229 sections in this chapter.
ORS 537.252 (1) When issuing a water right certificate under ORS 537.250 to a district, or to a government agency for a district, the Water Resources Department may issue the water right certificate for land not described in the permit if
2.4K chars
(a) Water furnished by the district under the permit has been applied beneficially to the land; (b) The land not described in the permit that is proposed to be included in the certificate is included within the legally established boundaries of the district and is subject to the …
ORS 537.260 Cancellation of permit for failure of proof of completion of appropriation; issuance of limited certificate; contest of issuance of certificate; exception for municipalities. (1) Except as provided under subsection (4) of this section for a permit issued to a municipality, whenever the time within which any appropriation under a permit should have been perfected has expired and the owner of the permit fails or refuses within three months thereafter to submit to the Water Resources Department proof of completion of the appropriation as required by ORS 537.230 and 537.250, the department may, after 60 days’ notice by registered mail or by certified mail with return receipt, order the cancellation of the permit. The cancellation shall have the same force and effect as cancellation of a permit in the proceedings provided for in ORS 537.410 to 537.450
2.4K chars
(2) The department may determine the extent to which an appropriation has been perfected under any permit at the time of submission of final proof provided for in ORS 537.250, and shall limit the certificate provided for in that section to a description of such appropriation as h…
ORS 537.270 Conclusiveness of certificate. A water right certificate issued in accordance with the provisions of ORS 537.250 which, after the expiration of three months from the date it is issued, has not been contested and canceled in the manner provided in ORS 537.260, and a water right certificate, when issued under ORS 539.140, shall be conclusive evidence of the priority and extent of the appropriation therein described in any proceeding in any court or tribunal of the state, except in those cases where the rights of appropriation thereby described have been abandoned subsequent to issuance of the certificate
0.0K chars
[Repealed or reserved.]
ORS 537.280 [Renumbered 537.335]
0.0K chars
[Repealed or reserved.]
ORS 537.282 Definition of “municipal applicant.” As used in ORS 537.282 to 537.299, “municipal applicant” means any municipal corporation or district as defined in ORS 543.655 that has applied for a permit to appropriate water for the purpose of generating hydroelectric power under the provisions of this chapter, or that has been accorded any right or preference under ORS 543.260, 543.270 or 543.610. [1985 c.392 §2]
0.0K chars
[Repealed or reserved.]
ORS 537.283 Procedure for applications to appropriate water for hydroelectric power; rules. (1) Notwithstanding any other provision of ORS 537.140 to 537.350, in accordance with the applicable provisions of ORS chapter 183, the Water Resources Commission shall by rule establish a procedure for processing applications to appropriate water for hydroelectric power under ORS 537.140 to 537.320
1.0K chars
(2) Rules adopted under subsection (1) of this section: (a) To the extent possible, shall be consistent with the process established for other applications to appropriate water for other beneficial uses under ORS 537.140 to 537.252. (b) Shall not supersede any provision pertainin…
ORS 537.285 Municipal applicant may develop hydroelectric project jointly with private person; restrictions. A municipal applicant may contract with a private person for the purpose of generating hydroelectric power. The municipal applicant shall retain sufficient benefit and interest in, and control of a joint project as necessary for the project to be considered a municipal project. A municipal applicant and a private person developing a joint project under this chapter must comply with the rules adopted by the Water Resources Commission under ORS 537.287. [1985 c.392 §3]
0.0K chars
[Repealed or reserved.]
ORS 537.287 Rules for joint project of municipal applicant and private person. The Water Resources Commission shall establish rules necessary to carry out the provisions of ORS 537.285. The rules shall include the amount of control over and interest in a joint project a municipal applicant must retain in order to receive the benefit of the municipal preference and proceed under the municipal application process set forth in this chapter. [1985 c.392 §4]
0.0K chars
[Repealed or reserved.]
