contents
7.6K chars
1. The application must: a. Describe by legal description the land for which a permit is sought. b. Identify all property interests the applicant holds, including options, in the lands for which a permit is sought and in all contiguous land. This identification must cover surface…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-16 Permit application - Additional baseline information
6.2K chars
1. Baseline water quality and water level data must be submitted with the application. The data must represent at least a one-year period during which data is collected monthly unless the applicant can demonstrate to the department's satisfaction that less frequent sampling or sa…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-17 Permit application - Mine operations plan
9.6K chars
Applications must include a mining plan, which must include: 1. A narrative description of the mining and milling techniques to be employed, including plan view maps of the proposed mining; 2. A narrative description of the proposed depth and direction of mining including represe…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-18 Permit application - Reclamation plan
3.6K chars
Applications must include a reclamation plan that contains the following: 1. Discussion and information necessary to demonstrate that ground water restoration will be achieved, including: a. A list of the proposed wellfields; b. A map showing the estimated sequence for restoring …
43-02-02.2-N.D. Admin. Code § 43-02-02.2-19 Determination of ground water restoration demonstration
0.4K chars
In deciding whether a sufficient demonstration has been made by the operator under subsection 1 of section 43-02-02.2-18, the department shall consider the premining baseline water quality and geochemistry, including up-gradient and down-gradient aquifers and the direction and ve…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-20 Ground water restoration values
1.3K chars
1. Based upon the information submitted under subsection 1 of section 43-02-02.2-18 and the determination under section 43-02-02.2-19, the department shall develop a tabulation of assigned ground water quality restoration values that are the compliance requirements for restoring …
43-02-02.2-N.D. Admin. Code § 43-02-02.2-21 Establishing baseline water quality and control parameters in new mining
2.1K chars
areas. 1. Before mining a new area in a production zone, the operator shall submit a baseline ground water quality sampling plan that includes an adequate number of wells and samples to adequately characterize baseline water quality in production and nonproduction zones in and ad…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-22 Technical revisions to an in situ leach mine permit
1.1K chars
The department, through permit conditions, may approve proposed technical revisions to the injection well portion of a permit without requiring a permit amendment. These revisions may include the following: 1. Correcting typographical errors; 2. Modifying monitoring plan reportin…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-23 Designation of exempted aquifers
1.4K chars
The department, after notice and hearing, may exempt an aquifer or a portion of an aquifer and designate it as an exempted aquifer for class III underground injection control if it meets the following criteria: 1. It does not currently serve as a source of drinking water; and 2. …
43-02-02.2-N.D. Admin. Code § 43-02-02.2-24 Injection wells subject to this chapter
0.2K chars
An injection well for mining must comply with this chapter. History: Effective January 1, 2009. General Authority: NDCC 38-12-02 Law Implemented: NDCC 38-12-02
43-02-02.2-N.D. Admin. Code § 43-02-02.2-25 Well location and protection
2.0K chars
In selecting well locations, protecting wells, and maintaining well covers, the following requirements apply: 1. The top of the casing must end at least twelve inches [30.48 centimeters] above grade. The top of the casing must end at least twenty-four inches [60.96 centimeters] a…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-26 Well construction requirements - General
1.1K chars
1. Construction requirements listed in this section apply to all wells installed for activities related to mining. 2. The department may grant a deviation from the requirements through a technical revision, if the operator proves that alternative requirements are reliable, ensure…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-27 Well construction requirements - Injection wells
1.9K chars
The following construction requirements apply to injection wells and are in addition to the requirements of section 43-02-02.2-26: 1. Appropriate logs and other tests must be maintained and conducted during the drilling and construction of injection wells. A descriptive report pr…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-28 Monitoring wells - Minimum requirements
0.8K chars
In determining the number, location, and construction of monitoring wells, and the frequency of sampling from monitoring wells, the following must be considered: 1. Whether any person relies on the underground source of drinking water affected or potentially affected by the injec…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-29 Disposal of drill cuttings
1.3K chars
1. The operator may dispose and bury drill cuttings in a pit at the well site, such as the mud pit used to circulate drilling fluids, once the drilling operation is complete, if: a. The drill cuttings are generated from the well at the well site; b. The drill cuttings are not con…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-30 Mechanical integrity
3.5K chars
1. Injection and production wells must maintain mechanical integrity until the wells are plugged under the approved plugging and abandonment plan. 2. Before putting a new injection well into service, its mechanical integrity must be tested. A schedule and methods for mechanical i…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-31 Supervision of well construction and testing
0.3K chars
All phases of well construction and testing must be done under the supervision of a water well or monitoring well contractor pursuant to chapter 33.1-18-01 and North Dakota Century Code chapter 43-35. History: Effective January 1, 2009; amended effective October 1, 2020. General …
43-02-02.2-N.D. Admin. Code § 43-02-02.2-32 Requirements for plugging drill holes and repair, conversion, and plugging
2.6K chars
wells. The requirements for plugging drill holes and repairing, converting, and plugging wells are as follows: 1. All drill holes must be plugged under subsection 19 of section 33.1-18-01-06 requirements, as applicable, in a manner that will not allow fluids to move either into o…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-33 Corrective actions for improperly sealed wells
1.3K chars
1. Improperly sealed, completed, or abandoned wells must be corrected. The operator shall submit a plan, for department approval, that sets forth actions to be taken to prevent movement of fluid between or into water-bearing strata, including underground sources of drinking water…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-34 Authorizing new injection wells within permit area boundary
0.5K chars
The department may approve proposed technical revisions under section 43-02-02.2-22 to allow the operator to construct and operate new injection wells within the permit area if: 1. The wells meet the construction requirements; and 2. The cumulative effect of drilling and operatin…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-35 Design and construction of surface facilities
1.0K chars
1. The operator shall submit plans and specifications to the department before constructing the following surface facilities: a. Process or recovery plants and satellite facilities; 27 b. Ponds and impoundments; c. Pipelines; d. Well houses or transfer stations; e. Fuel storage a…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-36 Construction quality assurance plan
1.3K chars
1. The operator shall develop, for the department's approval, a construction quality assurance plan that addresses all aspects of constructing surface facilities. The plan must include the following: a. A description of the responsibilities and authorities of key personnel, inclu…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-37 Pipeline design and construction requirements
1.3K chars
1. Pipeline systems must be constructed with materials that have the strength, thickness, and chemical properties that prevent failure due to pressure gradients, physical contact with the waste or fluids to which the pipes are exposed, climatic conditions, stress of installation,…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-38 Radioactive element recovery plant and satellite facility design and
0.3K chars
construction requirements. Radioactive element mine recovery plants and satellite facilities must be designed and constructed in accordance with United States nuclear regulatory commission requirements. History: Effective January 1, 2009; amended effective October 1, 2020. Genera…
43-02-02.2-N.D. Admin. Code § 43-02-02.2-39 Radioactive element byproduct material handling and disposal systems
0.4K chars
Radioactive solids must be disposed of in accordance with article 33.1-10, United States nuclear regulatory commission source and byproduct material license requirements, and North Dakota Century Code chapters 23.1-02 and 38-23. History: Effective January 1, 2009; amended effecti…