43,782 sections across 2,189 Washington regulatory chapters.
296-150T-296-150T-0495 Contractor deposit accounts.
0.4K chars
Manufacturers are required to open and maintain, for the purpose of inspection payments, a deposit account. Funds, for the purpose of inspections performed by the department, must be withdrawn from the account and all inspections paid in full prior to an insignia being placed on …
296-150T-296-150T-0500 When is an inspection required?
1.6K chars
(1) Before we issue an insignia, each factory-built temporary worker housing structure must be inspected at the manufacturing location as many times as are required by the temporary worker housing construction standard. (See WAC 296-150T-0600.) Inspections may include:(a) A "cove…
296-150T-296-150T-0510 How do I request an inspection?
0.5K chars
(1) You must contact us, and we will let you know where your request for inspection should be submitted. Our address is noted in the definition of department.(2) We must receive in-state inspection requests at least seven calendar days prior to the date that you want the inspecti…
296-150T-296-150T-0520 What happens if my factory-built temporary worker housing structure passes inspection?
0.4K chars
(1) If your factory-built temporary worker housing structure passes inspection and you have met the other requirements of this chapter, we will attach the insignia.(2) After our final inspection, we will send a notice to the local enforcement agency (NLEA) indicating whether furt…
296-150T-296-150T-0530 Am I charged if I request an inspection but I am not prepared?
0.6K chars
(1) If you ask us to inspect a factory-built temporary worker housing structure within Washington state but you are not prepared when we arrive, you must pay the minimum inspection fee and travel. (See WAC 296-150T-3000.)(2) If you ask us to inspect a factory-built home, commerci…
296-150T-296-150T-0540 Who inspects factory-built temporary worker housing structures for installation at the temporary worker housing site?
0.7K chars
(1) The department of health must approve the installation.(2) The department of health may also request a set of design plans and specifications for the unit from you.(3) After the unit is manufactured but before occupancy, we must inspect a factory-built temporary worker housin…
296-150T-296-150T-0550 Do you notify the department of health after your final inspection of factory-built structures at a manufacturing location?
0.5K chars
After we perform a final inspection of a factory-built temporary worker housing structure we will send a notice to the department of health that:(1) Specifies what connections, standards, and incomplete items the department of health must check when the unit is installed; and/or(…
296-150T-296-150T-0580 Must I obtain an insignia for used factory-built structures?
0.3K chars
All used factory-built housing and commercial structures that are to be for temporary worker housing must have an insignia of approval from us prior to being installed as temporary worker housing.[Statutory Authority: RCW 43.22.480. WSR 99-12-079, § 296-150T-0580, filed 5/28/99, …
296-150T-296-150T-0590 How do I obtain insignia for used factory-built structures?
0.7K chars
We consider used factory-built housing and commercial structures as new structures for purposes of use as temporary worker housing and an insignia approval as temporary worker housing must be obtained. To obtain insignia, you must:(1) Have the design plan approved by us (see WAC …
296-150T-296-150T-0600 What manufacturing codes apply to factory-built temporary worker housing?
1.4K chars
(1) All design, construction, installations, and alterations of factory-built temporary worker housing structures must conform with the following codes and the requirements of this chapter:(a) The temporary worker housing construction code, chapter 246-359 WAC;(b) The National El…
296-150T-296-150T-0700 Must manufacturers of factory-built temporary worker housing structures notify you if they manufacture at more than one location?
0.5K chars
(1) If you are manufacturing factory-built temporary worker housing structures at more than one location, approved design plans must be available at each manufacturing location.(2) You are required to send us the following information for each manufacturing location:(a) Company n…
296-150T-296-150T-0710 Must manufacturers of factory-built temporary worker housing structures notify you of a change in business name or address?
0.3K chars
(1) If you are moving, notify us in writing prior to a change of business name or address.(2) Your notice must include the change of name and address.[Statutory Authority: RCW 43.22.480. WSR 99-12-079, § 296-150T-0710, filed 5/28/99, effective 6/28/99.]
296-150T-296-150T-0720 Must manufacturers of factory-built temporary worker housing structures notify you of a change in business ownership?