ORS 537.289 Conditions to be imposed on permit of municipal corporation or district. (1) Whenever the Water Resources Department issues a permit under ORS 537.211 allowing a municipal corporation or district, as defined in ORS 543.655, to appropriate water for the purpose of generating hydroelectric power, the department shall impose the following conditions on the permit, in addition to any other term, limitation or condition imposed under ORS 537.211
1.0K chars
(a) That the permit may not be assigned to any nonmunicipal entity so as to result in a loss of ownership of the permit by a municipal corporation or district. (b) That the holder of the permit must remain qualified as a municipal applicant under ORS 537.285 and 537.287. If the m…
ORS 537.290 [Renumbered 537.340]
0.0K chars
[Repealed or reserved.]
ORS 537.292 Conditions to be imposed on certificate of municipal corporation or district. (1) Whenever the Water Resources Commission issues a certificate under ORS 537.250 granting a municipal corporation or district as defined in ORS 543.655 the right to appropriate water for the purpose of generating hydroelectric power, the commission shall impose the following conditions on the certificate, in addition to any other term, limitation or condition imposed under ORS 537.250
1.1K chars
(a) That the water right may not be assigned to any nonmunicipal entity so as to result in a loss of ownership of the certificate by the municipal corporation or district. (b) That the holder of the water right certificate must remain qualified as a municipal applicant under ORS …
ORS 537.295 Cancellation of permit when holder fails to continue to qualify as municipal applicant. (1) If the holder of a permit to appropriate water for hydroelectric purposes under this chapter fails, after receiving notice under ORS 537.289 (2), to amend the joint agreement so the holder continues to qualify as a municipal applicant, or if the holder of the permit has assigned ownership of the permit to an entity other than a municipal corporation or district, the Water Resources Commission shall initiate proceedings to cancel the permit
0.2K chars
(2) The provisions of ORS 536.076 and 536.077, and rules adopted thereunder, apply to a contested case proceeding on a proposed final order issued under this section. [1985 c.392 §7; 1985 c.673 §188; 2025 c.575 §10]
ORS 537.297 Cancellation of water right certificate when holder fails to continue to qualify as municipal applicant. (1) If the owner of a certificate to appropriate water for hydroelectric purposes under this chapter fails, after receiving notice under ORS 537.289 (2), to amend the joint agreement so the owner continues to qualify as a municipal applicant, or if the holder of the certificate has assigned ownership of the certificate to an entity other than a municipal corporation or district, the Water Resources Commission shall initiate proceedings to cancel the certificate
0.2K chars
(2) The provisions of ORS 536.076 and 536.077, and rules adopted thereunder, apply to a contested case proceeding on a proposed final order issued under this section. [1985 c.392 §8; 1985 c.673 §189; 2025 c.575 §11]
ORS 537.299 Consequences of cancellation of permit or certificate if holder no longer municipal applicant; conditions to protect public health and welfare. (1) If the Water Resources Commission cancels a permit or certificate under ORS 537.295 or 537.297, the municipal applicant may apply for a permit to appropriate water for hydroelectric purposes under this chapter, or the private developer may apply for a hydroelectric license under ORS chapter 543. However, the parties may not jointly apply for a permit to appropriate water for hydroelectric purposes pursuant to ORS 537.285
0.6K chars
(2) When a permit or certificate is canceled under ORS 537.295 or 537.297, the cancellation order may include such conditions and requirements as the commission deems necessary for the public safety and welfare, including but not limited to: (a) Delay of the effective date of can…
ORS 537.300 [Subsection (2) enacted as 1961 c.187 §2; 1985 c.673 §39; renumbered 537.345 and then 537.400 in 1987]
0.0K chars
[Repealed or reserved.]
