299 sections in this chapter.
ORS 469.287 Tier 2 buildings; requirement and standards for providing data; advisory committee; rules. (1)(a) Not later than December 31, 2024, the State Department of Energy by rule shall establish a requirement and standards under which eligible building owners of tier 2 buildings must provide to the department data that would enable the department to establish a benchmark for energy use in, and greenhouse gas emissions from, tier 2 buildings
2.0K chars
(b) The State Department of Energy shall cooperate with the Department of Education to establish a requirement to provide the data described in paragraph (a) of this subsection in a manner that minimizes costs to schools and avoids or minimizes duplication with the Department of …
ORS 469.289 Contracting to administer incentive payments for early compliance. (1) As used in this section, “person” means an individual, corporation, nonprofit corporation, professional corporation, limited liability company, partnership, limited partnership, limited liability partnership, cooperative, business trust, joint venture or other form of business entity, including Energy Trust of Oregon
1.2K chars
(2) The State Department of Energy may contract with another person to administer incentive payments to eligible building owners for early compliance with the energy performance standard described in ORS 469.277. (3) The person with which the department contracts under subsection…
ORS 469.290 [1989 c.926 §23; 1991 c.641 §8; 1993 c.617 §13; repealed by 1999 c.880 §2]
0.0K chars
[Repealed or reserved.]
ORS 469.291 Incentive program for early and voluntary implementation of standards; application process; rules. (1) The State Department of Energy by rule shall establish a program to pay incentives to eligible building owners that implement ANSI/ASHRAE/IES Standard 100 or the energy performance standard described in ORS 469.277 for covered commercial buildings before adoption and implementation is mandatory. The program must provide for
4.3K chars
(a) An application process; (b) Standards by which the department may qualify an eligible building owner to receive, or disqualify an eligible building owner from receiving, an incentive payment; (c) A method for verifying a covered commercial building’s energy consumption with t…
ORS 469.292 [1989 c.926 §22; 1991 c.641 §9; repealed by 1999 c.880 §2]
0.0K chars
[Repealed or reserved.]
ORS 469.296 [1989 c.926 §17; 1993 c.617 §14; repealed by 1999 c.880 §2]
0.0K chars
[Repealed or reserved.]
ORS 469.298 [1989 c.926 §2; repealed by 1999 c.880 §2]
0.1K chars
REGULATION OF ENERGY FACILITIES (General Provisions)
ORS 469.300 Definitions. As used in ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992, unless the context requires otherwise
14.7K chars
(1) “Applicant” means any person who makes application for a site certificate in the manner provided in ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992. (2) “Application” means a request for approval of a particular site or sites for the construction and operation…
ORS 469.310 Policy. In the interests of the public health and the welfare of the people of this state, it is the declared public policy of this state that the siting, construction and operation of energy facilities shall be accomplished in a manner consistent with protection of the public health and safety and in compliance with the energy policy and air, water, solid waste, land use and other environmental protection policies of this state. It is, therefore, the purpose of ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992 to exercise the jurisdiction of the State of Oregon to the maximum extent permitted by the United States Constitution and to establish in cooperation with the federal government a comprehensive system for the siting, monitoring and regulating of the location, construction and operation of all energy facilities in this state. It is furthermore the policy of this state, notwithstanding ORS 469.010 (2)(f) and the definition of cost-effective in ORS 469.020, that the need for new generating facilities, as defined in ORS 469.503, is sufficiently addressed by reliance on competition in the market rather than by consideration of cost-effectiveness and shall not be a matter requiring determination by the Energy Facility Siting Council in the siting of a generating facility, as defined in ORS 469.503. [Formerly 453.315; 1997 c.428 §1; 2003 c.186 §29]
0.0K chars
(Siting)
ORS 469.320 Site certificate required; exceptions. (1) Except as provided in subsections (2) and (5) of this section, no facility shall be constructed or expanded unless a site certificate has been issued for the site thereof in the manner provided in ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992. No facility shall be constructed or operated except in conformity with the requirements of ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992
9.9K chars
(2) A site certificate is not required for: (a) An energy facility for which no site certificate has been issued that, on August 2, 1993, had operable electric generating equipment for a modification that uses the same fuel type and increases electric generating capacity, if: (A)…
ORS 469.330 Notice of intent to file application for site certificate; public notice; standards, application requirements and study requirements; project order; rules. (1) Each applicant for a site certificate shall submit to the Energy Facility Siting Council a notice of intent to file an application for a site certificate. The notice of intent must provide information about the proposed site and the characteristics of the facility sufficient for the preparation of the State Department of Energy’s project order
1.1K chars
(2) The council shall cause public notice to be given upon receipt of a notice of intent by the council. The public notice shall provide a description of the proposed site and facility in sufficient detail to inform the public of the location and proposed use of the site. (3) Fol…
ORS 469.340 [1975 c.552 §37; 1975 c.606 §26a; repealed by 1981 c.629 §3]
0.0K chars
[Repealed or reserved.]
