All Roll Calls
Yes: 326 • No: 534
Sponsored By: C. T. Wilson (Democratic)
Signed by Governor
Personalized for You
Personalize government policy and PRIA will tell you what this bill means for your household, plus every other piece of legislation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
19 provisions identified: 6 benefits, 3 costs, 10 mixed.
For community solar systems not owned by an electric company, unsubscribed energy creates banked bill credits. The subscriber group or coordinator can assign these credits to subscribers within 1 year after creation. After that deadline, the electric company must buy the associated generation through its qualifying-facility process at its procurement cost. The law does not specify the value of each subscriber’s credits.
Sellers and lessors of residential rooftop solar systems must provide a full 5-year warranty covering installation and parts. They must include manufacturer warranties and disclose the minimum energy output buyers can expect, adjusted for weather. They must also certify compliance with applicable workmanship laws and minimum component design standards. Violations carry fines of up to $1,000 each; these are not payments to buyers.
The law took effect July 1, 2025, but its Section 1 requirements do not apply to qualifying earlier solar applications. The exemption covers construction or modification when a state certificate application or required local permit application was submitted before that date. The law also protects obligations and contract rights already in existence from being impaired.
Local governments generally cannot ban covered solar stations or reject site plans that meet the law’s requirements, subject to statutory exceptions. They must speed up review and approval of compliant plans. Stations rated at 5 megawatts or less by inverter alternating-current output receive permitted-use processing. Local governments retain authority over required local permits and must act within a reasonable time. They cannot make those permits depend on conditional-use, special-exception, or floating-zone approval, and conflicting local law is preempted.
The construction-approval rule addressed here now applies only to front-of-the-meter storage, which serves the grid rather than a customer’s meter. It no longer applies to energy storage devices generally. Local governments cannot ban front-of-the-meter projects or deny site plans that meet the section’s requirements. They must speed up review and use standard review and approval processes. The Public Service Commission can waive or change covered storage notice, review, and site requirements for good cause.
Maryland’s natural resources agency must work with energy, transportation, and planning agencies to identify state-owned land suitable for solar. The public SMARTDG+ mapping tool must include suitable state land by December 1, 2025. The agencies must complete an analysis of state-owned land by December 1, 2026, to support Maryland’s solar commitments.
The law removes local governments’ authority under the repealed provisions to create automatic community solar enrollment programs. Those provisions covered guaranteed bill-credit discounts, opt-outs, and electric-company support. This repeal does not state that current subscribers automatically lose their credits.
Covered solar owners must post a county bond equal to 100% of landscaping costs for the first five years. After five years, an inspection confirming 90% plant survival allows release of half; the rest stays for two more years. A further inspection must confirm continued compliance before final release. Owners must also sign a decommissioning agreement with the Public Service Commission and post a surety bond. That bond cannot exceed 125% of estimated future removal costs for the station and related infrastructure, net of salvage value. Owners must update the decommissioning bond calculation every five years.
The Maryland Department of Labor must create a special license for people who install or maintain residential rooftop solar systems. It must also set minimum qualifications for this work. The law does not specify the qualifications, license fees, or a deadline for creating the license.
Ground-mounted solar stations above 5 megawatts cannot occupy certain land based on its designation as of January 1, 2025. Covered land includes Tier 1 or Tier 2 mapped local growth areas, medium- or high-density residential areas, and mixed-use areas with homes. Capacity is measured by inverter alternating-current rating. In priority preservation areas established before January 1, 2025, qualifying approved solar stations can cover no more than 5% of acreage. Stations must be within the project area and meet statutory requirements. Once the cap is reached, the specified prohibitions no longer apply to the remaining 95%, and the county must notify the Commission.
Distributed solar certificate applicants must send the county their application at least 30 days before filing with the Commission. They must send the Power Plant Research Program a copy when filing. Proposed solar stations in areas considered both overburdened and underserved require at least two public meetings to collect and address feedback. Meetings must be in the county and within 10 miles, or as close as practical when no suitable venue exists. Agrivoltaics are exempt from the two-meeting requirement. Qualifying notices or meetings completed by June 30, 2025, through an existing approval process satisfy the transition rule for overburdened or underserved communities.
Covered solar applications must analyze views from listed scenic, historic, recreation, and preservation places, and owners must reduce visual impacts. Required screens cannot exceed 35 feet in width and must provide four-season screening, achieved within five years. Owners must preserve existing trees where practical, install screening before activation, and maintain at least 90% plant survival throughout operation. They must minimize grading, preserve topsoil, use native or noninvasive naturalized vegetation, and limit mowing and unnecessary landscaping. Herbicides are allowed only for invasive-species control under Maryland’s Weed Control Program. Agrivoltaics are exempt, and documented county siting agreements can relax visual-screening restrictions.
Covered solar sites generally need 150 feet from a home’s nearest wall and 100 feet from applicable property lines. Setbacks run to the nearest array or equipment; grid-connection tie lines and facilities are exempt. Sites need specified nonbarbed fencing, and arrays and related facilities cannot occupy public road rights-of-way, except for grid-connection equipment. Visible nighttime lighting is barred unless required by law or needed for safety or emergencies. Stations and related structures generally cannot average more than 15 feet tall; needed grid-connection equipment and stations sharing land with agriculture are exempt. Agrivoltaics are exempt from the covered setback rules, and documented county siting agreements can allow less strict restrictions.
