Title 42 › CHAPTER 108 — NUCLEAR WASTE POLICY › SUBCHAPTER II — RESEARCH, DEVELOPMENT, AND DEMONSTRATION REGARDING DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTE AND SPENT NUCLEAR FUEL › § 10197
Allows the Secretary to start mining and building a test and evaluation facility at a site already being studied, no later than 64 months after January 7, 1983. The Secretary must prepare an environmental assessment first. The facility must be built to test and improve plans for a real radioactive waste repository. Its goals include helping finish site studies, showing that different technologies can work together, solving licensing questions left over from earlier work, checking scientific models under real conditions, improving component designs, adding geological data, testing how to package and move waste at the planned rate, and proving the facility can run without exposing workers to too much radiation. The facility must be able to hold no more than 100 full-sized canisters of solidified high-level waste (total not over 100 metric tons). Waste used for tests must be fully removable after tests. The isolation of waste must rely on engineered barriers working with the geology. The Secretary must begin in situ testing no later than 88 months after January 7, 1983. Tests will check sealing methods, radionuclide movement (including use of radioactive sources if safe for future repository use), groundwater flow, long-term and accelerated barrier behavior, heat and pressure effects, and responses to abnormal events like earthquakes, extreme heating, or human intrusion. The Secretary may do other needed R&D and may use materials from places like the Three Mile Island plant or the West Valley Demonstration Project if it is reasonably safe for the site. An environmental impact statement is required before tests with radioactive materials. The Secretary and the Commission must agree in writing on review and safety procedures within 1 year after January 7, 1983, and no shafts can be dug until that agreement exists. Operation must end no later than 5 years after the first repository starts operation, or sooner if the Secretary decides it is no longer needed. If the site becomes unsuitable, radioactive test material must be removed unless the Secretary and the Commission agree a short-term test poses no danger.
Full Legal Text
The Public Health and Welfare, Source: USLM XML via OLRC
Legislative History
Reference
Citation
42 U.S.C. § 10197
Title 42, The Public Health and Welfare
Last Updated
Sep 23, 2026
Release point: 119-110