ORS 469.350 Application for site certificate; comment and recommendation. (1) Applications for site certificates shall be made to the Energy Facility Siting Council in a form prescribed by the council and accompanied by the fee required by ORS 469.421
1.7K chars
(2) Copies of the notice of intent and of the application shall be sent for comment and recommendation within specified deadlines established by the council to the Department of Environmental Quality, the Water Resources Commission, the State Fish and Wildlife Commission, the Wat…
ORS 469.360 Evaluation of notice of intent, site application or expedited review request; costs; payment. (1) The Energy Facility Siting Council shall evaluate each notice of intent, site certificate application or request for expedited review
3.0K chars
(2) Pursuant to a written contract or agreement, the council may compensate a state agency or a local government affected by the application for expenses directly related to participation by the compensated agency or local government in the following evaluation activities: (a) Co…
ORS 469.370 Draft proposed order for hearing; issues raised; final order; expedited processing. (1) Based on its review of the application and the comments and recommendations on the application from state agencies and local governments, the State Department of Energy shall prepare and issue a draft proposed order on the application
8.2K chars
(2) Following issuance of the draft proposed order, the Energy Facility Siting Council shall hold one or more public hearings on the application for a site certificate in the affected area and elsewhere, as the council considers necessary. Notice of the hearing shall be mailed at…
ORS 469.371 [1985 c.569 §5; 1991 c.480 §6; repealed by 1993 c.544 §9]
0.0K chars
[Repealed or reserved.]
ORS 469.372 [1985 c.569 §14; 1985 c.673 §196; repealed by 1993 c.544 §9]
0.0K chars
[Repealed or reserved.]
ORS 469.373 Expedited processing for certain natural gas energy facilities. (1) Notwithstanding the expedited review process established pursuant to ORS 469.370, an applicant may apply under the provisions of this section for expedited review of an application for a site certificate for an energy facility if the energy facility
11.1K chars
(a) Is a combustion turbine energy facility fueled by natural gas or is a reciprocating engine fueled by natural gas, including an energy facility that uses petroleum distillate fuels for backup power generation; (b) Is a permitted or conditional use allowed under an applicable l…
ORS 469.374 [1985 c.569 §15; repealed by 1993 c.544 §9]
0.0K chars
[Repealed or reserved.]
ORS 469.375 Required findings for radioactive waste disposal facility certificate. The Energy Facility Siting Council shall not issue a site certificate for a waste disposal facility for uranium mine overburden or uranium mill tailings, mill wastes or mill by-product or for radioactive waste or radioactively contaminated containers or receptacles used in the transportation, storage, use or application of radioactive material, unless, accompanying its decision it finds
2.5K chars
(1) The site is: (a) Suitable for disposal of such wastes, and the amount of the wastes, intended for disposal at the site; (b) Not located in or adjacent to: (A) An area determined to be potentially subject to river or creek erosion within the lifetime of the facility; (B) Withi…
ORS 469.378 Land use compatibility statement for energy facility. Notwithstanding ORS 197.180, when a state agency action or recommendation concerning an energy facility requires a land use compatibility statement prior to the action being completed, the state agency shall satisfy any applicable requirement of ORS 197.180 by conditioning the agency action or recommendation on a determination by either the Energy Facility Siting Council or the applicable city or county that the energy facility as affected by the state agency action satisfies, or will continue to satisfy, the applicable requirements of ORS 197.180. [2001 c.683 §17]
0.2K chars
Note: 469.378 was added to and made a part of 469.300 to 469.563 by legislative action but was not added to any smaller series therein. See Preface to Oregon Revised Statutes for further explanation.