ORS 537.310 Acquisition of water rights for railway purposes; certificates. (1) Any corporation organized for the construction, maintenance or operation of any railway may acquire, hold and appropriate to its use for railway purposes any waters within the state. The appropriation may be accomplished by the procedure provided by ORS 537.130 and 537.140 to 537.252. A railway corporation may acquire by purchase, gift or devise, or by condemnation as provided in subsection (2) of this section, any water rights owned by any person and the rights of other persons affected by change of place or character of use of the water rights. Upon acquisition of the water rights by the corporation the right shall be severed from the land of the grantor and simultaneously transferred and become appurtenant to the operating property of the railway corporation, without losing the priority of the water right as originally established
1.1K chars
(2) Any such corporation may condemn and appropriate for railway operating purposes the rights of any private appropriator of waters within the state. The right of condemnation shall be exercised in the same manner as other property is condemned and appropriated for railway purpo…
ORS 537.320 Entry on land for survey purposes, preliminary to appropriation and diversion of waters. Any person may enter upon any land for the purpose of locating a point of diversion of the water intended to be appropriated, and upon any land lying between such point and the lower terminus of the proposed ditch, canal or flume of the person, for the purpose of examining the same and of locating and surveying the line of such ditch, canal or flume, together with the lines of necessary distributing ditches and feeders, and to locate and determine the site for reservoirs for storing water
0.0K chars
[Repealed or reserved.]
ORS 537.330 Disclosure required in real estate transaction involving water right; exception; delivery of available permit, order or certificate; effect of failure to comply. (1) In any transaction for the conveyance of real estate that includes a water right, the seller of the real estate shall, upon accepting an offer to purchase that real estate, also inform the purchaser in writing whether any permit, transfer approval order or certificate evidencing the water right is available and that the seller will deliver any permit, transfer approval order or certificate to the purchaser at closing, if the permit, transfer approval order or certificate is available
1.2K chars
(2) Upon closing and delivery of the instrument of conveyance in a real estate transaction involving the transfer of a water right, the seller shall also deliver to the purchaser evidence of any permit, transfer approval order or certificate of water rights if the permit, transfe…
ORS 537.332 Definitions for ORS 537.332 to 537.360. As used in ORS 537.332 to 537.360
1.0K chars
(1) “In-stream” means within the natural stream channel or lake bed or place where water naturally flows or occurs. (2) “In-stream flow” means the minimum quantity of water necessary to support the public use requested by an agency. (3) “In-stream water right” means a water right…
ORS 537.334 Findings. The people of the State of Oregon find and declare that
0.6K chars
(1) Public uses are beneficial uses. (2) The recognition of an in-stream water right under ORS 537.336 to 537.348 shall not diminish the public’s rights in the ownership and control of the waters of this state or the public trust therein. The establishment of an in-stream water r…
ORS 537.335 [Formerly 537.280; renumbered 537.390 in 1987]
0.0K chars
[Repealed or reserved.]
ORS 537.336 State agencies authorized to request in-stream water rights; agreement required when supply is stored water. (1) The State Department of Fish and Wildlife may request the Water Resources Commission to issue water right certificates for in-stream water rights on the waters of this state in which there are public uses relating to the conservation, maintenance and enhancement of aquatic and fish life, wildlife and fish and wildlife habitat. The request shall be for the quantity of water necessary to support those public uses as recommended by the State Department of Fish and Wildlife
1.2K chars
(2) The Department of Environmental Quality may request the Water Resources Commission to issue water right certificates for in-stream water rights on the waters of this state to protect and maintain water quality standards established by the Environmental Quality Commission unde…
ORS 537.338 Rules for state agency request for in-stream water right. The Water Resources Commission by rule shall establish standards, criteria and procedures by which a state agency included under ORS 537.336 may request an in-stream water right to be issued under ORS 537.336. [1987 c.859 §5]
0.0K chars
[Repealed or reserved.]
ORS 537.340 [Formerly 537.290; renumbered 537.395 in 1987]
0.0K chars
[Repealed or reserved.]
