Facility

Taiyo Nippon Sanso Kimitsu Sanso Center

Operated by Taiyo Nippon Sanso Holdings (Nippon Sanso Holdings)JP · Chiba Prefectureprocessing

Taiyo Nippon Sanso neon purification facility at Kimitsu Sanso Center; new 27-million-liter/year purification system announced, operational start March 2026. Attached to steel mill infrastructure for crude neon sourcing. Supplies ~80% of Japan's domestic semiconductor-grade neon. Source: https://www.tn-sanso.co.jp/en/

1

Inputs produced

1

Goods downstream

0

Incidents on record

0

Stories

What's produced here

1 input from this facility

Tap an input to see every good that depends on it, every country that produces it, and every other company in the supply chain.

Where it shows up

Goods that depend on this facility