Amendments
2019—Subsec. (s). Pub. L. 115–436 added subsec. (s). 2014—Subsec. (l)(3). Pub. L. 113–79 added par. (3). 2008—Subsec. (r). Pub. L. 110–288 added subsec. (r). 2000—Subsec. (q). Pub. L. 106–554 added subsec. (q). 1992—Subsec. (p)(1), (6). Pub. L. 102–580 substituted “
October 1, 1994” for “
October 1, 1992” in par. (1) and “
October 1, 1993” for “
October 1, 1992” in par. (6). 1987—Subsec. (a)(1). Pub. L. 100–4, § 404(c), inserted cl. (A) and (B) designations. Subsec. (c)(1). Pub. L. 100–4, § 403(b)(2), substituted “as to those discharges” for “as to those navigable waters”. Subsec. (c)(4). Pub. L. 100–4, § 403(b)(1), added par. (4). Subsec. (l). Pub. L. 100–4, § 401, inserted “Limitation on permit requirement” as subsec. heading designated existing provisions as par. (1) and inserted par. heading, added par. (2), and aligned pars. (1) and (2). Subsecs. (m) to (p). Pub. L. 100–4, §§ 402, 403(a), 404(a), 405, added subsecs. (m) to (p). 1977—Subsec. (a)(5). Pub. L. 95–217, § 50, substituted “
section 1314(i)(2)” for “
section 1314(h)(2)”. Subsec. (b). Pub. L. 95–217, § 50, substituted in provisions preceding par. (1) “subsection (i)(2) of
section 1314” for “subsection (h)(2) of
section 1314”. Subsec. (b)(8). Pub. L. 95–217, § 54(c)(1), inserted reference to identification in terms of character and volume of pollutants of any significant source introducing pollutants subject to pretreatment standards under
section 1317(b) of this title into treatment works and programs to assure compliance with pretreatment standards by each source. Subsec. (c)(1), (2). Pub. L. 95–217, § 50, substituted “
section 1314(i)(2)” for “
section 1314(h)(2)”. Subsec. (d)(2). Pub. L. 95–217, § 65(b), inserted provision requiring that, whenever the Administrator objects to the issuance of a permit under subsec. (d)(2) of this section, the written objection contain a statement of the reasons for the objection and the effluent limitations and conditions which the permit would include if it were issued by the Administrator. Subsec. (d)(4). Pub. L. 95–217, § 65(a), added par. (4). Subsec. (e). Pub. L. 95–217, § 50, substituted “subsection (i)(2) of
section 1314” for “subsection (h)(2) of
section 1314”. Subsec. (h). Pub. L. 95–217, § 66, substituted “where no State program is approved or where the Administrator determines pursuant to
section 1319(a) of this title that a State with an approved program has not commenced appropriate
Enforcement
action with respect to such permit,” for “where no State program is approved,”. Subsec. (l). Pub. L. 95–217, § 33(c), added subsec. (l).