ORS 537.341 Certificate for in-stream water right. Subject to the provisions of ORS 537.343, the Water Resources Commission shall issue a certificate for an in-stream water right. The in-stream water right shall date from the filing of the application with the commission. The certificate shall be in the name of the Water Resources Department as trustee for the people of the State of Oregon and shall be issued by the commission according to the procedures established under ORS 537.338. The commission shall forward a copy of each certificate issued under this section to the state agency requesting the in-stream water right. A certificate for an in-stream water right supplied by stored water shall refer to the reservoir described in the request filed under ORS 537.336. [1987 c.859 §6; 1995 c.673 §2]
0.0K chars
[Repealed or reserved.]
ORS 537.343 Proposed final order; conditions. (1) A proposed final order issued under ORS 537.170 (3) or (5) for an in-stream water right certificate may include any condition the Water Resources Director considers necessary, but which is consistent with the intent of ORS 537.332 to 537.360. The proposed final order may
0.8K chars
(a) Approve the in-stream water right for the quantity of water requested; (b) Approve the requested in-stream water right for a lesser quantity of water; or (c) Reject the requested in-stream water right. (2) If the director reduces or rejects the in-stream water right as reques…
ORS 537.345 [Formerly 537.300; renumbered 537.400 in 1987]
0.0K chars
[Repealed or reserved.]
ORS 537.346 Conversion of minimum perennial streamflows to in-stream water rights; special provisions for Willamette Basin. (1) All minimum perennial streamflows established on any waters of this state before June 25, 1988, shall be converted to in-stream water rights after the Water Resources Commission reviews the streamflows and the Water Resources Department issues a certificate for an in-stream water right in accordance with ORS 537.343 with the same priority date as the minimum perennial streamflow
2.0K chars
(2) The priority date for that portion of an in-stream water right that uses the stored water component of a minimum perennial streamflow in the Willamette Basin shall be the date the commission or its predecessor adopted the minimum perennial streamflow containing the stored wat…
ORS 537.348 (1) Any person may purchase or lease all or a portion of an existing water right or accept a gift of all or a portion of an existing water right for conversion to an in-stream water right. Any water right converted to an in-stream water right under this section shall retain the priority date of the water right purchased, leased or received as a gift. At the request of the person the Water Resources Commission shall issue a new certificate for the in-stream water right showing the original priority date of the purchased, gifted or leased water right. Except as provided in subsections (2) to (6) of this section, a person who transfers a water right by purchase, lease or gift under this subsection shall comply with the requirements for the transfer of a water right under ORS 540.505 to 540.586
6.0K chars
(2) Subject to subsections (3) to (6) of this section, any person who has an existing water right may lease all or a portion of the existing water right for use as an in-stream water right for a specified period without the loss of the original priority date. During the term of t…
ORS 537.349 Processing request for in-stream water right. Except as provided in ORS 537.343, the Water Resources Department shall process a request received under ORS 537.336 for a certificate for an in-stream water right in accordance with the provisions for obtaining a permit to appropriate water under ORS 537.140 to 537.252. [1995 c.416 §19]
0.0K chars
[Repealed or reserved.]
ORS 537.350 Legal status of in-stream water right. (1) After the Water Resources Commission issues a certificate for an in-stream water right under ORS 537.341 to 537.348, the in-stream water right shall have the same legal status as any other water right for which a certificate has been issued
0.2K chars
(2) An in-stream water right is not subject to cancellation under ORS 537.260 or 537.410 to 537.450 but an in-stream water right may be canceled under ORS 540.610 to 540.650. [1987 c.859 §10]
ORS 537.352 Precedence of uses. Notwithstanding any provision of ORS 537.332 to 537.343 and 537.350, the right to the use of the waters of this state for a project for multipurpose storage or municipal uses or by a municipal applicant, as defined in ORS 537.282, for a hydroelectric project, shall take precedence over an in-stream water right when the Water Resources Department conducts a review of the proposed project in accordance with ORS 537.170. The precedence given under this section shall not apply if the in-stream water right was established pursuant to ORS 537.346 or 537.348. [1987 c.859 §11; 1995 c.416 §42]
0.0K chars
[Repealed or reserved.]
