Title 16 › Chapter 1— NATIONAL PARKS, MILITARY PARKS, MONUMENTS, AND SEASHORES › Subchapter CVIII— GAULEY RIVER NATIONAL RECREATION AREA › § 460ww–4
If anyone starts building a new dam, water pipe, reservoir, powerhouse, transmission line, or similar project at or linked to the Summersville project after October 26, 1988, they must follow rules the Secretary sets to protect the recreation area. Those rules must protect whitewater use and other recreation during and after construction. If the new project would directly hurt access just downstream of Summersville Dam — for example parking, related facilities, or river access for whitewater and other recreation — the builder must replace and improve those facilities as the Secretary requires to handle visitors. Any required terms must be put in the project’s license, permit, or exemption, and the project must follow the Act’s rules. One exception: for four years after October 26, 1988, the Act does not stop licensing a project next to Summersville Dam as proposed by the city of Summersville, or by any competing applicant who had a permit or license application on file on August 8, 1988, so long as the project follows these rules. If such a project is licensed in that four-year period, the Secretary will change the recreation area’s upstream boundary to a line perpendicular to the river that crosses the point 550 feet downstream of the existing valve house and 1,200 feet upstream (measured along the river bank) of United States Geological Survey Gauge Numbered 03189600, while keeping lands inside the boundary map that are not needed for the project. If construction does not start in the time allowed by the license, or the license is given up, that boundary change ends.
Full Legal Text
Conservation, Source: USLM XML via OLRC
Legislative History
Reference
Citation
16 U.S.C. § 460ww–4
Title 16, Conservation
Last Updated
Apr 5, 2026
Release point: 119-73not60