FERC Tweaks Power Reports: Grid Safety Gets a Facelift
Published Date: 3/3/2026
Notice
Summary
FERC is updating how certain power companies report important data to keep the electric grid safe and reliable. These changes affect generator owners, operators, and transmission folks, with new reporting rules rolling out soon. You’ve got until April 2, 2026, to share your thoughts, and these updates aim to keep things smooth without extra costs.
Analyzed Economic Effects
2 provisions identified: 0 benefits, 2 costs, 0 mixed.
Category 2 Generators Now Covered
If you own or operate non-bulk inverter-based resources that have or contribute to an aggregate nameplate capacity of at least 20 MVA and connect to a common point at voltage ≥60 kV (called "category 2"), you are now included in the NERC definitions for Generator Owner and Generator Operator. That change means you must comply with the reporting and documentation obligations of eight specific Reliability Standards: BAL-001-TRE-2, IRO-010-5, MOD-032-1, PRC-012-2, PRC-017-1, TOP-003-6.1, VAR-001-5, and VAR-002-4.1.
Estimated Annual Reporting Hours and Costs
FERC estimates the new reporting and record-retention tasks will take between 4 and 40 hours per listed requirement per year for affected entities, with per-standard per-respondent costs illustrated in the notice (examples: 4 hrs = $254.08; 8 hrs = $508.16; 20 hrs = $1,270.40; 40 hrs = $2,540.80). The Commission provides tables with the number of respondents, total annual hours, and total annual cost for each FERC-725 collection tied to the eight standards.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-13692 — Commission Information Collection Activities (FERC-556); Comment Request; Extension
FERC is extending the paperwork rules for small power producers and cogenerators for another three years—no changes, just a smooth continuation. If you run or work with these facilities, you can keep submitting the same info as before. Got thoughts? You’ve got until September 8, 2026, to share them!
2026-13698 — Commission Information Collection Activities (FERC-549D); Comment Request; Extension
FERC is extending the deadline for collecting quarterly reports from intrastate natural gas and Hinshaw pipeline operators for three more years, with no changes to the current rules. If you run one of these pipelines, you’ll keep sending the same info to help keep energy flowing smoothly. Comments on this extension are due by September 8, 2026, so don’t miss your chance to speak up!
2026-13699 — Commission Information Collection Activities (FERC-549C); Comment Request; Extension
FERC is extending the current rules for how interstate natural gas pipelines share business info for another three years—no changes, just a smooth continuation. Pipeline companies and related businesses need to keep following these standards, and the public can comment until September 8, 2026. This keeps things clear and consistent without adding new costs or paperwork.
2026-13680 — Combined Notice of Filings
The Federal Energy Regulatory Commission got several new filings from natural gas companies about pipeline rates and refunds. These filings could change how much some companies charge or refund customers, with some changes starting as soon as July 1, 2026. If you’re involved with these pipelines or rates, keep an eye on comment deadlines in mid to late July to have your say!
2026-13694 — Commission Information Collection Activities (FERC-561); Comment Request; Extension
FERC is asking for public feedback to keep collecting info on utility company leaders who also work with big banks, insurers, and major electricity buyers. This annual report helps keep things transparent and fair in the energy world. Comments are due by September 8, 2026, and there’s no new cost or big changes—just an extension of the current process.
2026-13693 — Commission Information Collection Activities (FERC-912); Comment Request; Extension
FERC is extending the current paperwork rules for small power producers and cogeneration facilities for another three years—no changes, just more time. If you’re involved in these energy projects, you’ll keep reporting the same info as before. Got thoughts? You have until September 8, 2026, to share them!
Previous / Next Documents
Previous: 2026-04189 — Foreign-Trade Zone (FTZ) 18, Notification of Proposed Production Activity; Tesla Inc; (Battery Storage Products and Components); Fremont, Livermore, and Lathrop, California
Tesla is getting the green light to make battery storage products and parts at its California sites in Fremont, Livermore, and Lathrop under special trade rules. This means Tesla can bring in certain foreign materials with lower or no import taxes, helping them save money and speed up production. The changes kick in soon after approval and cover cool tech like Megapack batteries and vehicle converters.
Next: 2026-04191 — Pacific Gas and Electric Company; Notice of Application for Temporary Variance of Flow Requirements Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Pacific Gas and Electric Company wants to temporarily change how much water flows through its DeSabla-Centerville hydroelectric project in Butte County, California. This affects local rivers and lands managed by federal agencies and could impact water users and the environment for a short time. The public has until March 30, 2026, to share their thoughts or get involved before any changes happen.