Title 43 › CHAPTER 22 — RIGHTS-OF-WAY AND OTHER EASEMENTS IN PUBLIC LANDS › § 942–6
The Secretary of the Interior can give written permits for a right of way in Alaska up to 100 feet wide, and up to 5 acres of station grounds per station for every five miles of road. Permit holders may take needed materials from public land, build wagon roads or tramways, and charge tolls, freight, and passenger fees at Secretary-approved rates for up to 20 years. After completion, the owner can buy up to 20 acres at each end of the line for $1.25 an acre; shore land at tidewater can be no more than 40 rods wide. All minerals in the right of way stay with the United States. Maps and preliminary surveys must be filed like railroad routes. Only U.S. citizens or companies formed under U.S. state or territory law may get these rights. Congress can change, repeal, or give equal rights to others on nearby or parallel routes. The Secretary must be satisfied that the public needs the road and that making it usable will cost at least $500 per mile on average. If the proposed line uses a commonly used public road or trail and would harm public interests, the Secretary must refuse the permit. No one may collect tolls until at least an average of $500 per mile has actually been spent building the road. Toll collection must be authorized in writing and signed by the Secretary, with printed copies of that authorization and the approved rates posted at every station where tolls are charged. Collecting tolls without that written authorization or failing to post it is a misdemeanor punishable by a $50–$500 fine per offense and up to 90 days in jail until the fine is paid. Parties who by May 14, 1898 had already built at least one mile of road (at $500 per mile) or a half mile of tramway (at $500) get priority to apply for rights along their existing line, including connected wharves. If a permit holder does not finish any section within one year, that uncompleted part is forfeited and reverts to the United States. If a road is not kept in good condition, the Secretary can stop tolls until repairs are made. Mortgages on these roads must be recorded with the Secretary of the Interior and local secretaries and become liens on the company’s rights and property. Claims by workers, contractors, subcontractors, or suppliers for work or materials are first liens and take priority over any mortgage.
Full Legal Text
Public Lands, Source: USLM XML via OLRC
Legislative History
Reference
Citation
43 U.S.C. § 942–6
Title 43, Public Lands
Last Updated
Sep 23, 2026
Release point: 119-110