20,156 sections across 1,502 Wisconsin regulatory chapters.
NR-126-126.04 Allowable costs
1.7K chars
NR 126.04 Allowable costs. (1) PRELIMINARY PLANCosts of studies, investigations, surveys, planning and other steps necessary to determine the economic and engineering feasibility of a proposed project. (2) ENGINEERING, ARCHITECTURAL, INSPECTION AND OTHER FEES FOR TECHNICAL SERVIC…
NR-126-126.05 Costs not allowable
3.0K chars
NR 126.05 Costs not allowable. The following costs are not allowable for state participation: (1) INELIGIBLE WORK. The cost of any work not included in the eligible portion of the project as approved by the department. (2) COST OF SITE. The cost of the site or easements or any es…
NR-126-126.06 Preliminary project evaluation
1.0K chars
NR 126.06 Preliminary project evaluation. Municipalities desiring a preliminary point rating and eligibility determination made for a project, prior to the submission of an application or plans and specifications, may submit such a request with accompanying documents s. NR 126.07…