Title 16 › CHAPTER 1 — NATIONAL PARKS, MILITARY PARKS, MONUMENTS, AND SEASHORES › SUBCHAPTER CVIII — GAULEY RIVER NATIONAL RECREATION AREA › § 460ww–4
Any agency or person who starts building a new water project at or connected to the Summersville project after October 26, 1988 must follow conditions the Secretary sets to protect the recreation area. The Secretary will require whatever measures are needed to protect resources and to make sure whitewater and other recreation are not harmed during or after construction. If the new project directly harms downstream access — such as parking, visitor facilities, or river access for whitewater and other uses — the builder must replace and improve those facilities as the Secretary decides so visitors can still use them. Those conditions must appear in any license, permit, or exemption and the project must follow the rest of the Act. For four years after October 26, 1988, a project next to Summersville Dam proposed by the city or by an applicant with a permit or license on file by August 8, 1988 may be licensed if it meets these rules. If licensed in that period, the Secretary will move the upstream boundary to a line crossing a point 550 feet downstream of the valve house and 1,200 feet upstream (along the river bank) of USGS Gauge Number 03189600, while keeping any lands on the map that are not needed for the project inside the recreation area. If construction does not start in the time required by the license, or the license is surrendered, the boundary change stops.
Full Legal Text
Conservation, Source: USLM XML via OLRC
Legislative History
Reference
Citation
16 U.S.C. § 460ww–4
Title 16, Conservation
Last Updated
Sep 22, 2026
Release point: 119-110