Eaton ATS Manufacturing (Fayetteville, NC)
Eaton's primary large-frame ATS manufacturing facility in Fayetteville, NC. Produces large-frame ATS from 800A to 3,000A — the critical data center and hospital segment. This facility is the primary source of the ATS units that went to 52+ week lead times during the 2022-2023 AI data center buildout. Product lines include the OTEC series and ATSC (closed-transition) for mission-critical applications. Source: https://www.eaton.com/us/en-us/products/backup-power-ups-surge-it-power-distribution/automatic-transfer-switches.html