ORS 469.380 [Formerly 453.375; 1977 c.794 §12; 1977 c.895 §2; 1993 c.569 §9; repealed by 1995 c.505 §32]
0.0K chars
[Repealed or reserved.]
ORS 469.390 [Formerly 453.385; repealed by 1993 c.569 §31]
0.0K chars
[Repealed or reserved.]
ORS 469.400 [Formerly 453.395; 1977 c.794 §13; 1977 c.895 §3; repealed by 1993 c.569 §10 (469.401 and 469.403 enacted in lieu of 469.400)]
0.0K chars
[Repealed or reserved.]
ORS 469.401 Energy facility site certificate; conditions; effect of issuance on state and local government agencies. (1) Upon approval, the site certificate or any amended site certificate with any conditions prescribed by the Energy Facility Siting Council shall be executed by the chairperson of the council and by the applicant. The certificate or amended certificate shall authorize the applicant to construct, operate and retire the facility subject to the conditions set forth in the site certificate or amended site certificate. The duration of the site certificate or amended site certificate shall be the life of the facility
3.4K chars
(2) The site certificate or amended site certificate shall contain conditions for the protection of the public health and safety, for the time for completion of construction, and to ensure compliance with the standards, statutes and rules described in ORS 469.501 and 469.503. The…
ORS 469.402 Delegation of review of future action required by site certificate. If the Energy Facility Siting Council elects to impose conditions on a site certificate or an amended site certificate, that require subsequent review and approval of a future action, the council may delegate the future review and approval to the State Department of Energy if, in the council’s discretion, the delegation is warranted under the circumstances of the case. [1995 c.505 §27; 1999 c.385 §3]
0.2K chars
Note: 469.402 was added to and made a part of 469.300 to 469.563 by legislative action but was not added to any smaller series therein. See Preface to Oregon Revised Statutes for further explanation.
ORS 469.403 Final order approving or rejecting application for site certificate or amendment; rehearing; appeal; judicial review vested in Supreme Court; stay of order. (1) The Energy Facility Siting Council shall include in all of the council’s final orders approving or rejecting an application for a site certificate or amended site certificate any decisions related to or arising from a contested case on the application. Any party or limited party to a contested case proceeding may apply for rehearing within 30 days from the date the approval or rejection is served. The date of service shall be the date on which the council delivered or mailed its approval or rejection in accordance with ORS 183.470. The application for rehearing shall set forth specifically the ground upon which the application is based. No objection to the council’s approval or rejection of an application for a site certificate or a site certificate amendment shall be considered on rehearing without good cause shown unless the basis for the objection is urged with reasonable specificity before the council in the site certificate or amended site certificate process. Upon such application, the council shall have the power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the council acts upon the application for rehearing within 30 days after the application is filed, the application shall be considered denied. The filing of an application for rehearing shall not, unless specifically ordered by the council, operate as a stay of the site certificate or amended site certificate for the facility
4.7K chars
(2) Any party or limited party to a contested case proceeding on a site certificate or amended site certificate application may appeal a final order issued by the council under ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992, including the council’s approval or re…
