ORS 279C.537 Condition concerning use of diesel engines in motor vehicles used in performing certain public improvement contracts; rules
2.9K chars
(1) As used in this section, diesel engine, nonroad diesel engine and motor vehicle have the meanings given those terms in ORS 468A.795. (2) Except as provided in subsection (4) of this section, a public improvement contract must require at least 80 percent of the total fle…
ORS 279C.540 Maximum hours of labor on public contracts; holidays; exceptions; liability to workers; rules
4.9K chars
(1) When labor is employed by the state or a county, school district, municipality, municipal corporation or subdivision thereof through a contractor, a person may not be required or permitted to labor more than 10 hours in any one day, or 40 hours in any one week, except in case…
ORS 279C.545 Time limitation on claim for overtime; posting of circular by contractor
0.9K chars
When labor is employed by the state or a county, school district, municipality, municipal corporation or subdivision thereof through another as a contractor, any worker employed by the contractor shall be foreclosed from the right to collect for any overtime provided in ORS 279C.…
ORS 279C.550 Retainage defined
0.2K chars
As used in ORS 279C.550 to 279C.570, retainage means the difference between the amount earned by a contractor on a public improvement contract and the amount paid on the contract by the contracting agency. [2003 c.794 §146; 2005 c.103 §32]
ORS 279C.555 Withholding of retainage
0.2K chars
The withholding of retainage by a contractor or subcontractor on public improvement contracts shall be in accordance with ORS 701.420. [2003 c.794 §147; 2013 c.410 §1]
ORS 279C.560 Form of retainage; requirements for surety bonds; conditions for rejecting bonds, securities or other instruments; allocation of costs; procedures for holding and payment; requirement for contractor to accept bonds, securities or other instruments from subcontractors
7.4K chars
(1)(a) A contractor may submit and a contracting agency shall accept from a contractor in lieu of withholding moneys for all or a portion of the retainage required under a public contract: (A) Bonds, securities or other instruments of a character described in subsection (6) of th…
ORS 279C.565 Limitation on retainage requirements
0.2K chars
Unless otherwise specifically included by statute, the provisions of ORS 279C.560 or 279C.625 apply only as between the contracting agency or public body and the party with whom it contracts. [2003 c.794 §149]
ORS 279C.570 Prompt payment policy; progress payments; retainage; interest; exception; settlement of compensation disputes
6.1K chars
(1) The policy of the State of Oregon is that all payments due on a public improvement contract and owed by a contracting agency must be paid promptly. No contracting agency is exempt from the provisions of this section. (2) Contracting agencies shall make progress payments on th…
ORS 279C.580 Contractors relations with subcontractors
10.5K chars
(1) A contractor may not request payment from the contracting agency of any amount withheld or retained in accordance with subsection (5) of this section until the contractor has determined and certified to the contracting agency that the subcontractor has determined and certifie…
ORS 279C.585 Authority to substitute undisclosed first-tier subcontractor; circumstances; rules
2.3K chars
A contractor whose bid is accepted may substitute a first-tier subcontractor that was not disclosed under ORS 279C.370 by submitting the name of the new subcontractor and the reason for the substitution in writing to the contracting agency. A contractor may substitute a first-tie…
ORS 279C.590 Complaint process for substitutions of subcontractors; civil penalties
4.6K chars
(1)(a) A subcontractor disclosed under ORS 279C.370 may file a complaint based on the subcontractor disclosure requirements under ORS 279C.370 with the Construction Contractors Board about a contractor if the contractor has substituted another subcontractor for the complaining su…
ORS 279C.600 Right of action on payment bond or public works bond of contractor or subcontractor; notice of claim
2.4K chars
(1) A person claiming to have supplied labor or materials for the performance of the work provided for in a public contract, including any person having a direct contractual relationship with the contractor furnishing the payment bond or a direct contractual relationship with any…
ORS 279C.605 Notice of claim
2.5K chars
