ORS 543.010 Definitions for ORS 543.010 to 543.610
1.2K chars
As used in ORS 543.010 to 543.610: (1) “Actual original cost” includes the sum paid to the state at the time the application was made for a preliminary permit; the sum paid or secured to be paid to the state by the applicant for license at the time such application was made; such…
ORS 543.012 Applicability of chapter to reauthorization of existing hydroelectric project
0.6K chars
(1) Except for the provisions of ORS 543.300, 543.310, 543.430, 543.440, 543.610, 543.650 to 543.685, 543.710, 543.720, 543.730 and 543.990, nothing in this chapter shall apply to the reauthorization of an existing project. (2) All references in ORS 543.300, 543.310, 543.430, 543…
ORS 543.013 Applicability of chapter and ORS chapter 543A to ocean renewable energy facility
0.6K chars
The provisions of this chapter and ORS chapter 543A do not apply to an ocean renewable energy facility as defined in ORS 274.870 if: (1) The facility is located within Oregon’s territorial sea, as defined in ORS 196.405; or (2) The facility is in an estuary, unless any part of th…
ORS 543.015 Policy
0.7K chars
The Legislative Assembly declares that it is the policy of the State of Oregon: (1) To protect the natural resources of this state from possible adverse impacts caused by the use of the waters of this state for the development of hydroelectric power. (2) To permit siting of hydro…