ORS 469.405 Amendment of site certificate; judicial review vested in Supreme Court; exemption; rules. (1) A site certificate may be amended with the approval of the Energy Facility Siting Council. The council may establish by rule the type of amendment that may be considered in a contested case proceeding. Notwithstanding ORS 183.482 and 183.484, judicial review of the council’s approval or rejection of a request for an amendment to a site certificate or decision related to or arising from a contested case on an amendment, regardless of whether a contested case was held prior to the council’s decision, is conferred solely on the Supreme Court. If a contested case is not held, only the certificate holder or persons who submitted comments on the request for an amendment in compliance with council rules may seek judicial review. A certificate holder or person who seeks judicial review is limited to the issues the certificate holder or the person raised in their comments
2.6K chars
(2) Notwithstanding ORS 34.020 or 197.825, or any other provision of law, the land use approval by an affected local government of a proposed amendment to a facility and the recommendation of the special advisory group of applicable substantive criteria shall be subject to judici…
ORS 469.407 Amendment of application to increase capacity of facility. (1) A recipient may by amendment of its application for a site certificate or by amendment of its site certificate increase the capacity of the facility if the Energy Facility Siting Council finds that
1.3K chars
(a) The facility will satisfy the conditions of the 500-megawatt exemption, unless modified by the council; (b) The enlarged facility does not exceed 500 megawatts and meets the applicable carbon dioxide standard provided for in ORS 469.503 (2) for any increase in capacity beyond…
ORS 469.409 Amendment of site certificate to demonstrate compliance with carbon dioxide emissions standard; binding arbitration to resolve disputes. Any site certificate holder that is required by its site certificate or by law to demonstrate need for the facility shall instead demonstrate compliance with the carbon dioxide emissions standard applicable to the type of facility subject to the site certificate before beginning construction. Such a demonstration shall be made as an amendment to the site certificate. Notwithstanding ORS 469.405 or any council rule, if the site certificate holder proceeds pursuant to ORS 469.503 (2)(d)(A) or (C), or both, the Energy Facility Siting Council shall not conduct a contested case hearing on such amendment and the council’s order shall not be subject to judicial review. Any dispute about the site certificate holder’s demonstration of compliance with the applicable carbon dioxide emissions standard shall be settled through binding arbitration. [1997 c.428 §7; 2024 c.25 §7]
0.0K chars
Note: See note under 469.407.
ORS 469.410 Energy facility site certificate applications filed or under construction prior to July 2, 1975; conditions of site certificate; monitoring programs. (1) Any applicant for a site certificate for an energy facility shall be deemed to have met all the requirements of ORS 176.820, 192.338, 192.345, 192.355, 192.690, 469.010 to 469.155, 469.300 to 469.563, 469.990, 757.710 and 757.720 relating to eligibility for a site certificate and a site certificate shall be issued by the Energy Facility Siting Council for
2.2K chars
(a) Any transmission lines for which application has been filed with the federal government and the Public Utility Commission of Oregon prior to July 2, 1975; and (b) Any energy facility under construction on July 2, 1975. (2) Each applicant for a site certificate under this sect…
ORS 469.413 Power generation from fossil fuels; requirements for new and amended site certificates. Notwithstanding ORS 469.320 and 469.405, the Energy Facility Siting Council may not
0.9K chars
(1) Issue a site certificate for a new generating facility that produces electric power from fossil fuels, including natural gas, petroleum, coal or any form of solid, liquid or gaseous fuel derived from such material, unless the council determines that a new generating facility …
ORS 469.420 [Formerly 453.405; 1977 c.813 §1; 1979 c.234 §1; 1981 c.792 §3; repealed by 1981 c.792 §4 (469.421 enacted in lieu of 469.420)]
0.0K chars
[Repealed or reserved.]