(1) The notice of claim required by ORS 279C.600 must be sent by registered or certified mail or hand delivered no later than 180 days after the day the person last provided labor or furnished materials or 180 days after the worker listed in the notice of claim by the Commissione…
ORS 279C.610 Action on contractors public works bond or payment bond; time limitation
1.2K chars
(1) The Commissioner of the Bureau of Labor and Industries or a person who has a right of action on the public works bond or the payment bond under ORS 279C.600 and, where required, who has filed and served the notice or notices of claim, as required under ORS 279C.600 and 279C.6…
ORS 279C.615 Preference for labor and material liens
0.2K chars
All labor and material liens have preference and are superior to all other liens and claims of any kind or nature created by ORS 279C.500 to 279C.530 and 279C.600 to 279C.625. [2003 c.794 §157]
ORS 279C.620 Rights of person providing medical care to employees of contractor
0.3K chars
A person providing medical, surgical or hospital care services or other needed care and attention, incident to sickness or injury, to the employees of a contractor or subcontractor on a public contract is deemed to have performed labor on the public contract for the purposes of O…
ORS 279C.625 Joint liability when payment bond not executed
1.3K chars
If the public improvement contract is one for which a payment bond as provided for in ORS 279C.380 and 279C.400 is required and the contractor fails to pay for labor or materials or to pay claims due the Industrial Accident Fund, the Unemployment Compensation Trust Fund or the De…
ORS 279C.650 Labor dispute defined
0.1K chars
As used in ORS 279C.650 to 279C.670, labor dispute has the meaning given that term in ORS 662.010. [2003 c.794 §160]
ORS 279C.655 Extension and compensation when work suspended
0.6K chars
If a public contract is not terminated but work under the contract is suspended by an order of a contracting agency for any reason considered to be in the public interest other than a labor dispute or any third-party judicial proceeding relating to the work other than a suit or a…
ORS 279C.660 Compensation when contract terminated due to public interest
0.6K chars
When a public contract is terminated by mutual agreement, provision shall be made for the payment of compensation to the contractor. In addition to a reasonable amount of compensation for preparatory work and for all costs and expenses arising out of termination, the amount to be…
ORS 279C.665 Contractual provisions for compensation when contract terminated due to public interest
0.3K chars
A contracting agency may provide in a public improvement contract detailed provisions under which the contractor shall be entitled, as a matter of right, to compensation upon termination of the contract on account of any reason considered to be in the public interest. [2003 c.794…
ORS 279C.670 Application of ORS 279C.650 to 279C.670
0.4K chars
ORS 279C.650 to 279C.670 do not apply to suspension of the work or termination of the contract that occurs as a result of the contractors violation of federal, state or local statutes, ordinances, rules or regulations in existence at the time the contract was executed or as a re…
ORS 279C.800 Definitions for ORS 279C.800 to 279C.870
6.7K chars
As used in ORS 279C.800 to 279C.870: (1) Fringe benefits means: (a) Contributions that a contractor or subcontractor makes irrevocably to a trustee or to a third person under a plan, fund or program; and (b) Costs that a contractor or subcontractor may reasonably be anticipated…
ORS 279C.805 Policy
0.6K chars
The Legislative Assembly declares that the purposes of the prevailing rate of wage law are: (1) To ensure that contractors compete on the ability to perform work competently and efficiently while maintaining community-established compensation standards. (2) To recognize that loca…
ORS 279C.807 Workforce diversity for public works projects
1.0K chars
(1) The Bureau of Labor and Industries shall develop and adopt a plan to increase diversity statewide among workers employed on projects subject to ORS 279C.800 to 279C.870. The bureau shall develop the plan after conducting a statewide public process to solicit proposals to incr…
ORS 279C.808 Rules
0.2K chars
In accordance with applicable provisions of ORS chapter 183, the Commissioner of the Bureau of Labor and Industries shall adopt rules necessary to administer ORS 279C.800 to 279C.870. [2007 c.764 §45]
ORS 279C.810 Exemptions; rules
5.2K chars
