2025-12677Proposed RuleWallet

FAA Checks Boeing 737 Landing Gear for Manufacturing Damage

Published Date: 7/8/2025

Proposed Rule

Summary

The FAA wants to make sure Boeing 737 planes are super safe by checking and replacing certain landing gear parts that might have been damaged during manufacturing. If you own or operate these planes, you’ll need to inspect records or parts and swap out any faulty cylinders. Comments on this plan are open until August 22, 2025, and fixing these issues helps keep flights safe without breaking the bank.

Analyzed Economic Effects

3 provisions identified: 0 benefits, 3 costs, 0 mixed.

Mandatory inspections and replacements for 737 landing gear

If you own or operate Boeing Model 737-600, -700, -700C, -800, -900, or -900ER airplanes, you must do a maintenance records check or inspect the left and right main landing gear (MLG) outer cylinders and replace any affected outer cylinders per Boeing Alert Requirements Bulletin 737-32A1585 RB, dated January 15, 2024. The FAA proposes this AD because improper grinding may have caused heat damage that could lead to landing gear collapse, loss of control, runway departure, or fuel spill and fire hazard.

Replacement cost: ~$270,270 per outer cylinder

If an affected MLG outer cylinder must be replaced, the FAA estimates on-condition costs as 62 work-hours at $85 per hour ($5,270) plus $265,000 in parts, for a total of $270,270 per MLG outer cylinder. An MRO identified 166 Boeing 737 MLG outer cylinders that had machining with the suspect grinder.

Inspection cost: $170 per airplane (2 hours)

The FAA estimates each affected airplane requires a 2 work-hour records check or inspection at $85 per hour, costing $170 per airplane. The FAA estimates this proposed AD would affect 1,833 U.S.-registered airplanes, for a total estimated inspection cost to U.S. operators of $311,610.

Personalized for You

How does this regulation affect your finances?

Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Key Dates

Published Date
7/8/2025

Department and Agencies

Department
Independent Agency
Agency
Transportation Department
Federal Aviation Administration
Source: View HTML

Related Federal Register Documents

Previous / Next Documents

Back to Federal Register