ORS 537.354 In-stream water right subject to emergency water shortage provisions. An in-stream water right established under the provisions of ORS 537.332 to 537.360 shall be subject to the provisions of ORS 536.700 to 536.780. [1987 c.859 §12]
0.0K chars
[Repealed or reserved.]
ORS 537.356 Request for reservation of unappropriated water for future economic development; priority date of reservation. (1) Any local government, local watershed council or state agency or any other individual cooperating jointly with a local government, local watershed council or state agency may request the Water Resources Commission to reserve unappropriated water for multipurpose storage for future economic development
0.6K chars
(2) A request under subsection (1) of this section shall be in writing on a form provided by the Water Resources Department. Before deciding whether to approve the request and initiate a rulemaking process, the commission shall request comments from any local government or waters…
ORS 537.358 Rules for reservation for future economic development; application for use of reserved water. (1) In adopting a rule under ORS 537.356 to reserve unappropriated water for multipurpose storage for future economic development, the Water Resources Commission shall include a public interest review that takes into consideration the factors described under ORS 537.170
0.5K chars
(2) A person requesting use of the reserved water for new storage shall submit a water right application and comply with the procedure set forth in ORS 537.140 to 537.252, except that the priority date for a storage right approved for use of reserved water shall be the date of th…
ORS 537.360 Relationship between application for in-stream water right and application for certain hydroelectric permits. If an application is pending under this chapter for a water right permit to use water for hydroelectric purposes or under ORS 543.010 to 543.610 for a hydroelectric permit or license at the time the Water Resources Commission receives an application for an in-stream water right under ORS 537.336 for the same stream or reach of the stream, the commission shall not take any action on the application for an in-stream water right until the commission issues a final order approving or denying the pending hydroelectric application. [1987 c.859 §15]
17.4K chars
(Deschutes River Water Bank Pilot Program) Note: Sections 1 to 7 and 9, chapter 513, Oregon Laws 2025, provide: Sec. 1. (1) The Water Resources Commission, after providing opportunity for public notice and comment, may approve a charter to establish a Deschutes River water bank p…
ORS 537.385 Extension of irrigation season; rules; limitations. (1) Notwithstanding any condition or limitation of a water right permit issued under ORS 537.211 or 537.625 or a water right certificate issued under ORS 537.250, 537.630 or 539.140, upon receipt of a request by the State Department of Agriculture, the Water Resources Commission may, by rule, extend the irrigation season of a subbasin beyond the period established by adjudication, by rule or by condition imposed on a permit or certificate, if the commission finds
1.7K chars
(a) Water is available during the period of the extended irrigation season; (b) Water use during the extended season would not impair in-stream flows that are necessary to protect aquatic resources; and (c) Water diversion and use during the period of the extended season would no…
ORS 537.387 Limitations on water use related to Cannabis plants. (1) At a location described in subsection (2) of this section, a person may not
1.2K chars
(a) Use, store or divert any waters under ORS 537.130; (b) Use or attempt to use any ground water under ORS 537.535; (c) Construct or attempt to construct any well or other means of developing and securing ground water under ORS 537.535; (d) Collect or use precipitation water fro…
ORS 537.390 Valuation of water rights. In any valuation for rate-making purposes, or in any proceeding for the acquisition of rights to the use of water and the property used in connection therewith, under any license or statute of the United States or under the laws of Oregon, no value shall be recognized or allowed for such rights in excess of the actual cost to the owner of perfecting them in accordance with the provisions of the Water Rights Act. [Formerly 537.280; and then 537.335]
0.0K chars
[Repealed or reserved.]
