Title 10 › Subtitle A — General Military Law › PART VI — ELEMENTS OF DEPARTMENT OF DEFENSE AND OTHER MATTERS › Subpart B — Atomic Energy Defense › CHAPTER 603 — PROLIFERATION MATTERS › § 6153
Requires the Secretary of Energy to send Congress a plan by February 1, 2003 for building and running a mixed-oxide (MOX) fuel plant at the Savannah River Site in Aiken, South Carolina. The plan must show a schedule to meet the MOX production goal by January 1, 2012 and to make 1 metric ton of MOX fuel by December 31, 2012, and to turn 34 metric tons of weapons‑usable plutonium into MOX fuel by January 1, 2019. The Secretary must send Congress an annual report by February 15 each year from 2004 through 2024 about how the plan is going. Early reports (before 2010) must say if schedules are being met and if the 2012 goal is possible. Reports after 2014 must say whether the goal was met and progress on related U.S. obligations. Reports after 2019 must include steps to meet the goal or to remove the remaining plutonium from South Carolina. If the project falls 12 months or more behind schedule, the Secretary must send Congress a corrective plan by August 15 of that year with milestones. If the Secretary finds a big risk the 2012 goal will not be met, transfers of plutonium to the site must stop until the risk is fixed and the Secretary certifies the goal can be met. If the goal is not met by January 1, 2014, the Secretary must, under other laws, remove at least 1 metric ton by January 1, 2016 and by January 1, 2022 remove the amount that was sent to the site between April 15, 2002 and January 1, 2022 but not processed. If the goal is missed, South Carolina may get economic help: $1,000,000 per day (up to $100,000,000 per year) in certain years until either the goal is met or required removals happen. If less than 34 metric tons are processed by October 1, 2026, the Secretary must send a plan by December 1, 2026 (and every two years after) to finish processing 34 tons or to remove the unprocessed amount. If MOX operations end and fuel still remains after one year, the Secretary must report when it will go to reactors or how it will be removed. Also required: a baseline report by December 31, 2006 to set schedules. Definitions: MOX production objective — average production of at least 1 metric ton of MOX fuel per year once the plant is officially operational; MOX facility — the mixed‑oxide fuel plant at the Savannah River Site; defense plutonium/defense plutonium materials — weapons‑usable plutonium.
Full Legal Text
Armed Forces, Source: USLM XML via OLRC
Legislative History
Reference
Citation
10 U.S.C. § 6153
Title 10, Armed Forces
Last Updated
Sep 22, 2026
Release point: 119-110