43,769 sections across 2,187 Washington regulatory chapters.
R.296-07-296-07-100 Chapter to be amended when SEPA guidelines amended.
0.3K chars
When amendments are adopted to the SEPA guidelines the department shall adopt all amendments to this chapter within one hundred twenty days to bring this chapter into conformance with the SEPA guidelines as amended.[Order 76-16, § 296-07-100, filed 5/20/76.]
R.296-07-296-07-110 Consideration of economic values.
0.4K chars
In promulgating rules in compliance with the SEPA guidelines and any environmental, social, health, safety, or other standards connected therewith, the department shall, pursuant to chapter 117, Laws of 1975-'76 2nd ex. sess., give appropriate consideration to economic values alo…
R.296-104-296-104-001 Administration—To what do these rules apply?
0.5K chars
The following rules and regulations apply to all boilers and unfired pressure vessels except those exempt under RCW 70.79.080. Boilers and unfired pressure vessels listed under RCW 70.79.090 are exempt from inspection and fees, but shall comply with all rules for construction, in…
R.296-104-296-104-010 Administration—What are the definitions of terms used in this chapter?
15.9K chars
"Accident" shall mean a failure of the boiler or unfired pressure vessel resulting in personal injury or property loss or an event which renders a boiler or unfired pressure vessel unsafe to return to operation."Agriculture purposes" shall mean any act performed on a farm in prod…
R.296-104-296-104-015 Administration—When and where are the board meetings held?
1.0K chars
The board of boiler rules shall hold its regular meetings quarterly. The time, place, and date of each regular meeting shall be set by the department, approved by the board chair and published annually. Special meetings may be called by the chair.[Statutory Authority: Chapter 70.…
R.296-104-296-104-017 Administration—How are rules affected if other rules are invalidated?
0.3K chars
Should any section, subsection, sentence, clause, phrase, provision or exemption of these rules be declared unconstitutional or invalid for any reason, such invalidity shall not affect the remaining portion or provisions.[Statutory Authority: RCW 70.79.030 and 70.79.040. WSR 98-2…
R.296-104-296-104-018 Administration—Interpretation of rules—Appeal rights—Hearings.
2.9K chars
(1) Any person desiring clarification or interpretation and/or application of the rules in this chapter shall submit a request in writing to the chief inspector upon the "chief inspector clarification and interpretation request form." The chief inspector shall issue a written dec…
R.296-104-296-104-019 Administration—How are Washington state specials and extensions of inspection frequencies for boilers and pressure vessels obtained?
0.9K chars
Stakeholders may request a Washington state special or an extension of inspection frequencies for boilers and pressure vessels by submitting a written request to the board of boiler rules. The request shall be in writing upon the appropriate form furnished by the chief inspector …
R.296-104-296-104-020 Administration—What are the filing requirements for boilers and unfired pressure vessels before their installation/reinstallation?
3.0K chars
(1) "Boiler/pressure vessel, water heater installation or reinstallation permit" shall mean a permit approved by the chief inspector and submitted by the installer prior to starting installation or reinstallation of any boiler/pressure vessel or water heater within the jurisdicti…
R.296-104-296-104-021 Administration—What is the registration requirement for new standard boilers and unfired pressure vessels?
0.3K chars
Manufacturers' data report for new "standard boilers and unfired pressure vessels" shall be registered with the National Board of Boiler and Pressure Vessel Inspectors.[Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150, 70.79.290, 70.79.330, 70.79.350, and chapter 70.79 RC…
R.296-104-296-104-025 Administration—What are the notification and reporting requirements following an accident involving a boiler or pressure vessel?
1.2K chars
When an accident occurs which renders a boiler or unfired pressure vessel inoperative, the owner or user shall notify the chief inspector, and submit a detailed report of the accident. In cases of accidents, such as explosions or those resulting in personal injury, notice to the …
R.296-104-296-104-030 Administration—What is the penalty for operation of unsafe boilers or unfired pressure vessels?
0.6K chars
In the event that a boiler or unfired pressure vessel is unsafe to operate, the inspection certificate shall be suspended. Any person, firm, partnership, or corporation causing such objects to be operated under pressure without a valid certificate of inspection shall be in violat…
R.296-104-296-104-035 Administration—What are conflicts of interest for inspectors?
