5,315 sections across 100 South Carolina regulatory chapters.
R.71-8306.4 Repealed
0.4K chars
71-8306.4. Repealed. HISTORY: Former Regulation, titled Permit application requirements for hydrogen facilities, had the following history: Added by State Register Volume 38, Issue No. 6, Doc. No. 4445, eff June 27, 2014. Amended by State Register Volume 39, Issue No. 6, Doc. No.…
R.71-8306.5 OSFM Licensing and permitting fees. A. All fees are due at time of application for licenses, tests, or permitting
1.7K chars
71-8306.5. OSFM Licensing and permitting fees. A. All fees are due at time of application for licenses, tests, or permitting. B. Permit applications are due in the OSFM prior to construction or installation. C. Approval of plans for hydrogen facilities are to be obtained prior to…
R.71-8307.1 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8307.1 was titled Purpose and had the following history: Added by State Register Volume
1.9K chars
71-8307.1. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8307.1 was titled Purpose and had the following history: Added by State Register Volume 23, Issue No. 6, eff June 25, 1999. 71-8307.2. Repealed by State Register Volume 38…
R.71-8307.18 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8307.18 was titled Penalties and had the following history: Added by State Register Volume
0.3K chars
71-8307.18. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8307.18 was titled Penalties and had the following history: Added by State Register Volume 23, Issue No. 6, eff June 25, 1999. 71-8308. FIRE SAFETY: CONSTRUCTION AND OPER…
R.71-8307.8 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8307.8 was titled Installation and Maintenance Procedures and had the following history:
2.7K chars
71-8307.8. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8307.8 was titled Installation and Maintenance Procedures and had the following history: Added by State Register Volume 23, Issue No. 6, eff June 25, 1999. 71-8307.9. Repe…
R.71-8308.1 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8308.1 was titled Application and had the following history: Added by State Register
2.3K chars
71-8308.1. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8308.1 was titled Application and had the following history: Added by State Register Volume 23, Issue No. 6, eff June 25, 1999. 71-8308.2. Repealed by State Register Volum…
R.71-8308.10 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8308.10 was titled Minimum Requirements and had the following history: Added by State
1.3K chars
71-8308.10. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8308.10 was titled Minimum Requirements and had the following history: Added by State Register Volume 23, Issue No. 6, eff June 25, 1999. 71-8308.11. Repealed by State Re…
R.71-8309.1 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8309.1 was titled Application and had the following history: Added by State Register
1.2K chars
71-8309.1. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8309.1 was titled Application and had the following history: Added by State Register Volume 23, Issue No. 6, eff June 25, 1999. 71-8309.2. Repealed by State Register Volum…
R.71-8309.6 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8309.6 was titled Fire Detection, Control and Protection Equipment Specifications and
2.5K chars
71-8309.6. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8309.6 was titled Fire Detection, Control and Protection Equipment Specifications and Installation and had the following history: Added by State Register Volume 23, Issue …
R.71-8310 FIRE SAFETY: RENOVATION OF EXISTING LOCAL DETENTION FACILITIES. [REPEALED]
0.1K chars
71-8310. FIRE SAFETY: RENOVATION OF EXISTING LOCAL DETENTION FACILITIES. [REPEALED]
R.71-8310.1 Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8310.1 was titled Review of Plans and had the following history: Added by State Register
0.9K chars
71-8310.1. Repealed by State Register Volume 38, Issue No. 4, eff April 25, 2014. Editor’s Note Former R. 71-8310.1 was titled Review of Plans and had the following history: Added by State Register Volume 23, Issue No. 6, eff June 25, 1999. 71-8310.2. Repealed by State Register V…
R.71-901 Scope and Application. A. Except as provided in paragraphs C through F below, this regulation applies to all requests by
16.8K chars
71-901. Scope and Application. A. Except as provided in paragraphs C through F below, this regulation applies to all requests by SC/OSH personnel and by federal OSHA personnel to obtain access to records in order to examine or copy personally identifiable employee medical informa…
R.71-910 Results of an Agency Analysis Using Personally Identifiable Employee Medical
21.6K chars
71-910. Results of an Agency Analysis Using Personally Identifiable Employee Medical Information. The SC/OSH Medical Record Officer shall, as appropriate, assure that the results of an agency analysis using personally identifiable employee medical information are communicated to …
