33 chapters · 351 sections in this title.
N.D.C.C. § 49-22-02 Statement of policy
1.2K chars
The legislative assembly finds that the construction of energy conversion facilities and transmission facilities affects the environment and the welfare of the citizens of this state. Therefore, it is necessary to ensure that the location, construction, and operation of energy co…
N.D.C.C. § 49-22-03 Definitions
7.4K chars
In this chapter, unless the context or subject matter otherwise requires: 1. "Backup electric generation" means electric generation that is not interconnected with the grid and is generated on a temporary basis to replace primary source electric generation when unavailable. 2. "C…
N.D.C.C. § 49-22-04 Ten-year plans - Contents
3.1K chars
1. Each utility that owns or operates, or plans within the next ten years to own, operate, or start construction on any facility shall develop a ten-year plan as specified in this section and submit the plan to the commission. Each utility shall file an updated plan on or before …
N.D.C.C. § 49-22-05.1 Exclusion and avoidance areas - Criteria
2.1K chars
1. The commission shall develop criteria to be used in identifying exclusion and avoidance areas and to guide the site, corridor, and route suitability evaluation and designation process. The criteria also may include an identification of impacts and policies or practices which m…