0.4K chars
Inspectors commissioned by the state of Washington shall not engage in the sale of any service, article, or device or promote any other activity for personal gain relating to boilers or unfired pressure vessels or their appurtenances.[Statutory Authority: RCW 70.79.030 and 70.79.…
R.296-104-296-104-040 Administration—When should inspectors submit inspection reports and on what forms?
1.2K chars
In-service reports of inspections of boilers and unfired pressure vessels shall be submitted within thirty days of inspection. Inspectors shall submit reports of inspections directly into the state's electronic inspection report system.If an authorized in-service inspection agenc…
R.296-104-296-104-045 Administration—What are the insurance companies' responsibilities?
0.8K chars
All insurance companies shall notify the chief inspector within thirty days of all boiler and/or unfired pressure vessel risks written, canceled, not renewed or suspended. Special inspectors shall perform all in-service inspections of boilers and unfired pressure vessels insured …
R.296-104-296-104-050 Administration—What are the requirements for a boiler inspector?
2.8K chars
Application for examination for a Washington state certificate of competency shall be in writing upon a form to be furnished by the chief inspector stating the school and education of the applicant, a list of employers, period of employment and position held with each employer. A…
R.296-104-296-104-060 Administration—When shall an inspectors' Washington state commission be issued, suspended, or revoked?
1.7K chars
The chief inspector shall issue a commission as a deputy or special inspector in accordance with RCW 70.79.120 and 70.79.130.The deputy inspector commission shall be held by the chief inspector. The deputy inspector commission shall be valid for one year and may be renewed annual…
R.296-104-296-104-065 Administration—How should an inspector obtain a Washington state commission?
2.4K chars
A commission as a deputy inspector of boilers and/or unfired pressure vessels may be issued by the chief inspector to an inspector complying with WAC 296-104-065 (1) or (4). Upon the request of a boiler insurance company authorized to insure and insuring against loss from explosi…
R.296-104-296-104-100 Inspection—How often must boilers and unfired pressure vessels be inspected?
4.1K chars
In accordance with RCW 70.79.080, 70.79.090, and 70.79.240 the following inspection requirements shall apply:(1) Power boilers shall be inspected:(a) Externally while under pressure - Annually.(b) Internally and externally while not under pressure - Annually, except as noted in (…
R.296-104-296-104-102 Inspection—What are the standards for in-service inspection?
3.0K chars
Where a conflict exists between the requirements of the standards listed below and this chapter, this chapter shall prevail. The duties of the in-service inspector do not include the installation's compliance with other standards and requirements (environmental, construction, ele…
R.296-104-296-104-105 Inspection—How much time is required for notification of an internal inspection?
0.6K chars
Seven days will be considered sufficient notification. The owner or user shall prepare each boiler and unfired pressure vessel for internal inspection and shall prepare for and apply a hydrostatic pressure test whenever necessary on the date specified by the inspector.[Statutory …
R.296-104-296-104-110 Inspection—What will be done when boilers or unfired pressure vessels are deemed unsafe or defective?
1.4K chars
Upon inspection of a boiler or unfired pressure vessel or appurtenances, if an inspector finds hazardous conditions such that it is unsafe to operate under pressure, remedial action shall be initiated at once. A red tag indicating "unsafe - do not use" shall be attached to the pr…
R.296-104-296-104-115 Inspection—What will be done when defective conditions are concealed by covering?
0.7K chars
If upon an external inspection there is evidence of a leak or crack, enough of the covering of the boiler or unfired pressure vessel shall be removed to satisfy the inspector in order to determine the safety of the boiler or unfired pressure vessel. If the covering cannot be remo…
R.296-104-296-104-125 Inspection—What are the requirements for obtaining a certificate of inspection?
1.0K chars
Before a certificate of inspection as defined in RCW 70.79.290 is issued, a boiler or unfired pressure vessel must be inspected by an inspector and have all necessary permits. In addition, the owner or user shall pay the fees scheduled in WAC 296-104-700 directly to the chief ins…
R.296-104-296-104-130 Inspection—When are inspection certificates valid?
0.8K chars
An inspection certificate, issued in accordance with RCW 70.79.290, shall be valid until expiration unless some defect or condition affecting the safety of the boiler or unfired pressure vessel is disclosed or the conditions of RCW 70.79.300 apply.When an agreement exists between…
R.296-104-296-104-135 Inspection—What are the requirements for restamping of boilers and unfired pressure vessels?