(1) As used in this section: (a) Funds of a public agency does not include: (A) Funds provided in the form of a government grant to a nonprofit organization, unless the government grant is issued for the purpose of construction, reconstruction, major renovation or painting; (B)…
ORS 279C.815 Determination of prevailing wage; sources of information; comparison of state and federal prevailing wage; other powers of commissioner
3.6K chars
(1) As used in this section: (a) Electrical worker means an electrician, inside wireman, cable splicer, electrical welder, electrical material handler, lighting maintenance worker or limited energy electrician. (b) Person means an employer, a labor organization or an official…
ORS 279C.817 Determination of applicability of prevailing wage rate; time limitation; hearing; rules
1.3K chars
(1) The Commissioner of the Bureau of Labor and Industries shall, upon the request of a public agency or other interested person, make a determination about whether a project or proposed project is or would be a public works on which payment of the prevailing rate of wage is or w…
ORS 279C.820 Advisory committee to assist commissioner
0.4K chars
(1) The Commissioner of the Bureau of Labor and Industries shall appoint an advisory committee to assist the commissioner in the administration of ORS 279C.800 to 279C.870. (2) The advisory committee must include equal representation of members from management and labor in the bu…
ORS 279C.825 Fees; rules
1.2K chars
(1)(a) The Commissioner of the Bureau of Labor and Industries, by order, shall establish a fee to be paid by the public agency that awards a public works contract subject to ORS 279C.800 to 279C.870. The commissioner shall use the fee to pay the costs of: (A) Surveys to determine…
ORS 279C.827 Division of public works project; applicability of prevailing wage rate to divided projects
2.7K chars
(1)(a) A person or public agency may not divide a public works project into more than one contract for the purpose of avoiding compliance with ORS 279C.800 to 279C.870. (b) If the Commissioner of the Bureau of Labor and Industries determines that a person or public agency has div…
ORS 279C.829 Agreement with other state to pay less than prevailing rate of wage
0.5K chars
Notwithstanding any other provision of law, a contracting agency may not enter into an agreement with another state or a political subdivision or agency of another state in which the contracting agency agrees that a contractor or subcontractor may pay less than the prevailing rat…
ORS 279C.830 Provisions concerning prevailing rate of wage in specifications, contracts and subcontracts; applicability of prevailing wage; bond
3.3K chars
(1)(a) Except as provided in paragraph (e) of this subsection, the specifications for every contract for public works must state the existing state prevailing rate of wage and, if applicable, the federal prevailing rate of wage required under the Davis-Bacon Act (40 U.S.C. 3141 e…
ORS 279C.835 Notifying commissioner of public works contract subject to prevailing wage; payment of fee
0.5K chars
Public agencies shall notify the Commissioner of the Bureau of Labor and Industries in writing, on a form prescribed by the commissioner, whenever a contract subject to the provisions of ORS 279C.800 to 279C.870 has been awarded. The notification shall be made within 30 days of t…
ORS 279C.836 Public works bond; rules
5.6K chars
(1) Except as provided in subsection (4), (7), (8) or (9) of this section, before starting work on a contract or subcontract for a public works project, a contractor or subcontractor shall file with the Construction Contractors Board a public works bond with a corporate surety au…
ORS 279C.838 Applicability of state and federal rates of wage; determination of site of project; determination of applicability of wage to transportation workers; waiver
1.7K chars
When a public works project is subject to the Davis-Bacon Act (40 U.S.C. 3141 et seq.): (1) If the state prevailing rate of wage is higher than the federal prevailing rate of wage, the contractor and every subcontractor on the project shall pay at least the state prevailing rate …
ORS 279C.840 Payment of prevailing rate of wage; posting of rates and fringe benefit plan provisions
4.2K chars
(1) The hourly rate of wage that a contractor or subcontractor must pay to workers upon all public works may not be less than the prevailing rate of wage for an hours work in the same trade or occupation in the locality where the labor is performed. A contractor or subcontractor…