0.3K chars
(1) When a manufacturer changes ownership, the new owner must notify us in writing immediately.(2) A new owner may continue to manufacture the units according to a prior approved design plan if the prior owner releases the design plan.[Statutory Authority: RCW 43.22.480. WSR 99-1…
296-150T-296-150T-3000 Factory-built temporary worker housing fees.
8.3K chars
(Effective until July 1, 2026) INITIAL FILING FEE$72.50 DESIGN PLAN FEES: INITIAL ONE YEAR DESIGN$211.20 RENEWAL FEE$72.50 RESUBMIT FEE$105.00 ADDENDUM (Approval expires on same date as original plan)$105.00 ELECTRONIC PLAN SUBMITTAL FEE $7.00 per page for the first set of plans …
296-150V-296-150V-0010 Authority, purpose, and scope.
0.6K chars
(1) This chapter is authorized by RCW 43.22.340 through 43.22.434 covering the construction, alteration, and approval of conversion vendor units and medical units sold, leased, or used in Washington state.(2) This chapter applies to the approval of conversion vendor unit and medi…
296-150V-296-150V-0020 What definitions apply to this chapter?
6.2K chars
"Alteration" is the replacement, addition, modification, or removal of any equipment or installation that affects the construction for concentrated floor loads, fire and life safety, or the plumbing, mechanical, and electrical systems of a conversion vendor unit or medical unit.T…
296-150V-296-150V-0030 How is this chapter enforced?
0.4K chars
(1) To enforce this chapter, we or another governmental inspection agency will inspect each conversion vendor unit or medical unit manufactured, sold, leased, or used in Washington state as required by this chapter.(2) We will inspect all alterations.(3) We will conduct inspectio…
296-150V-296-150V-0040 Is manufacturing information kept confidential?
0.4K chars
We will only release manufacturing information such as design plans, specifications, and test results according to the requirements of the Public Records Act (see RCW 42.17.310 (1)(h)) unless we are ordered to do so by a court or otherwise required by law.[Statutory Authority: Ch…
296-150V-296-150V-0050 Can you prohibit the sale or lease of a conversion vendor unit or medical unit?
0.6K chars
(1) We may prohibit the sale or lease of your conversion vendor unit or medical unit because it is unlawful for any person to sell, lease, or offer for sale a conversion vendor unit or medical unit within this state if it violates any of the requirements of this chapter.(2) If an…
296-150V-296-150V-0060 Who handles consumer complaints about conversion vendor units or medical units?
0.5K chars
(1) Consumers may file complaints within one year of the date of manufacture.(2) The complaint should be in writing and describe the item(s) that may not comply with this chapter.(3) After we receive the complaint, we will send the manufacturer and the dealer a copy of the compla…
296-150V-296-150V-0070 Do you have reciprocal agreements with other states to inspect conversion vendor units and medical units?
0.8K chars
(1) We will enter into reciprocal agreements with states that have inspection standards equal or greater than our standard.(2) When we have a reciprocal agreement with another state:(a) The reciprocal state inspects the conversion vendor units and medical units manufactured in th…
296-150V-296-150V-0080 Do you allow a local enforcement agency to inspect conversion vendor units and medical units at the manufacturing location?
0.5K chars
(1) A local enforcement agency (city or county), under contract with us, can inspect conversion vendor units and medical units. In some cases, another agency's contracts may be limited to specific portions of an inspection at specified manufacturing locations.(2) After approving …
296-150V-296-150V-0100 What happens if I disagree with your decision regarding my compliance with this chapter?
0.7K chars
(1) If we determine that you are in violation of this chapter, you will receive a notice of noncompliance.(2) If you disagree with our decision, you can send us a written request for a hearing, stating why you disagree.(3) After we receive your hearing request, we will:(a) Schedu…
296-150V-296-150V-0110 Do you have an advisory board to address conversion vendor unit and medical unit issues?
0.3K chars
The factory assembled structures (FAS) board advises us on issues relating to plumbing, mechanical, electrical, inspections, and rule adoption for conversion vendor units and medical units. (See RCW 43.22.420.)[Statutory Authority: Chapter 43.22 RCW. WSR 99-18-069, § 296-150V-011…
296-150V-296-150V-0120 Where can I obtain technical assistance regarding conversion vendor units or medical units?