1.0K chars
When the stamping on a boiler or unfired pressure vessel becomes indistinct the inspector shall instruct the owner or user to have it restamped. Request for permission to restamp the boiler or unfired pressure vessel shall be made to the chief inspector and proof of the original …
R.296-104-296-104-140 Inspection—How should a state number be assigned and applied?
1.9K chars
Upon completion of the installation, all boilers and unfired pressure vessels shall be inspected by an inspector as defined in WAC 296-104-100. At the time of this inspection, each boiler or unfired pressure vessel shall be marked with a serial number of the state of Washington f…
R.296-104-296-104-145 Inspection—How are groups of vessels operating as a single unit classified?
0.9K chars
A group of unfired pressure vessels operating as a single unit such as the vessels in a refrigeration system, evaporators, ironers and paper machines shall have an individual state serial number marked on each boiler or unfired pressure vessel. The marking should be conspicuously…
R.296-104-296-104-150 Inspection—How are unfired steam boilers classified?
0.6K chars
Unfired steam boilers as defined in WAC 296-104-010 operating at pressures of 50 psi or more shall be inspected as power boilers. Unfired steam boilers operating at less than 50 psi shall be inspected as unfired pressure vessels.[Statutory Authority: RCW 70.79.030, 70.79.040, 70.…
R.296-104-296-104-151 Inspection—What are the requirements for rental boilers?
1.2K chars
Every rental boiler used in the state of Washington will have an internal inspection as defined in WAC 296-104-010 witnessed by an inspector once a year. An external inspection as defined in WAC 296-104-010 shall be witnessed by an inspector at each and every rental location befo…
R.296-104-296-104-155 Inspection—What preparations are necessary prior to internal inspections?
2.6K chars
The owner or user has the responsibility to prepare a pressure-retaining item for internal inspection. Requirements of occupational safety and health regulations (federal, state, local, or other), as well as the owner or user's own safety program and the safety program of the ins…
R.296-104-296-104-160 Inspection—What happens if a boiler or unfired pressure vessel is improperly prepared for inspection?
0.6K chars
If a boiler or unfired pressure vessel has not been properly prepared for an internal inspection, or the owner or user fails to comply with the requirements for hydrostatic test as set forth in these rules, the inspector may decline to make the inspection or test and the certific…
R.296-104-296-104-165 Inspection—When should coverings be removed for inspection?
0.7K chars
If the boiler or unfired pressure vessel is jacketed such that the longitudinal seams of shells, drums, or domes cannot be seen, or if pertinent information cannot be determined by other means, the following may be ordered by the inspector: Enough of the jacketing, setting wall, …
R.296-104-296-104-170 Inspection—When are shop inspections required?
1.6K chars
Shop inspections shall be as required in the standards of construction as adopted in WAC 296-104-200. Only inspectors and supervisors of inspectors holding a national board commission with the appropriate endorsements shall make shop inspections in this state. Upon request from a…
R.296-104-296-104-180 Inspection—How are radioactive systems inspected?
0.4K chars
An alternative means of inspection is allowed when a pressure vessel has radioactive contamination that would not allow entering for visual inspection. The inspector and owner shall work out a program of nondestructive examination that shall ascertain the condition of the vessel …
R.296-104-296-104-200 Construction—What are the standards for new construction?
3.6K chars
The standards for new construction are:(1) ASME Boiler and Pressure Vessel Code, current edition, Sections I, III, IV, VIII, Division 1, 2, 3, X, XII, XIII;(2) ASME PVHO-1 Safety Standard for Pressure Vessels for Human Occupancy, current edition; and(3) Standards of construction …
R.296-104-296-104-205 Construction—What are the requirements for nonstandard new construction?
1.0K chars
Nonstandard boilers and unfired pressure vessels that are not to be constructed to the codes adopted in WAC 296-104-200 may be treated as special designs at the discretion of the board. Nonstandard construction shall not be permitted to avoid standard construction.[Statutory Auth…
R.296-104-296-104-210 Construction—What are the requirements for construction of boilers and unfired pressure vessels of special design?
