Natural Gas Pipelines Beef Up Corrosion Checks with NACE Update
Published Date: 4/24/2026
Rule
Summary
Starting January 1, 2027, pipeline companies must follow the updated NACE SP0206 standard to better check for corrosion inside natural gas pipelines. This change helps keep everyone safer, makes rules clearer, and cuts down on paperwork headaches. If you work with pipelines, get ready to comply or share your thoughts by June 23, 2026!
Analyzed Economic Effects
4 provisions identified: 4 benefits, 0 costs, 0 mixed.
Operators must adopt NACE SP0206-2016
If you operate pipelines that carry normally dry natural gas, the rule updates the referenced standard to NACE SP0206-2016 and replaces the 2006 edition in 49 CFR part 192. The updated standard is incorporated by reference for Sec. 192.923(b) and 192.927(b),(c) and becomes effective January 1, 2027.
Early compliance authorized before effective date
You may begin complying with the updated NACE SP0206-2016 standard after June 23, 2026, even though the rule’s formal effective date is January 1, 2027. PHMSA authorized compliance after June 23, 2026 and will withdraw the rule only if it receives adverse comments by that date.
Updated standard made available free online
PHMSA states the incorporated standard is available free of charge consistent with the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011, and provides a web link (https://ibr.ansi.org/Standards/nace.aspx) where interested parties can access the material. You can also obtain it through publisher contact info listed in Sec. 192.7.
Rule aims to maintain or improve public safety
PHMSA concludes the updated NACE SP0206-2016 will maintain or improve public safety, help identify corrosion threats, and align practices with innovations. PHMSA also states the update may improve pipeline operators' ability to provide abundant, reliable, affordable natural gas.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-22396, Pipeline Safety: Amendments to Liquefied Natural Gas Facilities
The government wants to update safety rules for liquefied natural gas (LNG) facilities to match the latest industry standards and new technology. These changes affect LNG operators and aim to make facilities safer by using smarter, risk-based approaches. Comments on the proposal are open until January 4, 2027, with no immediate cost changes announced.
2026-13805, Pipeline Safety: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines
The government wants to update pipeline safety rules to make fixing gas and liquid pipelines smarter, safer, and cheaper. These changes affect pipeline operators who’ll use new tech and clearer guidelines to spot and repair problems faster. Comments are open until September 8, 2026, so get ready to weigh in before the rules get final—and yes, this could save money and prevent accidents!
2026-10969, Pipeline Safety: Breakout Tank Inspection Rule
The Pipeline Safety folks want to update rules for breakout tanks—those tanks that help manage and store hazardous liquids in pipelines. They’re switching to a newer, smarter inspection method that checks tanks based on risk, not just a set schedule. This affects pipeline operators, who should get ready to follow these updated inspections and can share their thoughts by August 3, 2026.
2026-10782, Pipeline Safety: Class Location Change Requirements; Correction
PHMSA fixed a small but important detail in a new pipeline safety rule from January 2026. Pipeline operators can now confirm or restore safe pressure levels when neighborhoods change around their pipes, with a clear 24-month deadline starting either from the rule’s effective date or when they begin work. This helps keep gas pipelines safe without confusion about timing, so operators know exactly when to act and avoid costly delays.
2026-08144, Administrative Rulemaking, Guidance, and Enforcement Procedures
The Department of Transportation is bringing back and improving its rules for making new policies, giving guidance, and enforcing laws. This affects anyone involved in transportation regulations, making the process clearer and more consistent. These changes kick in on May 27, 2026, aiming to save time and avoid confusion without adding extra costs.
2026-08058, Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction
This update fixes a numbering mistake in the rules for checking the maximum safe pressure of gas pipelines. Pipeline operators must follow the corrected list to avoid confusion, but no new costs or deadlines are added. The fix takes effect on August 3, 2026, making safety rules clearer and easier to follow.
Previous / Next Documents
Previous: 2026-08051, Pipeline Safety: Standards Update-NACE SP0502
Starting January 1, 2027, pipeline operators must follow the updated NACE SP0502 standard to better detect and prevent pipeline corrosion. This change helps keep the public safe, cuts down on confusing rules, and makes compliance easier for companies. If anyone has concerns, they can comment by June 23, 2026, but otherwise, the new rules kick in smoothly with no extra costs expected.
Next: 2026-08053, Pipeline Safety: Standards Update-ASME B31.4
Starting January 1, 2027, pipeline companies that move liquids and slurries must follow the latest ASME B31.4 safety rules. This update helps keep everyone safer, cuts down on confusing rules, and makes it easier for companies to follow the law. If you have concerns, you can speak up by June 23, 2026, but otherwise, get ready to roll with the new standards!