43-05-01-N.D. Admin. Code § 43-05-01-11.2 Logging, sampling, and testing prior to injection well operation
4.5K chars
1. During the drilling and construction of an injection well, the storage operator shall run appropriate logs, surveys, and tests to determine or verify the depth, thickness, porosity, permeability, lithology, and salinity of any formation fluids in all relevant geologic formatio…
43-05-01-N.D. Admin. Code § 43-05-01-11.3 Injection well operating requirements
4.1K chars
1. Except during stimulation, the storage operator shall ensure that injection pressure does not exceed ninety percent of the fracture pressure of the injection zone so as to ensure that the injection does not initiate new fractures or propagate existing fractures in the injectio…
43-05-01-N.D. Admin. Code § 43-05-01-11.4 Testing and monitoring requirements
7.6K chars
The storage operator shall prepare, maintain, and comply with a testing and monitoring plan to verify that the geologic sequestration project is operating as permitted and is not endangering underground sources of drinking water. The requirement to maintain and implement a commis…