Authorization of southwest pipeline project

N.D.C.C. § 61-24.3-03 — under Southwest Pipeline Project.

N.D.C.C. § 61-24.3-03

The preliminary designs for a water supply facility for supplementation of the water resources of a portion of the area of North Dakota south and west of the Missouri River for multiple uses, as set forth in the engineering preliminary design final report for the southwest pipeline project, state water commission project no. 1736, dated September 1982, are hereby confirmed and approved, under the designation of the southwest pipeline project, and the construction of the southwest pipeline project shall be initiated and completed by the state water commission substantially in accordance with plan B of the engineering preliminary design final report, state water commission project no. 1736, dated September 1982, except as otherwise specifically provided in this chapter. The commission shall have the authority to eliminate the construction of any primary or secondary transmission mains which are part of plan B of the engineering preliminary design final report if the water user entities to be served by the primary or secondary transmission mains do not execute water service contracts for the purchase of a sufficient quantity of water, as determined by the commission, to justify the construction of the primary or secondary transmission mains. Chapters 49-22 and 49-22.1 shall not apply to this chapter. The right of way is hereby given, dedicated, and set apart, to locate, construct, and maintain such works over and through any of the lands which are or may be the property of the state.

61-24.3-03.1. Preference for resident pipeline manufacturers and bidders for labor and services. Any contracts for the purchase of pipeline materials, labor, or services awarded by the state water commission in regard to the construction of the southwest water pipeline project must be

awarded to North Dakota resident pipeline manufacturers and North Dakota resident bidders for labor and services making the lowest responsible bids if those bids do not exceed by more than five percent the lowest responsible bid submitted by a nonresident pipeline manufacturer or bidder for labor or services. As used in this section, "North Dakota resident pipeline manufacturers and bidders for labor or services" means bidders or sellers who have maintained a bona fide place of business within this state for at least five years prior to the date on which the contract bid on is awarded. If the state water commission awards any contract for pipeline materials, labor, or services in regard to construction of the southwest water pipeline project to a nonresident bidder, the commission shall publicly give notice in a newspaper of general circulation regarding the specific reasons why it did not award the contract to a resident bidder. This section does not apply to contracts that involve federal moneys when a preference would be contrary to federal laws or regulations, contracts covered under chapter 48-01.2, or to architect, engineer, professional right of way, and land surveying services.