0.4K chars
We offer field technical service to conversion vendor unit and medical unit manufacturers for an hourly fee. (See WAC 296-150V-3000.) Field technical service may include evaluation, consultation, plan examination, interpretation, and clarification of technical data relating to th…
296-150V-296-150V-0140 Do you allow the use of alternate materials, design, or method of construction?
1.9K chars
An applicant may apply for the use of alternate materials, design, or methods of construction different from the requirements of this chapter by filing a written request with the department.(1) Responsibilities of the applicant. The applicant must submit in writing the following …
296-150V-296-150V-0200 Who must obtain conversion vendor unit or medical unit insignia?
1.2K chars
(1) You must obtain an insignia from us for each conversion vendor unit or medical unit manufactured, sold, leased, or used in Washington state.(2) You do not need an insignia for a conversion vendor unit or medical unit if a unit was manufactured prior to July 1, 1968. (See RCW …
296-150V-296-150V-0210 What are the insignia requirements?
0.8K chars
(1) If you are applying for insignia, you must have your design plan approved when required by WAC 296-150V-0300 and your conversion vendor unit or medical unit inspected and approved by us.(2) If you are a manufacturer, dealer, or owner applying for an alteration insignia, your …
296-150V-296-150V-0220 How do I obtain insignia information and the required forms?
0.3K chars
Upon request, we will provide you with a packet of information that includes the required forms. Our address is noted in the definition of "department" in WAC 296-150V-0020.[Statutory Authority: Chapter 43.22 RCW. WSR 99-18-069, § 296-150V-0220, filed 8/31/99, effective 10/1/99.]
296-150V-296-150V-0230 What are the insignia application requirements?
1.4K chars
(1) If you are requesting insignia for conversion vendor units or medical units your completed application must include:(a) A completed design plan approval request form when required by WAC 296-150V-0300;(b) When required by WAC 296-150V-0300, one complete set of design plans, s…
296-150V-296-150V-0240 What documentation do you need to perform an alteration inspection?
0.8K chars
If you alter a conversion vendor unit or medical unit, we must inspect the alteration.(1) Before we perform an alteration inspection and attach an alteration insignia, you must send us:(a) Description of the proposed alteration;(b) The plan review fee;(c) The inspection fee; and(…
296-150V-296-150V-0250 How do I replace lost or damaged insignia?
0.9K chars
(1) If an insignia is lost or damaged after it is placed on a conversion vendor unit or medical unit, you may obtain a replacement insignia by contacting us and providing the following:(a) Your name, address, and telephone number;(b) The name of the manufacturer or person convert…
296-150V-296-150V-0300 When is design-plan approval required?
1.1K chars
Design plans for conversion vendor units and medical units are required for units that are sold, leased, or used in Washington state and must be approved when:(1) Conversion vendor units that contain one or more of the following components:(a) Concentrated loads exceeding five hu…
296-150V-296-150V-0310 Who can approve design plans?
0.4K chars
(1) Design plans for conversion vendor units can be approved by us or by a licensed professional or firm authorized by us. (See WAC 296-150V-0420 and 296-150V-0430.)(2) All design plans for medical units must be reviewed and approved by the department.[Statutory Authority: Chapte…
296-150V-296-150V-0320 What must I provide with my request for conversion vendor unit or medical unit design-plan approval by the department?
3.8K chars
(1) All requests for design-plan approval must include:(a) A completed design-plan approval request form;(b) Two sets of design plans, specifications and test results and procedures necessary for a complete evaluation of the design;(c) Receipt of the design-plan fee listed in WAC…
296-150V-296-150V-0340 When is an engineering analysis or structural load test for design plans required?
0.3K chars
An engineering analysis or structural load test may be required when there are concentrated loads of 500 pounds or more in a 16 square feet or less area.[Statutory Authority: Chapter 43.22 RCW. WSR 99-18-069, § 296-150V-0340, filed 8/31/99, effective 10/1/99.]
296-150V-296-150V-0350 What must test procedures and results for design plans include?