Statutory Notes and Related Subsidiaries
Transfer of Functions
For transfer of authorities, functions, personnel, and assets of the Coast Guard, including the authorities and functions of the Secretary of Transportation relating thereto, to the Department of Homeland Security, and for treatment of related references, see
section 468(b), 551(d), 552(d), and 557 of Title 6, Domestic Security, and the Department of Homeland Security Reorganization Plan of
November 25, 2002, as modified, set out as a note under
section 542 of Title 6. Permit Requirements for Discharges From Certain Vessels Pub. L. 110–299, §§ 1, 2,
July 31, 2008, 122 Stat. 2995, as amended by Pub. L. 111–215, § 1,
July 30, 2010, 124 Stat. 2347; Pub. L. 112–213, title VII, § 703, Dec. 20, 2012, 126 Stat. 1580; Pub. L. 113–281, title VI, § 602, Dec. 18, 2014, 128 Stat. 3061; Pub. L. 115–100, § 1, Jan. 3, 2018, 131 Stat. 2245, which exempted from permit requirements, for the period from
July 31, 2008, through Jan. 19, 2018, discharges incidental to the normal operation of vessels, subject to certain exceptions, was repealed by Pub. L. 115–282, title IX, § 903(a)(2)(A)(ii), Dec. 4, 2018, 132 Stat. 4354. Stormwater Permit Requirements Pub. L. 102–240, title I, § 1068, Dec. 18, 1991, 105 Stat. 2007, provided that: “(a) General Rule.—Notwithstanding the requirements of
section 402(p)(2)(B), (C), and (D) of the Federal Water Pollution Control Act [33 U.S.C. 1342(p)(2)(B), (C), (D)], permit application deadlines for stormwater discharges associated with industrial activities from facilities that are owned or operated by a municipality shall be established by the Administrator of the Environmental Protection Agency (hereinafter in this section referred to as the ‘Administrator’) pursuant to the requirements of this section. “(b) Permit Applications.—“(1) Individual applications.—The Administrator shall require individual permit applications for discharges described in subsection (a) on or before
October 1, 1992; except that any municipality that has participated in a timely part I group application for an industrial activity discharging stormwater that is denied such participation in a group application or for which a group application is denied shall not be required to submit an individual application until the 180th day following the date on which the denial is made. “(2) Group applications.—With respect to group applications for permits for discharges described in subsection (a), the Administrator shall require—“(A) part I applications on or before
September 30, 1991, except that any municipality with a population of less than 250,000 shall not be required to submit a part I application before
May 18, 1992; and “(B) part II applications on or before
October 1, 1992, except that any municipality with a population of less than 250,000 shall not be required to submit a part II application before
May 17, 1993. “(c) Municipalities With Less Than 100,000 Population.—The Administrator shall not require any municipality with a population of less than 100,000 to apply for or obtain a permit for any stormwater discharge associated with an industrial activity other than an airport, powerplant, or uncontrolled sanitary landfill owned or operated by such municipality before
October 1, 1992, unless such permit is required by
section 402(p)(2)(A) or (E) of the Federal Water Pollution Control Act [33 U.S.C. 1342(p)(2)(A), (E)]. “(d) Uncontrolled Sanitary Landfill Defined.—For the purposes of this section, the term ‘uncontrolled sanitary landfill’ means a landfill or open dump, whether in operation or closed, that does not meet the requirements for run-on and run-off controls established pursuant to subtitle D of the Solid Waste Disposal Act [42 U.S.C. 6941 et seq.]. “(e) Limitation on Statutory
Construction
.—Nothing in this section shall be construed to affect any application or permit requirement, including any deadline, to apply for or obtain a permit for stormwater discharges subject to
section 402(p)(2)(A) or (E) of the Federal Water Pollution Control Act [33 U.S.C. 1342(p)(2)(A), (E)]. “(f)
Regulations
.—The Administrator shall issue final
Regulations
with respect to general permits for stormwater discharges associated with industrial activity on or before February 1, 1992.” Phosphate Fertilizer Effluent Limitation Pub. L. 100–4, title III, § 306(c), Feb. 4, 1987, 101 Stat. 36, provided that: “(1) Issuance of permit.—As soon as possible after the date of the enactment of this Act [Feb. 4, 1987], but not later than 180 days after such date of enactment, the Administrator shall issue permits under
section 402(a)(1)(B) of the Federal Water Pollution Control Act [33 U.S.C. 1342(a)(1)(B)] with respect to facilities—“(A) which were under
Construction
on or before April 8, 1974, and “(B) for which the Administrator is proposing to revise the applicability of the effluent limitation established under
section 301(b) of such Act [33 U.S.C. 1311(b)] for phosphate subcategory of the fertilizer manufacturing point source category to exclude such facilities. “(2) Limitations on statutory
