PSC-119-119.11 Control schematics
2.2K chars
PSC 119.11 Control schematics. Subchapter I — General PSC 119.01 Scope. This chapter implements s. 196.496, Stats. It applies to all DG facilities with a capacity of 15 MW or less that are interconnected, or whose owner seeks to have interconnected, to an electric public utility’…
PSC-119-119.12 Site plan
0.4K chars
PSC 119.12 Site plan. For all categories, the applicant shall include with the application a site plan that shows the location of the interconnection disconnect switch, adjoining street name, and the street address of the DG facility. For Category 2, 3, or 4 DG facilities, the si…
PSC-119-119.13 Pre-application report
19.7K chars
PSC 119.13 Pre-application report. (1) Potential applicants may request a pre-application report in order to obtain information about system conditions at their proposed interconnection location, without submitting an application under s. PSC 119.04. (2) To request a pre-applicat…
PSC-119-119.20 General design requirements
0.0K chars
PSC 119.20 General design requirements.
PSC-119-119.25 Minimum protection requirements
0.1K chars
PSC 119.25 Minimum protection requirements. Subchapter IV — Equipment Certification
PSC-119-119.26 Certified paralleling equipment
0.0K chars
PSC 119.26 Certified paralleling equipment.
PSC-119-119.27 Non-certified paralleling equipment
0.1K chars
PSC 119.27 Non-certified paralleling equipment. Subchapter V — Testing of DG Facility Installations
PSC-119-119.30 Unintentional islanding test
0.0K chars
PSC 119.30 Unintentional islanding test.
PSC-119-119.31 Commissioning tests for paralleling equipment in Categories 2 to 4
0.1K chars
PSC 119.31 Commissioning tests for paralleling equipment in Categories 2 to 4.
PSC-119-119.32 Additional test
0.0K chars
PSC 119.32 Additional test.
PSC-119-119.40 Dispute Procedures
29.2K chars
PSC 119.40 Dispute Procedures. (9) “Commission” means the public service commission of Wisconsin. (10) “Commissioning test” means the process of documenting and verifying the performance of a DG facility so that it operates in conformity with the design specifications. (11) “Cust…
PSC-12-12.01 Purpose
0.1K chars
PSC 12.01 Purpose. The purpose of this chapter is to implement s. 196.595, Stats. History: Cr. Register, April, 1988, No. 388, eff. 5-1-88.
PSC-12-12.02 Definitions
1.4K chars
PSC 12.02 Definitions. In this chapter: (1) XAdvertisingY has the meaning set forth in s. 196.595 (1) (a), Stats. (2) XDirect and substantial benefitsY means a benefit that is produced by advertising which: (a) Demonstrates or provides information about available energy conservat…
PSC-12-12.03 Prior approval
0.4K chars
PSC 12.03 Prior approval. A public utility may submit an advertisement to the public service commission prior to public presentation for a determination as to whether the advertisement produces a demonstrated, direct and substantial benefit to the consumer. The commission shall m…
PSC-12-12.04 Demonstration of benefit
0.9K chars
PSC 12.04 Demonstration of benefit. (1) A utility may demonstrate that its advertisements produce a direct and substantial benefit by showing the commission that the advertisements: (a) Promote conservation or safety, or are required by law; (b) Are likely to produce the effect o…
PSC-12-12.05 Participation in advertising of others
0.4K chars
PSC 12.05 Participation in advertising of others. No advertising sponsored by a utility[s parent company or affiliated interest, as defined in s. 196.52 (1), Stats., or by any other national or regional organizations, may be charged to utility consumers unless it complies with s.…
PSC-128-128.01 Definitions
0.0K chars
PSC 128.01 Definitions.
PSC-128-128.02 Applicability
0.0K chars
PSC 128.02 Applicability.
PSC-128-128.03 Political subdivision authority
0.0K chars
PSC 128.03 Political subdivision authority.
PSC-128-128.04 Enforcement
0.1K chars
PSC 128.04 Enforcement. Subchapter II — Owner Requirements
PSC-128-128.10 Incorporating owner requirements into local ordinances
0.1K chars
PSC 128.10 Incorporating owner requirements into local ordinances.
R.128.105 Development of a wind energy system; notice requirements
0.1K chars
PSC 128.105 Development of a wind energy system; notice requirements.
PSC-128-128.11 Real property provisions
0.0K chars
PSC 128.11 Real property provisions.
