Michigan Hydro Project Submits License Application Filing
Published Date: 5/22/2025
Notice
Summary
STS Hydropower and Van Buren Township in Michigan have officially filed a big new license application to keep running the French Landing Hydroelectric Project on the Huron River. This means they’re moving forward with plans to manage the dam and generate clean energy, with key deadlines set for final changes and approvals. Local residents and energy users can expect updates soon, but no immediate changes or costs are happening just yet.
Analyzed Economic Effects
3 provisions identified: 2 benefits, 0 costs, 1 mixed.
Recreation access maintained and improved
The applicants propose to continue maintaining French Landing Park and project recreation facilities, which include a hand-carry boat access, a pavilion, picnic tables, a boardwalk with a fishing platform, restrooms, and two paved parking areas that together hold 19 vehicles. They also propose to enhance the approximately 1,150-foot portage route and stairs to the put-in site, preserving and improving local public access to the impoundment and river.
Project to remain run‑of‑river operation
The applicants propose to continue operating the French Landing Project in a run-of-river mode so outflow approximates inflow, with minimum and maximum hydraulic capacities of 255 and 880 cubic feet per second (cfs). The notice also states the project averaged 6,919 megawatt-hours (MWh) of generation annually from 2011 to 2024 and that environmental measures for water quality, fish, and cultural resources will continue.
Project boundary acreage changed
The applicants propose to decrease the project boundary from 1,327 acres to 1,279.9 acres. Specifically, they propose revising the impoundment contour from 655 to 652 feet NGVD29 (removing a net total of 48.8 acres), adding 2.4 acres for recreation facilities, adding 0.5 acre for the right embankment, and removing 1.2 acres associated with a non-project substation.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-17392, Chugach Electric Association, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Chugach Electric Association wants to study building a new hydroelectric project on Canyon Creek in Alaska. If approved, this project could generate clean energy and connect to the local power grid, but no construction can start yet. People have until October 20, 2026, to share their thoughts or compete for the project rights.
2026-17318, Commission Information Collection Activities (FERC-725S); Comment Request
FERC is updating its emergency reporting rules to better track sudden power losses from new tech like Inverter Based Resources. This means some power companies will have new reporting duties starting soon, helping keep the electric grid safe and reliable. Comments on these changes are due by October 26, 2026, so affected companies should get ready to share their thoughts!
2026-17257, Bangor-Pacific Hydro Associates; Notice of Reasonable Period of Time for Water Quality Certification Application
2026-17101, Georgia Power Company; Notice of Application for Temporary Variance Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Georgia Power Company asked for a temporary change to rules at their Flint River Hydroelectric Project in Georgia. This could affect water quality rules and needs approval from state agencies. People have until September 17, 2026, to share their thoughts or get involved before any decisions are made.
2026-17103, Seefeld Corporation: Notice of Application for Surrender of Exemption Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Seefeld Corporation wants to give up its special exemption for the Smith Creek Hydroelectric Project in Washington. This change could affect local water quality rules and needs approval from the Washington Department of Ecology. People have until September 17, 2026, to share their thoughts or get involved before the decision moves forward.
2026-16925, Commission Information Collection Activities (FERC-725U); Comment Request; Extension
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection FERC-725U (1902-0274), Mandatory Reliability Standards for the Bulk Power System; CIP Reliability Standards. There are no proposed changes to the reporting requirements. The comment period ended on July 27, 2026, with no comments received.
Previous / Next Documents
Previous: 2025-09201, Northwest Pipeline LLC; Notice of Application and Establishing Intervention Deadline
Northwest Pipeline LLC found two small pipeline sections in Idaho that needed emergency replacement after their big 2024 pipe project. They finished the fix in November 2024, costing about $6.9 million, and now they’re asking for official approval. If you’re affected or interested, you’ve got a deadline to speak up!
Next: 2025-09203, Loan Guaranty: Assistance to Eligible Individuals in Acquiring Specially Adapted Housing; Cost-of-Construction Index
The VA is boosting the money available for specially adapted housing grants by 4.1% for 2025. This means eligible veterans can get more help to build or buy homes that fit their unique needs. The increase kicks in for the new fiscal year, making it easier and more affordable for veterans to get the support they deserve.