Mine Wants to Bring Electronic Testing Gear Closer to Work
Published Date: 11/17/2026
Notice
Summary
Crimson Oak Grove Resources, LLC wants to change a safety rule at their Oak Grove Mine in Alabama. They’re asking to use special electronic testing gear closer to certain mining areas than current rules allow, promising it’s just as safe. If approved, this could speed up work without costing extra, but everyone has until December 17, 2026, to share their thoughts.
Analyzed Economic Effects
5 provisions identified: 2 benefits, 1 costs, 2 mixed.
Allow specified testing gear within 150 feet
The petitioner asks permission to use certain non-permissible low-voltage or battery-powered electronic testing and diagnostic equipment within 150 feet of pillar workings or longwall faces. Allowed devices are listed (for example, AMS 2140 Machinery Health Analyzer, laptops, oscilloscopes, insulation testers, ultrasonic measuring devices, electronic tachometers) and fault detectors are explicitly not allowed. The equipment must meet IEC 60079-11 or ANSI/UL 60079-11 when commercially available, have IP66 or the highest available IP rating, meet lithium battery standards UL1642 or IEC 62133 when applicable, and be no older than 10 years from manufacture.
Methane limits and detector rules
The equipment may not be used if methane is detected at or above 1.0 percent; if 1.0 percent or more methane is detected while equipment is being used, the equipment must be de-energized immediately and withdrawn to fresh air. All hand-held methane detectors must be MSHA-approved, calibrated or bump-tested before each shift, provide visual and audible warnings at and above 1.0 percent, and methane tests must be made at least 12 inches from the roof, face, ribs and floor before energizing equipment.
Operational restriction during coal production
The petitioner states the subject equipment may not be used when coal production is occurring on the section; all mining on the section must cease before using the equipment. A positive means to prevent mobile equipment from tramming in the same entry or crosscut must be provided and addressed in the mine ventilation plan.
Lithium battery and charging restrictions
Equipment containing lithium batteries must meet UL1642 or IEC 62133 and battery packs must not be disassembled or modified except by the manufacturer. Batteries must be changed out in intake air outside the subject area, replacement batteries may not be brought into the subject area, batteries must not be charged underground, and battery packs showing greater than a 20% performance decrease must not be used.
Inspections, records, training, and EMI/RFI tests
The petition requires a qualified person to examine equipment before taking it underground and at least weekly, with exam results recorded weekly and allowed to be expunged after one year. Equipment must be serviced per manufacturer recommendations and records kept on mine property; equipment may not be used until MSHA initially inspects it and RFI/EMI testing is done with MSHA notified at least 5 working days before testing. All affected miners and qualified persons must receive training on the Petition terms and a training record must be maintained.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15670, Roof Control Plan Approval Criteria
In response to a public request, the Mine Safety and Health Administration (MSHA) is reopening the rulemaking record and is scheduling a virtual public hearing on the Agency's proposed rule published on July 1, 2025, titled, "Roof Control Plan Approval Criteria."
2026-15717, Ventilation Plan Approval Criteria
In response to a public request, the Mine Safety and Health Administration (MSHA) is reopening the rulemaking record and is scheduling a virtual public hearing on the Agency's proposed rule published on July 1, 2025, titled, "Ventilation Plan Approval Criteria."
2026-10456, Department of Labor Federal Civil Penalties Inflation Adjustment Act Annual Adjustments for 2026
Good news for businesses and workers: the Department of Labor won’t raise any fines or penalties in 2026 because the usual inflation data wasn’t available. This means all civil penalties stay the same starting May 27, 2026. So, no surprise cost hikes this year—just steady rules and steady fees!
2025-12232, Ventilation Plan Approval Criteria
The Mine Safety and Health Administration (MSHA) wants to change how mine ventilation plans get approved. They’re removing the power of District Managers to add extra rules, making the process clearer and fairer. Mine operators should get ready to comment by July 31, 2025, but no big costs or delays are expected.
2026-23312, Proposed Extension of Information Collection: Proximity Detection Systems for Continuous Mining Machines in Underground Coal Mines
The Mine Safety and Health Administration wants to keep collecting info on safety systems that help prevent accidents with mining machines underground. This affects coal mine operators who use these machines and helps keep miners safe without adding extra paperwork hassle. Comments on this plan are open until January 19, 2027, so speak up if you have thoughts!
2026-23390, Respirable Crystalline Silica and Respiratory Protection
This update fixes a small mistake in the rules about protecting miners from harmful silica dust. It affects underground and surface coal mine operators by clarifying exposure limits to dangerous dust and gases. The correction takes effect November 17, 2026, helping keep miners safer without adding big costs.
Previous / Next Documents
Previous: 2026-23309, Petition for Modification of Application of Existing Mandatory Safety Standards
Coeur Alaska Inc. wants to change a safety rule at their Kensington Mine in Alaska. They’re asking to use new blasting methods that don’t need a 15-foot air gap between power and blasting lines but still keep miners safe. Comments on this change must be sent by December 17, 2026, so everyone has time to weigh in before any money or safety impacts happen.
Next: 2026-23311, Petition for Modification of Application of Existing Mandatory Safety Standards
Ramaco Resources wants to change a safety rule for their Tiller No. 1 mine in Virginia. They’re asking to stop weekly air checks at a certain point in the mine’s ventilation system, saying it’s just as safe. If approved, this could save time and money while keeping miners safe. Everyone has until December 17, 2026, to share their thoughts on this change.