ORS 279C.845 Certified statements regarding payment of prevailing rates of wage; retainage
3.7K chars
(1) The contractor or the contractors surety and every subcontractor or the subcontractors surety shall file certified statements with the public agency in writing, on a form prescribed by the Commissioner of the Bureau of Labor and Industries, certifying: (a) The hourly rate o…
ORS 279C.850 Inspection to determine whether prevailing rate of wage being paid; civil action for failure to pay prevailing rate of wage or overtime
1.7K chars
(1) At any reasonable time the Commissioner of the Bureau of Labor and Industries may enter the office or business establishment of any contractor or subcontractor performing public works and gather facts and information necessary to determine whether the prevailing rate of wage …
ORS 279C.855 Liability for violations
2.2K chars
(1) A contractor or subcontractor or contractors or subcontractors surety that violates the provisions of ORS 279C.840 is liable to the workers affected in the amount of the workers unpaid minimum wages, including all fringe benefits, and in an additional amount equal to the u…
ORS 279C.860 Ineligibility for public works contracts for failure to pay or post notice of prevailing rates of wage; certified payroll reports to commissioner
3.1K chars
(1) A contractor or a subcontractor or a firm, corporation, partnership, limited liability company or association in which the contractor or subcontractor has a financial interest may not receive a contract or subcontract for public works for a period of three years after the dat…
ORS 279C.865 Civil penalties
1.0K chars
(1) In addition to any other penalty provided by law, the Commissioner of the Bureau of Labor and Industries may assess a civil penalty not to exceed $5,000 for each violation of any provision of ORS 279C.800 to 279C.870 or any rule the commissioner adopted under ORS 279C.800 to …
ORS 279C.870 Civil action to enforce payment of prevailing rates of wage
2.0K chars
(1) The Commissioner of the Bureau of Labor and Industries or any other person may bring a civil action in any court of competent jurisdiction to require a public agency under a public contract with a contractor to withhold twice the wages in dispute if it is shown that the contr…
ORS 279C.875 Criminal liability for intentional failure to pay prevailing wage; rules
1.7K chars
(1) A contractor or subcontractor, or an agent of a contractor or subcontractor, may not intentionally: (a) Fail to pay an employee of the contractor or subcontractor the prevailing rate of wage as provided in ORS 279C.840; (b) Reduce the rate of wage that an employee would ordin…
ORS 280.040 Definitions for ORS 280.040 to 280.145; use of certain tax revenues
0.9K chars
(1) As used in ORS 280.040 to 280.145: (a) Local option tax means a tax described under section 11 (4) or (7)(c), Article XI of the Oregon Constitution. (b) Subdivision includes only such counties, municipal corporations, quasi-municipal corporations and civil or political co…
ORS 280.050 Providing funds for financing cost of services, projects, property and equipment
0.3K chars
Funds may be obtained as prescribed in ORS 280.040 to 280.145 for the purpose of financing the cost of any service, project, property or equipment which a subdivision has lawful power to perform, construct or acquire, and of repairs and improvements thereto and of maintenance and…
ORS 280.055 Obtaining and advancing of funds to county service districts
0.3K chars
Funds may be obtained by a county as prescribed by ORS 280.040 to 280.145 for the purpose of advancing funds to a district established under ORS 451.410 to 451.610 to finance the cost of any service facility which the district is authorized to construct, maintain and operate. [19…
ORS 280.057 Local option taxes for community colleges; maximum amount
0.4K chars
A local option tax levied by a community college district or community college service district may not exceed the amount of reduction in ad valorem property taxes caused under ORS 310.200 to 310.242. [1997 c.541 §308b] Note: 280.057 was added to and made a part of 280.040 to 280…
ORS 280.060 Levy of local option taxes outside constitutional limitation; duration of levy; approval of levy as approval of bonds
4.2K chars
(1) Upon approval of a majority of the electors of a subdivision in a manner that qualifies under section 11 (8), Article XI of the Oregon Constitution, a subdivision may levy local option taxes outside the limitation imposed by section 11 (3), Article XI, Oregon Constitution, ov…