PSC-128-128.12 Existing property uses
0.0K chars
PSC 128.12 Existing property uses.
PSC-128-128.13 Siting criteria
0.0K chars
PSC 128.13 Siting criteria.
PSC-128-128.14 Noise criteria
0.0K chars
PSC 128.14 Noise criteria.
PSC-128-128.15 Shadow flicker
0.0K chars
PSC 128.15 Shadow flicker.
PSC-128-128.16 Signal interference
0.0K chars
PSC 128.16 Signal interference.
PSC-128-128.17 Stray voltage
0.0K chars
PSC 128.17 Stray voltage.
PSC-128-128.18 Construction and operation
0.0K chars
PSC 128.18 Construction and operation.
PSC-128-128.19 Decommissioning
1.8K chars
PSC 128.19 Decommissioning. Subchapter I — General PSC 128.01 Definitions. In this chapter: (1) XCommercial communicationsY includes communications used by government and military entities for emergency purposes, licensed amateur radio service, and non-emergency communications us…
PSC-128-128.30 Application and notice requirements
0.0K chars
PSC 128.30 Application and notice requirements.
PSC-128-128.31 Application completeness
0.0K chars
PSC 128.31 Application completeness.
PSC-128-128.32 Political subdivision review of a wind energy system
0.1K chars
PSC 128.32 Political subdivision review of a wind energy system.
PSC-128-128.33 Political subdivision permitted provisions
0.1K chars
PSC 128.33 Political subdivision permitted provisions.
PSC-128-128.34 Record of decision
0.0K chars
PSC 128.34 Record of decision.
PSC-128-128.35 Modifications to an approved wind energy system
0.1K chars
PSC 128.35 Modifications to an approved wind energy system.
PSC-128-128.36 Monitoring compliance
0.1K chars
PSC 128.36 Monitoring compliance. Subchapter IV — Complaints
PSC-128-128.40 Complaint process
0.0K chars
PSC 128.40 Complaint process.
PSC-128-128.41 Monitoring committee
0.0K chars
PSC 128.41 Monitoring committee.
PSC-128-128.42 Notice to property owners and residents
0.1K chars
PSC 128.42 Notice to property owners and residents. Subchapter V — Commission Procedure
PSC-128-128.50 Standards established by the commission
0.1K chars
PSC 128.50 Standards established by the commission.
PSC-128-128.51 Commission review
0.1K chars
PSC 128.51 Commission review. Subchapter VI — Small Wind Energy Systems
PSC-128-128.60 Exemptions from this chapter
0.0K chars
PSC 128.60 Exemptions from this chapter.
PSC-128-128.61 Modifications to this chapter
75.0K chars
PSC 128.61 Modifications to this chapter. (10) XOccupied community buildingY means a school, church or similar place of worship, daycare facility or public library. (12) XOwnerY means: (a) A person with a direct ownership interest in a wind energy system, regardless of whether th…
PSC-130-130.01 Definitions
1.1K chars
PSC 130.01 Definitions. In this chapter: (1) XActual costY means identifiable costs that are reasonably incurred by a municipality, but does not include a contribution of surplus income to general revenues. (2) XMunicipal regulationY includes any ordinance or resolution adopted b…
PSC-130-130.02 Scope
0.2K chars
PSC 130.02 Scope. This chapter applies to complaints involving utility access to and use of municipal rights-of-way within a municipality under ss. 196.499 (14) and 196.58 (4), Stats.
PSC-130-130.03 Special design and construction conditions
1.0K chars
PSC 130.03 Special design and construction conditions. (1) Except as provided in sub. (2), a municipal regulation that requires a utility to install, at the utility[s expense, transmission or distribution facilities which are not consistent with the utility[s practice for design …
PSC-130-130.04 Discrimination
0.5K chars
PSC 130.04 Discrimination. Unless there is an adequate health, safety, or public welfare justification, it is unreason- PSC 130.08 PSC 130.09 PSC 130.10 PSC 130.11 PSC 130.12 PSC 130.13 Compliance with existing law. Permanent relocation of utility facilities. Advanced excavation …
PSC-130-130.05 Management function costs
1.7K chars
PSC 130.05 Management function costs. (1) A municipal regulation is unreasonable if it requires a utility to pay more than the actual cost of functions undertaken by the municipality to manage utility access to and use of municipal rights-ofway. These management functions include…