ORS 469.421 Fees; exemptions; assessment of certain utilities and suppliers; penalty. (1) Subject to the provisions of ORS 469.441, any person submitting a notice of intent, a request for exemption under ORS 469.320, a request for an expedited review under ORS 469.370, a request for an expedited review under ORS 469.373, a request for the State Department of Energy to approve a pipeline under ORS 469.405 (3), an application for a site certificate or a request to amend a site certificate shall pay all expenses incurred by the Energy Facility Siting Council and the department related to the review and decision of the council. Expenses under this subsection may include
15.6K chars
(a) Legal expenses; (b) Expenses incurred in processing and evaluating the application; (c) Expenses incurred in issuing a final order or site certificate; (d) Expenses incurred in commissioning an independent study under ORS 469.360; (e) Compensation paid to a state agency, a tr…
ORS 469.424 Energy resource suppliers; notice regarding comments in proceedings; rules. (1) As used in this section, “energy resource supplier” has the meaning given that term in ORS 469.421
3.1K chars
(2)(a) If the State Department of Energy submits comments or written or oral testimony in a rulemaking, contested case, ratemaking or other proceeding conducted by another agency, as defined in ORS 183.310, and if the comment or testimony is about a substantive matter at issue in…
ORS 469.426 Advisory group; energy resource suppliers. (1) The Director of the State Department of Energy shall convene an advisory work group composed of stakeholders representing energy resource suppliers, the customers who ultimately pay for the energy supplier assessment imposed under ORS 469.421 (8) through their energy bills and other groups that have an interest in the provision and regulation of energy in this state
0.6K chars
(2) The advisory work group shall review and make recommendations on the State Department of Energy’s proposals related to: (a) Planning, policy and technical analysis; (b) Legislative concepts; and (c) The department’s requested budget. (3) The work group shall meet at least two…
ORS 469.430 Site inspections; compliance reviews. (1) The Energy Facility Siting Council has continuing authority over the site for which the site certificate is issued, including but not limited to the authority to
1.3K chars
(a) Inspect, or direct the State Department of Energy to inspect, or request another state agency or local government to inspect, the site at any time in order to ensure that the facility is being operated consistently with the terms and conditions of the site certificate or any …
ORS 469.440 Grounds for revocation or suspension of certificates. Pursuant to the procedures for contested cases in ORS chapter 183, a site certificate or an amended site certificate may be revoked or suspended
0.6K chars
(1) For failure to comply with the terms or conditions of the site certificate or amended site certificate; (2) For violation of the provisions of ORS 469.525 to 469.563, 469.590 to 469.619, 469.930 and 469.992 or rules adopted pursuant to ORS 469.525 to 469.563, 469.590 to 469.6…
ORS 469.441 Justification of fees charged; judicial review. (1) All expenses incurred by the Energy Facility Siting Council and the State Department of Energy under ORS 469.360 and 469.421 that are charged to or allocated to the fee paid by an applicant or the holder of a site certificate shall be necessary, just and reasonable. Upon request, the department or the council shall provide a detailed justification for all charges to the applicant or site certificate holder. Not later than January 1 of each odd-numbered year, the council by order shall establish a schedule of fees which those persons submitting a notice of intent, a request for an exemption, a request for a pipeline described in ORS 469.405 (3) or a request for an expedited review must submit under ORS 469.421 prior to submitting the notice of intent, request for exemption, request for pipeline or request for expedited review. The fee schedule shall be designed to recover the council’s actual costs of evaluating the notice of intent, request for exemption, request for pipeline or request for expedited review subject to any applicable expenditure limitation in the council’s budget. Fees shall be based upon actual, historical costs incurred by the council and department to the extent historical costs are available. The fees established by the schedule shall reflect the size and complexity of the project for which a notice of intent, request for exemption, request for pipeline or request for expedited review is submitted, whether the notice of intent, request for exemption, request for pipeline or request for expedited review is for a new or existing facility and other appropriate variables having an effect on the expense of evaluation
0.8K chars
(2) If a dispute arises regarding the necessity or reasonableness of expenses charged to or allocated to the fee paid by an applicant or site certificate holder, the applicant or holder may seek judicial review for the amount of expenses charged or allocated in circuit court as p…
ORS 469.442 Procedure prior to construction of transmission line in excess of 230,000 volts; review committee. (1) Any person who proposes to construct a transmission line in excess of 230,000 volts capacity that is not otherwise under the jurisdiction of the Energy Facility Siting Council shall
1.8K chars
