Title 43 › CHAPTER 42 — RURAL WATER SUPPLY › SUBCHAPTER I — RECLAMATION RURAL WATER SUPPLY › § 2405
Requires the Secretary to make or accept feasibility studies for proposed rural water projects and to work with non-Federal partners when money is available. The Secretary can do the study with a non-Federal partner, review a study the partner gives them, or give a grant or cooperative agreement to a qualified non-Federal partner if that is cost-effective. If the Secretary will not fund the study, they must tell the partner why. The Secretary checks each submitted study against required topics and rules. If a study is incomplete, the Secretary tells the partner and the partner pays to fix it. Studies must look at many things, including short- and long-term water needs, public health and safety benefits, alternative water sources and treatment options, environmental and source-water protection, conservation and efficiency options, construction and long-term costs, loan and financing options, the non-Federal entities’ ability to pay and their plans for operations and replacement, organizational and financial controls, partnerships, and, for tribal projects, economic self-sufficiency. The Secretary had to set formal criteria not later than 18 months after December 22, 2006, including ways to scale study work to the project size and reduce costs to non-Federal partners. After studies are done, the Secretary must write a feasibility report that recommends whether to authorize the project, sets a non-Federal construction share (at least 25 percent) based on ability to pay, recommends federal grants or loan guarantees if needed, allocates annual operation and maintenance costs among participants, assesses each participant’s ability to pay, sends the report to the Senate Committee on Energy and Natural Resources and the House Committee on Resources, makes it public, and publishes a Federal Register notice. For study costs, the federal share normally cannot exceed 50 percent (in-kind services may count), but the Secretary can raise that if there is financial hardship or require more non-Federal payment for projects that include a community over 50,000 people. The Secretary must consult relevant federal, state, tribal, regional, and local authorities throughout.
Full Legal Text
Public Lands, Source: USLM XML via OLRC
Reference
Citation
43 U.S.C. § 2405
Title 43, Public Lands
Last Updated
Sep 23, 2026
Release point: 119-110