ORS 537.395 Public recapture of water power rights and properties; no recapture of other rights. (1) Any certificate issued for power purposes to a person other than the United States, or the State of Oregon or any municipality thereof, shall provide that after the expiration of 50 years from the granting of the certificate or at the expiration of any federal power license, and after not less than two years’ notice in writing to the holder of the certificate, the State of Oregon, or any municipality thereof, may take over the dams, plants and other structures, and all appurtenances thereto, which have been constructed for the purpose of devoting to beneficial use the water rights specified in the certificate. The taking over shall be upon condition that before taking possession the state or municipality shall pay not to exceed the fair value of the property taken, plus such reasonable damages, if any, to valuable, serviceable and dependent property of the holder of the certificate, not taken over, as may be caused by the severance therefrom of the property taken
1.2K chars
(2) The fair value of the property taken and the severance damages, if any, shall be determined by agreement between the holder of the certificate and the state or municipality, or, in case they cannot agree, by proceedings in equity instituted by the state or municipality in the…
ORS 537.400 Reservoir permits. (1) All applications for reservoir permits shall be subject to the provisions of ORS 537.130, 537.140, 537.142 and 537.145 to 537.240, except that an enumeration of any lands proposed to be irrigated under the Water Rights Act shall not be required in the primary permit. But the party proposing to apply to a beneficial use the water stored in any such reservoir shall file an application for permit, to be known as the secondary permit, in compliance with the provisions of ORS 537.130, 537.140, 537.142 and 537.145 to 537.240. The application shall refer to the reservoir for a supply of water and shall show by documentary evidence that an agreement has been entered into with the owners of the reservoir for a sufficient interest in the reservoir to impound enough water for the purposes set forth in the application, that the applicant has provided notice of the application to the operator of the reservoir and, if applicable, that an agreement has been entered into with the entity delivering the stored water. When beneficial use has been completed and perfected under the secondary permit, the Water Resources Department shall take the proof of the water user under the permit. The final certificate of appropriation shall refer to both the ditch described in the secondary permit and the reservoir described in the primary permit
2.4K chars
(2) Whenever application is made for permit to store water in a reservoir or pond for any beneficial use which does not contemplate future diversion of the stored water except by livestock drinking from stock water ponds, the extent of utilization thereof may be included in the r…
ORS 537.405 Exempt reservoirs; written notification to department; injury to other users. (1) Reservoirs in existence on or before January 1, 1995, that store less than 9.2 acre-feet of water or with a dam or impoundment structure less than 10 feet in height, are found to be a beneficial use of the water resources of this state. Except as provided in subsection (4) of this section, such reservoirs are exempt from regulation by the Water Resources Commission and the Water Resources Department and are not required to obtain a permit or certificate under ORS 537.140 to 537.252
3.0K chars
(2)(a) On or before January 31, 1997, an owner of a reservoir constructed before January 1, 1995, shall provide written notification to the department of the existence of the exempt reservoir. The written notification shall include the quantity of water stored by the reservoir, t…
ORS 537.407 Water right certificate for reservoirs existing before January 1, 1993; injury to other users; conversion of prior application to notice of exemption. (1) The Water Resources Department shall issue a water right certificate to any person who submitted an application for a reservoir under section 4, chapter 595, Oregon Laws 1993
2.8K chars
(2) Within 90 days after issuing a certificate under subsection (1) of this section, the department shall provide notice of the certificate in the manner the department determines to be the most appropriate. (3) Detailed, legally obtained information demonstrating that a specific…
ORS 537.409 Alternate permit application process for qualifying reservoirs; injury to existing users or fishery resources; public interest review; rules. (1) In lieu of the process set forth in ORS 537.140 to 537.211 for applying for a water right permit, an applicant for a reservoir permit may submit an application to the Water Resources Department to issue a water right permit under ORS 537.211 or a certificate under ORS 537.250 according to the process set forth in this section if the reservoir
