Title 43, Public LandsRelease 119-110

§31l Earth Mapping Resources Initiative

Title 43 › CHAPTER 2 — UNITED STATES GEOLOGICAL SURVEY › § 31l

Last updated Sep 22, 2026|Official source

Summary

Creates the Earth Mapping Resources Initiative inside the U.S. Geological Survey to speed up and improve maps and data about the Nation’s resources. It must combine different kinds of mapping and data (like land shape, rock types, chemistry, and underground structure), pull together and link geospatial and resource data, and help interpret where minerals are above and below ground. The USGS can work with State geological surveys and use its normal contracting tools. The Initiative must put its geospatial data and metadata online for the public as it is collected. Within 10 years after November 15, 2021, the Initiative must finish an initial national surface and subsurface mapping and data integration effort. For mineral work, it must use a whole-ore-body approach (not single-commodity) and give priority to critical minerals. It must also map mine-waste areas and analyze samples, including ones in the National Geological and Geophysical Data Preservation Program, for critical minerals. The Initiative must merge data from existing programs (for example, national geologic mapping, the USMIN mineral database, the 3D Elevation Program, and other relevant sources like geothermal data). Congress authorized $320,000,000 for fiscal years 2022 through 2026, to remain available until spent. Critical mineral — defined in 30 U.S.C. 1606(a).

Full Legal Text

Title 43, §31l

Public Lands, Source: USLM XML via OLRC

(a)Definition of critical mineral
In this section, the term “critical mineral” has the meaning given the term in section 1606(a) of title 30.
(b)Establishment
There is established within the United States Geological Survey an initiative, to be known as the “Earth Mapping Resources Initiative” (referred to in this section as the “Initiative”).
(c)Purpose
The purpose of the Initiative shall be to accelerate efforts to carry out the fundamental resources and mapping mission of the United States Geological Survey by—
(1)providing integrated topographic, geologic, geochemical, and geophysical mapping;
(2)accelerating the integration and consolidation of geospatial and resource data; and
(3)providing interpretation of subsurface and above-ground mineral resources data.
(d)Cooperative agreements
(1)In general
In carrying out the Initiative, the Director of the United States Geological Survey may enter into cooperative agreements with State geological surveys.
(2)Effect
Nothing in paragraph (1) precludes the Director of the United States Geological Survey from using existing contracting authorities in carrying out the Initiative.
(e)Comprehensive mapping modernization
(1)In general
Not later than 10 years after November 15, 2021, the Initiative shall complete an initial comprehensive national modern surface and subsurface mapping and data integration effort.
(2)Approach
In carrying out paragraph (1) with regard to minerals, mineralization, and mineral deposits, the Initiative shall focus on the full range of minerals, using a whole ore body approach rather than a single commodity approach, to emphasize all of the recoverable critical minerals in a given surface or subsurface deposit.
(3)Priority
In carrying out paragraph (1) with regard to minerals, mineralization, and mineral deposits, the Initiative shall prioritize mapping and assessing critical minerals.
(4)Inclusions
In carrying out paragraph (1), the Initiative shall also—
(A)map and collect data for areas containing mine waste to increase understanding of above-ground critical mineral resources in previously disturbed areas; and
(B)provide for analysis of samples, including samples within the National Geological and Geophysical Data Preservation Program established under section 15908(b) of title 42 for the occurrence of critical minerals.
(f)Availability
The Initiative shall make the geospatial data and metadata gathered by the Initiative under subsection (e)(1) electronically publicly accessible on an ongoing basis.
(g)Integration of data sources
The Initiative shall integrate data sources, including data from—
(1)the National Cooperative Geologic Mapping Program established by section 31c(a)(1) of this title;
(2)the National Geological and Geophysical Data Preservation Program established under section 15908(b) of title 42;
(3)the USMIN Mineral Deposit Database of the United States Geological Survey;
(4)the 3D Elevation Program established under section 3104(a) of this title; and
(5)other relevant sources, including sources providing geothermal resources data.
(h)Authorization of appropriations
There is authorized to be appropriated to the Secretary to carry out this section $320,000,000 for the period of fiscal years 2022 through 2026, to remain available until expended.

Legislative History

Notes & Related Subsidiaries

Statutory Notes and Related Subsidiaries

Wage Rate RequirementsFor provisions relating to rates of wages to be paid to laborers and mechanics on projects for

Construction

, alteration, or repair work funded under div. D or an amendment by div. D of Pub. L. 117–58, including authority of Secretary of Labor, see section 18851 of Title 42, The Public Health and Welfare. Definition of “Secretary” For definition of Secretary as used in this section, see section 18701 of Title 42, The Public Health and Welfare.

Reference

Citations & Metadata

Citation

43 U.S.C. § 31l

Title 43, Public Lands

Last Updated

Sep 22, 2026

Release point: 119-110