(a) Give public notice of the proposed action at least six months before beginning any process to obtain local permits required for the proposed transmission line. Notification shall be given: (A) By publication once a week for four consecutive weeks in a newspaper of general cir…
ORS 469.445 [1987 c.200 §3; repealed by 1993 c.569 §31]
0.0K chars
(Administration)
ORS 469.450 Energy Facility Siting Council; appointment; confirmation; term; restrictions. (1) There is established in the State Department of Energy an Energy Facility Siting Council, consisting of seven public members, who shall be appointed by the Governor, subject to confirmation by the Senate in the manner prescribed in ORS 171.562 and 171.565
1.7K chars
(2) The term of office of each member is four years, but a member serves at the pleasure of the Governor. Before the expiration of the term of a member, the Governor shall appoint a successor whose term begins on July 1 next following. A member is eligible for reappointment, but …
ORS 469.460 Officers; meetings; compensation and expenses. (1) The Energy Facility Siting Council shall annually elect from among its members a chairperson and vice chairperson with such powers and duties as the council imposes in accordance with ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992. The council may meet as often as it requires at a time and place determined by the council. A majority of the members of the council constitutes a quorum. The Governor or the chairperson of the council may call a special meeting, to be held at any place in this state designated by the person calling the meeting, upon 24 hours’ notice to each member and to the public
0.1K chars
(2) Council members shall be entitled to compensation and expenses as provided in ORS 292.495. [Formerly 453.445; 2021 c.110 §1]
ORS 469.470 Powers and duties; rules. The Energy Facility Siting Council shall
1.6K chars
(1) Conduct and prepare, independently or in cooperation with others, studies, investigations, research and programs relating to all aspects of site selection. (2) In accordance with the applicable provisions of ORS chapter 183, and subject to the provisions of ORS 469.501 (3), a…
ORS 469.480 Local government advisory group; special advisory groups; compensation and expenses; Electric and Magnetic Field Committee; rules. (1) The Energy Facility Siting Council shall designate as a special advisory group the governing body of any local government within whose jurisdiction the facility is proposed to be located
1.3K chars
(2) In addition to advisory groups required by subsection (1) of this section the council may establish such special advisory groups as are considered necessary. Such advisory groups shall include membership as determined by the council to represent interests and disciplines as n…
ORS 469.490 Adoption of rules; determination of validity. All rules adopted by the Energy Facility Siting Council pursuant to ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992 shall be adopted in the manner required by ORS chapter 183. The validity of any rule adopted by the council may be determined only upon a petition by any person to the Supreme Court. The petition must be filed within 60 days after the date the rule becomes effective under ORS 183.355. The review by the Supreme Court of the validity of any rule adopted by the council shall otherwise be according to ORS 183.400. The Supreme Court shall give priority on its docket to such a petition for review. [Formerly 453.495; 1995 c.505 §19]
0.0K chars
[Repealed or reserved.]
ORS 469.500 [Formerly 453.505; repealed by 1993 c.569 §21 (469.501, 469.503, 469.505 and 469.507 enacted in lieu of 469.500 and 469.510)]
0.0K chars
[Repealed or reserved.]
ORS 469.501 Energy facility siting, construction, operation and retirement standards; exemptions; rules. (1) The Energy Facility Siting Council shall adopt standards for the siting, construction, operation and retirement of facilities. The standards may address but need not be limited to the following subjects
3.6K chars
(a) The organizational, managerial and technical expertise of the applicant to construct and operate the proposed facility. (b) Seismic hazards. (c) Areas designated for protection by the state or federal government, including but not limited to monuments, wilderness areas, wildl…
ORS 469.503 Requirements for approval of energy facility site certificate; carbon dioxide emissions standard; offset funds; use of offset funds by qualifying organization; rules. In order to issue a site certificate, the Energy Facility Siting Council shall determine that the preponderance of the evidence on the record supports the following conclusions
21.2K chars
(1) The facility complies with the applicable standards adopted by the council pursuant to ORS 469.501 or the overall public benefits of the facility outweigh any adverse effects on a resource or interest protected by the applicable standards the facility does not meet. (2)(a) If…
ORS 469.504 Facility compliance with statewide planning goals; exception; amendment of local plan and land use regulations; conflicts; technical assistance; rules. (1) A proposed facility shall be found in compliance with the statewide planning goals under ORS 469.503 (4) if
7.3K chars
(a) The facility has received local land use approval under the acknowledged comprehensive plan and land use regulations of the affected local government; or (b) The Energy Facility Siting Council determines that: (A) The facility complies with applicable substantive criteria fro…