1.3K chars
Boilers and unfired pressure vessels of special design require a special certificate granted by the board of boiler rules. At a minimum the following information shall be supplied to obtain board approval for special designs: Construction drawings, design calculations, material s…
R.296-104-296-104-215 Construction—What are the requirements to use nonstandard boilers and unfired pressure vessels other than historical boilers and pressure vessels?
0.6K chars
Nonstandard boilers and unfired pressure vessels, other than historical boilers and pressure vessels may be used provided they have not been moved from their original setting since January 1, 1952.[Statutory Authority: Chapter 70.79 RCW. WSR 13-10-018, § 296-104-215, filed 4/23/1…
R.296-104-296-104-220 Construction—What are the requirements to use nonstandard second hand boilers and unfired pressure vessels, other than historical boilers and pressure vessels?
1.1K chars
Nonstandard second hand boilers and unfired pressure vessels constructed after January 1, 1952, cannot be used in this state without prior approval of the board of boiler rules. At a minimum the following information shall be supplied to obtain board approvals: Construction drawi…
R.296-104-296-104-226 Construction—What are the requirements to use historical boilers and pressure vessels?
0.8K chars
Historical boilers and pressure vessels not previously registered may be used in this state provided they meet all the requirements for historical boilers in the National Board Inspection Code and have prior approval of the board of boiler rules.Historical boilers and pressure ve…
R.296-104-296-104-245 Construction—Combustible fluid heaters.
0.4K chars
Steam or hot water combustible fluid heaters shall be so designed and constructed that in the event of failure of any part, the combustible fluid cannot enter the boiler water.[Statutory Authority: RCW 70.79.030 and 70.79.040. WSR 96-21-081, § 296-104-245, filed 10/16/96, effecti…
R.296-104-296-104-251 Installation—What are the standards for installation for nonnuclear boiler and pressure vessels?
0.8K chars
Where a conflict exists between the requirements of the standards listed below and this chapter, this chapter shall prevail. The duties of the in-service inspector do not include the installation's compliance with other standards and requirements (environmental, construction, ele…
R.296-104-296-104-255 Installation—What are the required clearances for boilers?
1.8K chars
When boilers are replaced or new boilers installed in either existing or new buildings, a minimum top clearance as specified below shall be provided between the top of boiler proper and ceiling. Sufficient access must be provided for inspection, maintenance, operations, and repai…
R.296-104-296-104-260 Installation—What are the required clearances for unfired pressure vessels?
1.3K chars
When unfired pressure vessels are replaced or new vessels are installed in either existing or new buildings, clearances shall be provided to allow access for safe operation, inspection, maintenance, and/or repair. Passageways around all sides of pressure vessels shall have an uno…
R.296-104-296-104-265 Installation—What are the requirements for unfired pressure vessels installed underground?
0.7K chars
Unfired pressure vessels installed underground shall comply with the following requirements:(1) A pit with concrete or masonry sides and floor shall enclose the underground portion of the unfired pressure vessel.(2) Pit covers shall be removable.(3) Clearances shall be as require…
R.296-104-296-104-271 Installation—How does an owner, user, or installer obtain a variance from clearances?
0.6K chars
Variances from WAC 296-104-255, 296-104-260, and 296-104-265 may be requested. The variance request shall be in writing on an appropriate form approved by the chief inspector, and shall specify how equivalent safety is to be maintained. The chief inspector may grant the variance …
R.296-104-296-104-273 Installation—What inspections are required for reinstalled standard boilers or unfired pressure vessels?
1.6K chars
When a stationary standard boiler or unfired pressure vessel is moved and reinstalled it must be inspected and documented on the inspection report by an inspector. The following will be required:(1) An installation permit must be submitted in accordance with WAC 296-104-020.(2) T…
R.296-104-296-104-295 Installation—What are the requirements for an explosion door?
0.5K chars
Provide substantial deflectors to divert the blast when explosion doors are located within seven feet of the firing floor or an operating platform.[Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150, 70.79.290, 70.79.330, 70.79.350, and chapter 70.79 RCW. WSR 02-23-036, rec…
R.296-104-296-104-300 Installation—What control and limit devices are required on automatically fired boilers prior to June 1989?
1.2K chars
All automatically fired steam, vapor, or hot water boilers except boilers having a constant attendant who has no other duties while the boiler is in operation, shall be equipped with:(1) An automatic low-water fuel cutoff; and(2) An automatic water feeding device. (3) All devices…