R.71-9100 Requirement of Filing Inspection Report to Claim Exemption. Boilers described in S.C. Code 41-14-60(3), (4), (5), (6), and (7) may claim exemption from these
0.7K chars
71-9100. Requirement of Filing Inspection Report to Claim Exemption. Boilers described in S.C. Code 41-14-60(3), (4), (5), (6), and (7) may claim exemption from these regulations by filing with the Department an inspection report indicating that the boiler has been inspected at t…
R.71-9101 Definitions. For the purposes of this Chapter all definitions from the Boiler Safety Act apply. In addition the
7.7K chars
71-9101. Definitions. For the purposes of this Chapter all definitions from the Boiler Safety Act apply. In addition the following definitions apply. 1. ‘Act’ means the Boiler and Pressure Vessel Safety Act, which were enacted as Title 41, Chapter 14, of the S.C. Code of Laws. 2.…
R.71-9102 Administration. A. Minimum Construction Standards for Boilers
42.1K chars
71-9102. Administration. A. Minimum Construction Standards for Boilers 1. All new boilers installed and operated in South Carolina, unless otherwise exempted, shall be designed and constructed in accordance with the ASME Code or a nationally recognized Code of Construction accept…
R.71-9103.2 Heating Boilers. A. EHB-1 Standard Boilers
18.7K chars
71-9103.2. Heating Boilers. A. EHB-1 Standard Boilers The maximum allowable working pressure of standard boilers shall in no case exceed the pressure indicated by the manufacturer’s identification stamped or cast on the boiler or on a plate secured to it. B. EHB-2 Nonstandard Riv…
R.71-9104 General Requirements. A. GR-1 Inspection of Boilers
21.2K chars
71-9104. General Requirements. A. GR-1 Inspection of Boilers All boilers not exempted by the Act or by rules and regulations promulgated under the Act and which are subject to regular inspections shall be prepared for such inspections as required in GR-2. B. GR-2 Preparation for …
R.72-102 Purpose. These regulations set forth requirements for erosion and sediment control and stormwater manage-
0.3K chars
72-102. Purpose. These regulations set forth requirements for erosion and sediment control and stormwater manage- ment measures to be used on state land to prevent damage to land, water and property from erosion, sediment and stormwater. HISTORY: Added by State Register Volume 9,…
R.72-103 Definitions. As used in these regulations:
4.1K chars
72-103. Definitions. As used in these regulations: A. ‘‘Applicant’’ means the state agency or quasi-state agency that owns, manages or controls state land that is to be disturbed, or the agent of the agency. B. ‘‘Commission’’ means the South Carolina Land Resources Conservation C…
R.72-104 Exemptions. The following are exempted from these regulations:
0.3K chars
72-104. Exemptions. The following are exempted from these regulations: A. Land owned by or under the jurisdiction of the South Carolina Department of Highways and Public Transportation. B. Forest land owned or managed by the South Carolina Forestry Commission. HISTORY: Added by S…
R.72-105 Requirement for Erosion and Sediment Control and Stormwater Management
0.9K chars
72-105. Requirement for Erosion and Sediment Control and Stormwater Management Measures to be Used and Maintained. All land disturbing activities on state land under the jurisdiction of these regulations must be performed in a manner that erosion is controlled, sediment is retain…
R.72-106 Land Disturbing Activities Under the Jurisdiction of the State Engineer. A. No state land may be disturbed for the purpose of any land disturbing activity that is under the
11.5K chars
72-106. Land Disturbing Activities Under the Jurisdiction of the State Engineer. A. No state land may be disturbed for the purpose of any land disturbing activity that is under the jurisdiction of the State Engineer pursuant to the South Carolina Consolidated Procurement Code (Ti…
R.72-107 Land Disturbing Activities Under the Jurisdiction of the Land Resources Conser-
7.1K chars
72-107. Land Disturbing Activities Under the Jurisdiction of the Land Resources Conser- vation Commission. A. For the purpose of these regulations, the Land Resources Conservation Commission shall have jurisdiction over all land disturbing activities on state land that are not un…
R.72-108 All Erosion, Sediment and Stormwater Problems not Addressed by Regulations
6.2K chars
72-108. All Erosion, Sediment and Stormwater Problems not Addressed by Regulations 72-106 and 72-107. A. All erosion, sediment and stormwater problems on state land that are not addressed by Regulations 72-106 and 72-107 must be corrected to control erosion, retain sediment on th…
R.72-2 Dam Classifications and Exemptions. A. General. All dams and reservoirs subject to this regulation shall be classified according to their
4.3K chars
72-2. Dam Classifications and Exemptions. A. General. All dams and reservoirs subject to this regulation shall be classified according to their size and hazard potential. Classifications shall be made in accordance with this section and are subject to final approval by the Depart…
