Title 33, Navigation and Navigable WatersRelease 119-73not60

§702a–5 Back Levee North of Eudora Floodway

Title 33 › Chapter 15— FLOOD CONTROL › § 702a–5

Last updated Apr 5, 2026|Official source

Summary

Build the back-protection levee north of the Eudora Floodway to the same height and shape as the levees on the east side of the Mississippi River. The stretch from the head of the Eudora Floodway north to the Arkansas River must be placed so there is enough room for floodwaters and must be built at the same time as the Eudora Floodway. Until the Eudora Floodway is working, leave openings in the back levee north of the floodway head. The Chief of Engineers will decide how big those openings must be so expected floodwaters can pass if the riverside fuse-plug levee breaks before the floodway is operating.

Full Legal Text

Title 33, §702a–5

Navigation and Navigable Waters, Source: USLM XML via OLRC

The back-protection levee north of the Eudora Floodway shall be constructed to the same grade and section as the levees opposite on the east side of the Mississippi River: Provided, That this levee extending from the head of the Eudora Floodway north to the Arkansas River shall be so located as to afford adequate space for the passage of flood waters without endangering the levees opposite on the east side of the river and shall be constructed contemporaneously with the construction of the Eudora Floodway; except that, until the Eudora Floodway is in operative condition, there shall be left in this back levee north of the head of the Eudora Floodway openings which shall be sufficient, in the discretion of the Chief of Engineers, to permit the passage of all flood waters to be reasonably contemplated in the event of any break in the riverside fuse-plug levee prior to the time the Eudora Floodway shall be in operative condition.

Legislative History

Notes & Related Subsidiaries

Statutory Notes and Related Subsidiaries

Abandonment and Repeal of ProjectsFor abandonment of Boeuf Floodway and Eudora Floodway as well as Northward Extension and back protection levee extending from head of Eudora Floodway north to Arkansas River and repeal of provisions relating to prosecution of work, see section 702a–12 of this title.

Reference

Citations & Metadata

Citation

33 U.S.C. § 702a–5

Title 33, Navigation and Navigable Waters

Last Updated

Apr 5, 2026

Release point: 119-73not60