Title 42 › CHAPTER 77 — ENERGY CONSERVATION › SUBCHAPTER III — IMPROVING ENERGY EFFICIENCY › Part C — Industrial Energy Efficiency › § 6344
State regulators or a nonregulated electric utility must act within 180 days after getting a request from a project owner about a waste-energy recovery project. They must give public notice, hold a hearing, and then decide in writing whether to apply a standard that lets a project that makes extra power use one of several options. Those options are: sell the extra power to the utility under a contract; have the utility carry the power to up to 3 places on its system so the project can sell it to third parties; build private wires to sell to up to 3 buyers within 3 miles (the wires can cross public rights-of-way but cannot use eminent domain and must stay separate from the utility grid except on the customer side of the meter to prevent exporting power onto the utility system); or make any other arrangement the utility and project owner agree on. The decision must be written, based on hearing evidence, and made public. The Administrator may join the hearing to estimate energy and emissions saved, and to analyze costs and benefits. The law sets how payment and transport rates are worked out. Sale payments are the full retail price the utility charges minus the utility’s per-unit distribution costs; if power needs voltage changes above 25 kilovolts, per-unit transmission costs are also subtracted. If the utility transports power for direct sale, the charge is the per-unit distribution costs plus a distribution margin (for nonregulated utilities the percentage used to get that margin must be at least 10%); voltage changes above 25 kilovolts add transmission costs. In States with competitive retail markets, the usual transportation rate there is used instead. Rates must change as utility costs change and follow the same billing rules as the utility’s regular rates. A utility does not have to accept more power than its equipment can handle unless the project pays to upgrade that equipment. If the authority declines to implement the standard, it must give written public reasons. The Administrator will report lost opportunities to Congress each year, and a project sponsor can ask again after 2 years.
Full Legal Text
The Public Health and Welfare, Source: USLM XML via OLRC
Legislative History
Reference
Citation
42 U.S.C. § 6344
Title 42, The Public Health and Welfare
Last Updated
Sep 22, 2026
Release point: 119-110