R.72-3 Permitting Procedures and Requirements. A. General. Any individual who proposes to construct a new dam or repair, alter or remove an
26.8K chars
72-3. Permitting Procedures and Requirements. A. General. Any individual who proposes to construct a new dam or repair, alter or remove an existing dam shall apply for and obtain a permit from the Department for the proposed work. A separate application for construction of each n…
R.72-301 Definitions. As used in these regulations, the following terms shall have the meanings indicated below:
12.8K chars
72-301. Definitions. As used in these regulations, the following terms shall have the meanings indicated below: 1. ‘‘Adverse Impact’’ means a significant negative impact to land, water and associated resources resulting from a land disturbing activity. The negative impact include…
R.72-302 Exemptions, Waivers and Variances from Law. A. The following activities are exempt from both the sediment control and stormwater manage-
8.2K chars
72-302. Exemptions, Waivers and Variances from Law. A. The following activities are exempt from both the sediment control and stormwater manage- ment requirements established by these regulations: (1) Land disturbing activities on agricultural land for production of plants and an…
R.72-303 Commission Responsibilities. A. The Commission is responsible for the implementation and supervision of the stormwater
2.1K chars
72-303. Commission Responsibilities. A. The Commission is responsible for the implementation and supervision of the stormwater management and sediment control program which is established by Chapter 14, Title 48, S.C. Code. B. The schedule for implementing the Stormwater Manageme…
R.72-304 Criteria for Delegation/Revocation of Programs. A. The Commission may delegate the following components of stormwater management and
8.0K chars
72-304. Criteria for Delegation/Revocation of Programs. A. The Commission may delegate the following components of stormwater management and sediment control programs to local governments or conservation districts as follows: (1) Stormwater management and sediment control plan re…
R.72-305 Permit Application and Approval Process. A. After the effective date of these regulations, unless a particular activity is exempted by these
9.5K chars
72-305. Permit Application and Approval Process. A. After the effective date of these regulations, unless a particular activity is exempted by these regulations, a person may not undertake a land disturbing activity without an approved stormwater management and sediment control p…
R.72-306 Fees. A. The fees associated with the plan review and approval process inspection and enforcement shall
2.3K chars
72-306. Fees. A. The fees associated with the plan review and approval process inspection and enforcement shall be set by the implementing agency. If permit fees are established, they shall be established in accordance with the following items: (1) Delegation of program elements …
R.72-307 Specific Design Criteria, Minimum Standards and Specifications. A. General submission requirements for all projects requiring stormwater management and sedi-
25.0K chars
72-307. Specific Design Criteria, Minimum Standards and Specifications. A. General submission requirements for all projects requiring stormwater management and sedi- ment control plan approval will include the following information as applicable: (1) A standard application form, …
R.72-308 Maintenance Requirements and Off-Site Damage Correction. A. The Commission will provide technical assistance to local governments who choose to assume
2.5K chars
72-308. Maintenance Requirements and Off-Site Damage Correction. A. The Commission will provide technical assistance to local governments who choose to assume the maintenance responsibility for stormwater management structures on, at least, residential lands. B. The person respon…
R.72-309 Criteria for Designated Watersheds. The concept of designated watersheds is intended, not only to prevent existing water quantity and
7.7K chars
72-309. Criteria for Designated Watersheds. The concept of designated watersheds is intended, not only to prevent existing water quantity and water quality problems from getting worse, but also to reduce existing flooding problems and to improve existing water quality or meet Sta…
R.72-310 Criteria for Implementation of a Stormwater Utility. The implementation of a stormwater utility will necessitate the development of a local utility
4.2K chars
72-310. Criteria for Implementation of a Stormwater Utility. The implementation of a stormwater utility will necessitate the development of a local utility ordinance or special taxing assessment prior to its implementation, pursuant to Chapter 9, Title 4, 1976 Code of Laws as ame…
R.72-311 Plan Review and Inspector Certification Programs. A. The Commission shall require that local governments which request delegation of stormwater
2.5K chars
72-311. Plan Review and Inspector Certification Programs. A. The Commission shall require that local governments which request delegation of stormwater management and sediment control plan review and approval/disapproval shall have a Certified Plan Reviewer representing the imple…
