Title 42, The Public Health and WelfareRelease 119-110

§17384 Smart Grid Technology Research, Development, and Demonstration

Title 42 › CHAPTER 152 — ENERGY INDEPENDENCE AND SECURITY › SUBCHAPTER IX — SMART GRID › § 17384

Last updated Sep 23, 2026|Official source

Summary

The Secretary must run a research, development, and demonstration program with help from the Federal Energy Regulatory Commission, other agencies, electric utilities, states, and other stakeholders. The program covers nine main areas, such as measuring peak-load and energy savings from smart meters and demand response; studying how distributed generation and storage can provide grid services; improving wide-area measurement, data analysis, and secure communications; testing reliability technologies in control-room outage scenarios; figuring needed communications capacity; studying time-of-use and real-time pricing; creating transmission software algorithms; promoting use of spare generation if transportation shifts to electricity; and, with FERC, proposing rules for using electricity stored in vehicles to meet peak demand. The Secretary must also set up a regional demonstration initiative made of projects in cities, suburbs, tribal lands, and rural areas to test advanced sensing, communications, control, automation, and integration of distributed energy. The goals are to show benefits, help move to commercial use of advanced grid tech, improve performance and reliability, measure energy savings and emission cuts, study regional differences, and support smarter local grid control for resilience. Projects must work with the utility that owns the local grid. The federal government can pay up to 50 percent of qualifying technology costs. Demo participants cannot get duplicate federal grants for the same investments. Project data must go into a public clearinghouse, but business secrets and individual customer information must be kept out. Projects must use open technical standards when appropriate. Funding is authorized: for the research program, such sums as are necessary for each of fiscal years 2008 through 2012; and for the regional demonstrations, such sums as may be necessary.

Full Legal Text

Title 42, §17384

The Public Health and Welfare, Source: USLM XML via OLRC

(a)Power grid digital information technology
The Secretary, in consultation with the Federal Energy Regulatory Commission and other appropriate agencies, electric utilities, the States, and other stakeholders, shall carry out a research, development, and demonstration program—
(1)to develop advanced techniques for measuring peak load reductions and energy-efficiency savings from smart metering, demand response, distributed generation, and electricity storage systems;
(2)to investigate means for demand response, distributed generation, and storage to provide ancillary services;
(3)to conduct research to advance the use of wide-area measurement and control networks, including data mining, visualization, advanced computing, and secure and dependable communications in a highly-distributed environment;
(4)to test new reliability technologies, including those concerning communications network capabilities, in a grid control room environment against a representative set of local outage and wide area blackout scenarios;
(5)to identify communications network capacity needed to implement advanced technologies.
(6)to investigate the feasibility of a transition to time-of-use and real-time electricity pricing;
(7)to develop algorithms for use in electric transmission system software applications;
(8)to promote the use of underutilized electricity generation capacity in any substitution of electricity for liquid fuels in the transportation system of the United States; and
(9)in consultation with the Federal Energy Regulatory Commission, to propose interconnection protocols to enable electric utilities to access electricity stored in vehicles to help meet peak demand loads.
(b)Smart grid regional demonstration initiative
(1)In general
The Secretary shall establish a smart grid regional demonstration initiative (referred to in this subsection as the “Initiative”) composed of demonstration projects focused on cost-effective, advanced technologies for use in power grid sensing, communications, analysis, power flow control, visualization, distribution automation, industrial control systems, dynamic line rating systems, grid redesign, and the integration of distributed energy resources.
(2)Goals
The goals of the Initiative shall be—
(A)to demonstrate the potential benefits of concentrated investments in advanced grid technologies on a regional grid;
(B)to facilitate the commercial transition from the current power transmission and distribution system technologies to advanced technologies;
(C)to facilitate the integration of advanced technologies in existing electric networks to improve system performance, power flow control, and reliability;
(D)to demonstrate protocols and standards that allow for the measurement and validation of the energy savings and fossil fuel emission reductions associated with the installation and use of energy efficiency and demand response technologies and practices;
(E)to investigate differences in each region and regulatory environment regarding best practices in implementing smart grid technologies; and
(F)to encourage the commercial application of advanced distribution automation technologies that exert intelligent control over electrical grid functions at the distribution level to improve system resilience.
(3)Demonstration projects
(A)In general
In carrying out the initiative, the Secretary shall provide financial support to smart grid demonstration projects in urban, suburban, tribal, and rural areas, including areas where electric system assets are controlled by nonprofit entities and areas where electric system assets are controlled by investor-owned utilities.
(B)Cooperation
A demonstration project under subparagraph (A) shall be carried out in cooperation with the electric utility that owns the grid facilities in the electricity control area in which the demonstration project is carried out.
(C)Federal share of cost of technology investments
The Secretary shall provide to an electric utility described in subparagraph (B) or to other parties financial assistance for use in paying an amount equal to not more than 50 percent of the cost of qualifying advanced grid technology investments made by the electric utility or other party to carry out a demonstration project.
(D)Ineligibility for grants
No person or entity participating in any demonstration project conducted under this subsection shall be eligible for grants under section 17386 of this title for otherwise qualifying investments made as part of that demonstration project.
(E)Availability of data
The Secretary shall establish and maintain a smart grid information clearinghouse in a timely manner which will make data from smart grid demonstration projects and other sources available to the public. As a condition of receiving financial assistance under this subsection, a utility or other participant in a smart grid demonstration project shall provide such information as the Secretary may require to become available through the smart grid information clearinghouse in the form and within the timeframes as directed by the Secretary. The Secretary shall assure that business proprietary information and individual customer information is not included in the information made available through the clearinghouse.
(F)Open protocols and standards
The Secretary shall require as a condition of receiving funding under this subsection that demonstration projects utilize open protocols and standards (including Internet-based protocols and standards) if available and appropriate.
(c)Authorization of appropriations
There are authorized to be appropriated—
(1)to carry out subsection (a), such sums as are necessary for each of fiscal years 2008 through 2012; and
(2)to carry out subsection (b), such sums as may be necessary.