Construction
.—Nothing in this section [amending
section 1311 of this title and enacting this note] shall be construed—“(A) to require the Administrator to permit the discharge of gypsum or gypsum waste into the navigable waters, “(B) to affect the procedures and standards applicable to the Administrator in issuing permits under
section 402(a)(1)(B) of the Federal Water Pollution Control Act [33 U.S.C. 1342(a)(1)(B)], and “(C) to affect the authority of any State to deny or condition certification under
section 401 of such Act [33 U.S.C. 1341] with respect to the issuance of permits under
section 402(a)(1)(B) of such Act.” Log Transfer Facilities Pub. L. 100–4, title IV, § 407, Feb. 4, 1987, 101 Stat. 74, provided that: “(a) Agreement.—The Administrator and Secretary of the Army shall enter into an agreement regarding coordination of permitting for log transfer facilities to designate a lead agency and to process permits required under
section 402 and
404 of the Federal Water Pollution Control Act [33 U.S.C. 1342, 1344], where both such sections apply, for discharges associated with the
Construction
and operation of log transfer facilities. The Administrator and Secretary are authorized to act in accordance with the terms of such agreement to assure that, to the maximum extent practicable, duplication, needless paperwork and delay in the issuance of permits, and inequitable
Enforcement
between and among facilities in different States, shall be eliminated. “(b) Applications and Permits Before
October 22, 1985.—Where both of
section 402 and
404 of the Federal Water Pollution Control Act [33 U.S.C. 1342, 1344] apply, log transfer facilities which have received a permit under
section 404 of such Act before
October 22, 1985, shall not be required to submit a new application for a permit under
section 402 of such Act. If the Administrator determines that the terms of a permit issued on or before
October 22, 1985, under
section 404 of such Act satisfies the applicable requirements of
section 301, 302, 306, 307, 308, and 403 of such Act [33 U.S.C. 1311, 1312, 1316, 1317, 1318, and 1343], a separate application for a permit under
section 402 of such Act shall not thereafter be required. In any case where the Administrator demonstrates, after an opportunity for a hearing, that the terms of a permit issued on or before
October 22, 1985, under
section 404 of such Act do not satisfy the applicable requirements of
section 301, 302, 306, 307, 308, and 403 of such Act, modifications to the existing permit under
section 404 of such Act to incorporate such applicable requirements shall be issued by the Administrator as an alternative to issuance of a separate new permit under
section 402 of such Act. “(c) Log Transfer Facility Defined.—For the purposes of this section, the term ‘log transfer facility’ means a facility which is constructed in whole or in part in waters of the United States and which is utilized for the purpose of transferring commercially harvested logs to or from a vessel or log raft, including the formation of a log raft.” Allowable Delay in Modifying Existing Approved State Permit Programs To Conform to 1977 Amendment Pub. L. 95–217, § 54(c)(2), Dec. 27, 1977, 91 Stat. 1591, provided that any State permit program approved under this section before Dec. 27, 1977, which required modification to conform to the amendment made by
section 54(c)(1) of Pub. L. 95–217, which amended subsec. (b)(8) of this section, not be required to be modified before the end of the one year period which began on Dec. 27, 1977, unless in order to make the required modification a State must amend or enact a law in which case such modification not be required for such State before the end of the two year period which began on Dec. 27, 1977.
Enforcement
functions of Administrator or other official of the Environmental Protection Agency under this section relating to compliance with national pollutant discharge elimination system permits with respect to pre-
Construction
,
Construction
, and initial operation of transportation system for Canadian and Alaskan natural gas were transferred to the Federal Inspector, Office of Federal Inspector for the Alaska Natural Gas Transportation System, until the first anniversary of the date of initial operation of the Alaska Natural Gas Transportation System, see Reorg. Plan No. 1 of 1979, §§ 102(a), 203(a), 44 F.R. 33663, 33666, 93 Stat. 1373, 1376, effective July 1, 1979, set out in the Appendix to Title 5, Government Organization and Employees. Office of Federal Inspector for the Alaska Natural Gas Transportation System abolished and functions and authority vested in Inspector transferred to Secretary of Energy by
section 3012(b) of Pub. L. 102–486, set out as an Abolition of Office of Federal Inspector note under
section 719e of Title 15, Commerce and Trade. Functions and authority vested in Secretary of Energy subsequently transferred to Federal Coordinator for Alaska Natural Gas Transportation Projects by
section 720d(f) of Title 15.