R.72-312 Review and Enforcement Requirements. A. Items listed in this section are activities by the Commission in the event the Commission serves
10.5K chars
72-312. Review and Enforcement Requirements. A. Items listed in this section are activities by the Commission in the event the Commission serves as the implementing agency. When the Commission is requested to assist the implementing agency, these are suggestions the Commission ma…
R.72-313 Hearings and Hearings Procedures. A. An administrative hearing is available, following a timely request, to determine the propriety of:
1.5K chars
72-313. Hearings and Hearings Procedures. A. An administrative hearing is available, following a timely request, to determine the propriety of: (1) The denial of delegation of a program component. (2) A revocation of a delegated program component. (3) A denial or revocation of a …
R.72-314 Citizen Complaint Procedure on Delegated Program Components and Individual
1.7K chars
72-314. Citizen Complaint Procedure on Delegated Program Components and Individual Sites. A. Persons may become aggrieved by land disturbing activities and program implementation. The following describes the procedure for a person to complain concerning program operation: (1) If …
R.72-315 Penalties. A. Any person who violates any provision of this chapter or any ordinance or regulation promul-
1.7K chars
72-315. Penalties. A. Any person who violates any provision of this chapter or any ordinance or regulation promul- gated, enacted, adopted, or issued pursuant to this chapter by the Commission or other implementing agency, or who initiates or continues a land disturbing activity …
R.72-316 Severability. If any section, subsection, sentence, clause, phrase, or portion of these regulations are for any reason
1.1K chars
72-316. Severability. If any section, subsection, sentence, clause, phrase, or portion of these regulations are for any reason held invalid or unconstitutional by any court or competent jurisdiction, such provision and such holding shall not affect the validity of the remaining p…
R.72-4 Inspections. A. General. Inspection of dams and their appurtenant works is necessary to verify the safety of
4.8K chars
72-4. Inspections. A. General. Inspection of dams and their appurtenant works is necessary to verify the safety of dams and compliance with these rules and regulations and the Dams and Reservoirs Safety Act. The results of any inspection are subject to verification by the Departm…
R.72-410 Definitions. As used in these regulations, the following terms shall have the meanings as indicated below:
4.1K chars
72-410. Definitions. As used in these regulations, the following terms shall have the meanings as indicated below: 1. ‘‘Commission’’ means the South Carolina Land Resources Conservation Commission. 2. ‘‘Department’’ means the South Carolina Department of Highways and Public Trans…
R.72-415 Exemptions. A. Any highway maintenance activity which disturbs less than five acres
0.3K chars
72-415. Exemptions. A. Any highway maintenance activity which disturbs less than five acres. B. Any land disturbing activity conducted pursuant to a construction activity which disturbs less than five acres. HISTORY: Added by State Register Volume 17, Issue No. 5, Part 3, eff May…
R.72-420 Activities Requiring Site Specific Plans. A. Land disturbing activity associated with any highway construction or maintenance project not
0.4K chars
72-420. Activities Requiring Site Specific Plans. A. Land disturbing activity associated with any highway construction or maintenance project not specifically exempted in these Regulations. B. Land disturbing activity conducted for any reason under an encroachment permit, by ease…
R.72-425 Specific Design Criteria, Minimum Standards and Specifications. A. General submission requirements for all projects requiring site specific stormwater management
14.8K chars
72-425. Specific Design Criteria, Minimum Standards and Specifications. A. General submission requirements for all projects requiring site specific stormwater management and sediment control plans will include the following information as applicable: (1) A standard application fo…
R.72-430 Department Responsibilities. A. The Department shall file with the Commission, a copy of the sediment reduction and
1.6K chars
72-430. Department Responsibilities. A. The Department shall file with the Commission, a copy of the sediment reduction and stormwater management plan, in accordance with R.72-420A, for each construction and maintenance activity as required by these regulations. B. The Department…
R.72-435 Commission Responsibilities. A. The Commission shall retain the plan six months after completion of the project
0.7K chars
72-435. Commission Responsibilities. A. The Commission shall retain the plan six months after completion of the project. B. The Commission has the responsibility to investigate any complaint of violation against the Department for violating the plans submitted. C. The Commission …