ORS 195.860 Final engineering plans; deadline for local review; writ of mandamus authorized
3.1K chars
(1) As used in this section, final engineering plans means the detailed engineering plans and reports for the design or construction of public and private infrastructure improvements that require review and approval following tentative plat approval by a local government before…
ORS 195.870 Battery-charged fence; preemption of local laws
2.2K chars
(1) As used in this section: (a) Alarm system means any electrical, mechanical or electronic device or sensor used to prevent, detect or alert law enforcement or occupants of burglary, theft, or intrusion of a structure or a vehicle used as a commercial structure. (b) Battery-…
ORS 195.900 Local review of wind energy facility lighting requirements
1.0K chars
The governing body of a county or city or its designee may not allow or permit a wind energy facility, as defined in ORS 195.902, unless the person seeking to develop or repower the wind energy facility provides proof that the person is in compliance with the requirements in ORS …
ORS 195.902 Wind energy facility lighting requirements
3.7K chars
(1) As used in this section: (a) Hub height means the distance from the ground to the middle of a wind-powered turbines rotor. (b) Light-mitigating technology system means a system approved by the Federal Aviation Administration that is capable of reducing the impact of obst…
ORS 195.912 Local review of transmission line upgrade
2.8K chars
(1) As used in this section: (a) Electric company means an electric company, as defined in ORS 757.600, that owns and operates a transmission system and sells more than 2 million megawatt hours of electricity in a calendar year. (b) Footprint means an area that is being activ…