4.7K chars
(a) Has a storage capacity of less than 9.2 acre-feet or a dam or impoundment structure less than 10 feet in height; (b) Does not injure any existing water right; (c) Does not pose a significant detrimental impact to existing fishery resources as determined on the basis of inform…
ORS 537.410 Failure to commence or complete work, or to properly apply water, as grounds for cancellation of permit; irrigation districts, municipalities and public utilities excepted. (1) Whenever the owner of a permit to appropriate the public waters of Oregon fails to commence actual construction work within the time required by law, or having commenced construction work as required by law, fails or neglects to prosecute the construction work with reasonable diligence, or fails to complete the construction work within the time required by law, or as fixed in the permit, or within such further time as may be allowed under ORS 537.230, or having completed construction work, fails or neglects to apply the water to beneficial use within the time fixed in the permit, the Water Resources Commission may cancel the permit on the records in the Water Resources Department as provided in ORS 537.410 to 537.450
1.0K chars
(2) However, permits issued by the commission to irrigation districts for reclamation purposes under the irrigation district laws of this state, to municipal corporations for municipal uses or purposes or to public utilities complying with subsection (3) of this section for an en…
ORS 537.420 Proposed final order canceling permit; notice. Whenever a permit holder fails to comply with the laws of the state and the requirements of the permit as to the commencement of work with due diligence, completion of the work of construction or the application of the water for a beneficial use, and the permit is subject to cancellation as provided in ORS 537.410 to 537.450, the Water Resources Commission shall issue a proposed final order canceling the permit and serve notice of the proposed final order, in accordance with ORS 183.415, on the holder of the permit that is proposed for cancellation and on each person who, according to Water Resources Department records, is the holder of a water right permit or certificate whose right may be injured by the proposed cancellation. The notice shall provide a period of 60 days from the date of the mailing of the notice within which to protest the proposed cancellation of the permit. [Amended by 1983 c.740 §212; 1985 c.673 §42; 1991 c.103 §1; 2025 c.575 §13]
0.0K chars
[Repealed or reserved.]
ORS 537.430 [Repealed by 1971 c.734 §21]
0.0K chars
[Repealed or reserved.]
ORS 537.440 Cancellation of permit; priorities of other permits. If the decision of the Water Resources Commission requires the cancellation of a permit, then the commission shall at once cancel, or have canceled, the permit. Thereafter the permit shall be of no further force or effect, and shall not be recognized or admitted as evidence of any right or interest in or to the waters covered by it in any proceeding in the courts or before other tribunals of the state. Permits having subsequent priority shall upon such cancellation have priority in the order of the filing of the applications upon which subsequent permits are based, as if the canceled permit, or the application upon which it was based, had never existed. [Amended by 1985 c.673 §43]
0.0K chars
[Repealed or reserved.]
ORS 537.445 Contested case proceeding on proposed final order to cancel permit or appropriation; cancellation suspended pending review. (1) The provisions of ORS 536.076 and 536.077, and rules adopted thereunder, apply to a contested case proceeding on a proposed final order issued under ORS 537.410 to 537.450
0.3K chars
(2) If a petition for review of an order canceling a permit or appropriation is filed under ORS 536.075, the Water Resources Commission may not cancel the permit or appropriation under ORS 537.440 until the petitioner’s right of review is exhausted and the order is finally approv…
ORS 537.450 Rules for proof as to work and use of water under permits; noncompliance as evidence in cancellation proceedings. The Water Resources Commission may by rule provide that the owners of permits shall submit or furnish proofs of commencement of work, prosecution of work with due diligence, completion of work, and of the application of water to a beneficial use under the permits. Failure to comply with the commission’s rules in respect to the proofs shall be considered prima facie evidence of failure to commence work, prosecute work with due diligence, complete work, or apply water to the beneficial use contemplated by the permit in proceedings under ORS 537.410 to 537.440 for the cancellation of permits. [Amended by 1985 c.673 §45]
0.0K chars
CONSERVATION AND USE OF CONSERVED WATER