0.7K chars
(1) Test to a design must be witnessed by a professional engineer or architect licensed in Washington or by a department employee.(2) Test reports must contain the following items:(a) A description of the methods or standards that applied to the test;(b) Drawings and a descriptio…
296-150V-296-150V-0380 What happens if you approve my design plan?
0.6K chars
(1) Your design plan will be approved if it meets the requirements of this chapter.(2) We will send you an approved copy of the design plan with the design-plan approval number.(3) You must keep copies of the approved design plan available for inspection at each location where th…
296-150V-296-150V-0390 If my design plan is not approved, how much time do I have to submit a corrected design plan?
0.5K chars
(1) You have ninety days to correct and resubmit your original design plan and send us the resubmittal fee after we notify you of plan deficiencies. After ninety days, your initial design plan is returned to you.(2) If you submit your corrected design plan after ninety days, the …
296-150V-296-150V-0400 What happens after my design plan is approved?
0.2K chars
Once your design plan is approved, we will inspect each conversion vendor unit and medical unit.[Statutory Authority: Chapter 43.22 RCW. WSR 99-18-069, § 296-150V-0400, filed 8/31/99, effective 10/1/99.]
296-150V-296-150V-0410 When does my design plan expire?
0.6K chars
(1) Your conversion vendor unit or medical unit one-year design plan expires either one year after approval or when there is an electrical code change. You must submit new design plans for approval when there is a state building code cycle change. You may use your design plans to…
296-150V-296-150V-0415 Who approves addendums to design plans?
0.2K chars
Any addendums to a design plan must be approved by the department.[Statutory Authority: Chapter 43.22 RCW. WSR 99-18-069, § 296-150V-0415, filed 8/31/99, effective 10/1/99.]
296-150V-296-150V-0420 Who can be authorized to approve design plans?
0.6K chars
(1) A professional engineer, architect, or firm licensed by the state of Washington according to the Engineers Registration Act, chapter 18.43 RCW and/or the Architects Registration Act, chapter 18.08 RCW; or(2) A professional engineer, architect, or firm licensed in another stat…
296-150V-296-150V-0430 What information must a professional or firm provide to be authorized to approve design plans?
0.6K chars
(1) Name, a copy of your certificate of registration or authority, and address of the professional engineer, architect, or firm; and(2) A description of the services the professional engineer, architect, or firm will provide in the areas of fire and life safety, mechanical, plumb…
296-150V-296-150V-0440 How will I know whether I am authorized to approve design plans?
1.0K chars
Within 60 days after you submit the information requested in WAC 296-150V-0430, we will send you a letter either approving or denying your authorization request.(1) If we approve your request, your name is added to the list of licensed professionals and firms authorized to approv…
296-150V-296-150V-0450 How long is a licensed professional or firms authorization effective?
2.0K chars
Your authorization to approve design plans is effective until your license expires, is revoked or suspended or until your authorization to approve plans is revoked or suspended in accordance with subsection (3) or (4) of this section.(1) You must notify us of your license renewal…
296-150V-296-150V-0460 What information must a manufacturer send to the department when a professional or firm does the design-plan approval?
0.8K chars
You must send us the following information in your approved design plans:(1) A completed departmental design-plan approval request form;(2) A set of the design plan drawings, specifications, engineering analysis, and test results and procedures necessary for a complete code evalu…
296-150V-296-150V-0470 What happens after we receive the professional or firm approved design plan and information?
1.6K chars
(1) After we receive your approved design plans and information, we will check the design plans and information to reasonably assure they contain the documents and plan information outlined in our written guidelines for plan reviews as provided to approved licensed professionals.…
296-150V-296-150V-0480 Do you have a list of professionals or firms that are authorized to approve design plans?
0.2K chars
Yes. We will maintain a list of the licensed professionals and firms that are authorized to approve design plans for conversion vendor units.[Statutory Authority: Chapter 43.22 RCW. WSR 23-09-024, § 296-150V-0480, filed 4/11/23, effective 4/11/23.]
296-150V-296-150V-0490 Who approves addendums to design plans approved by a professional or firm?
0.4K chars
(1) You must have the professional or firm approve an addendum to a design plan, if they initially approved your design plan.(2) If the professional or firm who approved your design plan is no longer on the department list, you may have us approve your addendum.[Statutory Authori…