Legislative History

Notes & Related Subsidiaries

Editorial Notes

Amendments

2020—Subsec. (a). Pub. L. 116–260, § 8001(1), inserted “research, development, and demonstration” before “program” in introductory provisions. Subsec. (b)(1). Pub. L. 116–260, § 8001(2)(A), amended par. (1) generally. Prior to amendment, text read as follows: “The Secretary shall establish a smart grid regional demonstration initiative (referred to in this subsection as the ‘Initiative’) composed of demonstration projects specifically focused on advanced technologies for use in power grid sensing, communications, analysis, and power flow control. The Secretary shall seek to leverage existing smart grid deployments.” Subsec. (b)(2)(F). Pub. L. 116–260, § 8001(2)(B), added subpar. (F). 2009—Subsec. (b)(3)(A). Pub. L. 111–5, § 405(1), amended subpar. (A) generally. Prior to amendment, text read as follows: “In carrying out the initiative, the Secretary shall carry out smart grid demonstration projects in up to 5 electricity control areas, including rural areas and at least 1 area in which the majority of generation and transmission assets are controlled by a tax-exempt entity.” Subsec. (b)(3)(C). Pub. L. 111–5, § 405(2), amended subpar. (C) generally. Prior to amendment, text read as follows: “The Secretary shall provide to an electric utility described in subparagraph (B) financial assistance for use in paying an amount equal to not more than 50 percent of the cost of qualifying advanced grid technology investments made by the electric utility to carry out a demonstration project.” Subsec. (b)(3)(E), (F). Pub. L. 111–5, § 405(3), added subpars. (E) and (F). Subsec. (c)(2). Pub. L. 111–5, § 405(4), amended par. (2) generally. Prior to amendment, par. (2) read as follows: “to carry out subsection (b), $100,000,000 for each of fiscal years 2008 through 2012.”

Statutory Notes and Related Subsidiaries

Effective Date

Section effective on the date that is 1 day after Dec. 19, 2007, see section 1601 of Pub. L. 110–140, set out as a note under section 1824 of Title 2, The Congress.

Reference

Citations & Metadata

Citation

42 U.S.C. § 17384

Title 42, The Public Health and Welfare

Last Updated

Sep 23, 2026

Release point: 119-110