For proposed front-of-the-meter storage, the Commission must give immediate notice or require the applicant to do so. Notice goes to specified local governments, legislators, and affected communities within 1 mile. In areas considered both overburdened and underserved, the Commission must require applicants to hold at least two community meetings. The meeting requirement does not apply inside an existing electricity generating station.
Eligible community solar projects outside municipalities can use a new distributed generation certificate instead of the usual state certificate. Projects must exceed 2 megawatts but not 5 megawatts, measured by the inverter’s alternating-current rating. Developers must obtain the certificate before construction. State utility and natural resources officials can jointly set application fees to cover administrative costs, based on expected annual applications. Rooftop community solar systems are excluded from generating-station treatment under the classification provision, regardless of capacity.
Siting rules now cover qualifying wholesale, community solar, and aggregate net-metering stations above 1 megawatt, down from above 2 megawatts. Rooftop, carport, brownfields, and behind-the-meter stations are excluded. Covered stations of 2 megawatts or less need local verification of site compliance before construction. Larger covered stations need the applicable state approval and all required local permits. Applicants must document site and decommissioning compliance; covered local site plans at 2 megawatts or less need the same evidence. State certificate review must consider site compliance, and distributed generation certificates must require applicable local permits, including stormwater, erosion-control, building, and electrical permits.
The Power Plant Research Program must seek public comment and propose standard solar siting, design, and licensing rules. Its proposals are due to the Public Service Commission by July 1, 2026. The standards address environmental protection, stormwater, public safety, grid connections, and related site requirements. The Commission must adopt implementing rules by July 1, 2027, including application procedures and a time limit for the Program’s determination.
Covered front-of-the-meter storage outside commercial or industrial locations needs nonbarbed fencing no higher than 20 feet. Barbed wire is allowed around substations and other critical infrastructure. Locally required landscape screens must provide four-season coverage and cannot exceed 25 feet in depth; local governments cannot require berms. Owners must minimize grading and keep topsoil on the property. Herbicides are allowed only for invasive-species control under Maryland’s Weed Control Program.
The law removes the statutory exemption for solar stations from real and personal property taxes. Any resulting tax depends on applicable tax rules and the station’s assessed value. It also removes the specific authority allowing local governments to require payments instead of taxes of up to $5,000 per megawatt generated. No replacement payment is specified.
C. T. Wilson
Democratic • House
Brian M. Crosby
Democratic • House
All Roll Calls
Yes: 326 • No: 534
Senate vote • 4/7/2025
Third Reading Passed
Yes: 35 • No: 11 • Other: 1
House vote • 4/5/2025
Third Reading Passed
Yes: 97 • No: 40
House vote • 4/4/2025
Floor Amendment {693126/1 (Delegate Ghrist) Rejected
Yes: 38 • No: 97 • Other: 3
House vote • 4/4/2025
Floor Amendment {213622/1 (Delegate Ghrist) Rejected
Yes: 39 • No: 98 • Other: 1
House vote • 4/4/2025
Floor Amendment {983526/1 (Delegate Chisholm) Rejected
Yes: 40 • No: 95 • Other: 3
House vote • 4/4/2025
Floor Amendment (Delegate Ghrist) Rejected
Yes: 38 • No: 98 • Other: 2
House vote • 4/4/2025
Floor Amendment {823823/1 (Delegate Ghrist) Rejected
Yes: 39 • No: 95 • Other: 4
Approved by the Governor - Chapter 624
Returned Passed
Third Reading Passed (35-11)
Second Reading Passed
Favorable Adopted
Favorable Report by Education, Energy, and the Environment
Rereferred to Education, Energy, and the Environment
Referred Rules
Third Reading Passed (97-40)
Motion Vote Previous Question (Delegate J. Lewis) Adopted
Second Reading Passed with Amendments
Floor Amendment {983526/1 (Delegate Chisholm) Rejected (40-95)
Floor Amendment {213622/1 (Delegate Ghrist) Rejected (39-98)
Floor Amendment {823823/1 (Delegate Ghrist) Rejected (39-95)
Floor Amendment {693126/1 (Delegate Ghrist) Rejected (38-97)
Floor Amendment (Delegate Ghrist) Rejected (38-98)
Motion Vote Previous Question (Delegate J. Lewis) Adopted
Floor Amendment {113822/1 (Delegate Ghrist)
Motion Special Order until 04/04 (Delegate Crosby) Adopted
Favorable with Amendments {403123/1 Adopted
Favorable with Amendments Report by Economic Matters
Hearing 2/28 at 1:30 p.m.
First Reading Economic Matters
Enacted
5/20/2025
Third Reading
4/4/2025
First Reading
2/5/2025
HB 0384, Maryland Disability Service Animal Program - Established
SB 0227, Workers' Compensation - Payment From Uninsured Employers' Fund - Revisions
HB 0482, Occupational Licensing and Certification - Criminal History - Predetermination Review Process
SB 0157, Maryland Disability Service Animal Program - Established
HB 1294, Commercial Law - Credit Regulation - Earned Wage Access and Credit Modernization
HB 0228, Maryland Veterans Trust – Assistance to Members of the Maryland National Guard