All Roll Calls
Yes: 191 • No: 1
Sponsored By: Bill Ramos (Democratic)
Signed by Governor
Personalized for You
Personalize government policy and PRIA will tell you what this bill means for your household, plus every other piece of legislation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
12 provisions identified: 1 benefits, 2 costs, 9 mixed.
Excavators who break damage-prevention rules and damage hazardous gas or liquid facilities face up to $25,000 per violation. That penalty may also apply to violations of the transmission-pipeline excavation offense. Hazardous gas or liquid pipeline operators face up to $25,000 per violation when required locating or marking failures cause damage. Excavators or operators face up to $5,000 per pipeline-related violation that causes no pipeline damage. All civil penalties recovered under this penalty section go to the state's damage prevention account.
Digging within 35 feet of a transmission pipeline is a misdemeanor when an applicable required safeguard has not been met. These safeguards include getting a confirmation code, waiting until the stated work start date, and receiving the operator's positive response. Charged equipment operators can establish a defense based on receiving a code, emergency work, or work exempt from notice. Receiving a false code from an identifiable third party is also a defense. The code-based defense no longer requires a valid code, but excavation safety duties remain.
Irrigation districts are exempt from specified standard notice and locating requirements for construction, operation, or maintenance in federal reclamation projects. The work must be on rights-of-way, easements, or facilities owned by the federal Bureau of Reclamation. Safe-work and damage-response duties still apply.
Excavators must support underground facilities when reasonably needed, including while refilling a dig, and use safe work methods. They must account for known and unknown facilities and conditions above and below ground. They must find the precise location of marked facilities and plan work to avoid damage or minimize interference. During directional boring, they must expose facilities as needed to avoid boring blindly. After contacting or damaging a facility, they must notify the known operator directly, notify the locator service, and file the required damage report.
Beginning July 27, 2025, operators must identify service connections within the dig boundary and a public right-of-way or utility easement. They may mark them, meet with excavators, or provide records; a good-faith attempt satisfies this duty and generally limits damage or injury liability. Duties to arrange repairs or relocation remain. Property owners must locate underground lines they own on their property, and the locator service must list private locators available at owners' expense. Owners need not subscribe to the service or locate service connections in public rights-of-way or utility easements.
Beginning July 27, 2025, any development permit application for property within 700 feet of a transmission pipeline requires design locating. Before changing ground levels, digging, or adding soil weight within that distance, applicants must contact the operator and provide plans. The operator has 30 days to confirm review and identify possible impacts; work may resume without violation if it does not respond. Utility operators must explain through the locator service how to obtain location information for design work. They may charge design-locating fees, but not to the Washington Department of Transportation.
Beginning July 27, 2025, utility markings must identify the facility type, best known width, and operator, but not depth. Excavators must keep markings accurate for the shorter of the excavation phase or 45 calendar days after notice. Markings expire 45 calendar days after notice. Excavators must submit a new notice before continuing work after expiration.
Beginning July 27, 2025, emergencies include a clear, present danger to life, health, or property. They also include unplanned customer utility outages needing immediate action, with an excavator or operator crew on-site or on the way. An outage alone is not enough. Emergency excavators may skip specified boundary-marking and notice steps only if they notify the locator service as soon as practicable. Operators must promptly dispatch locating staff without undue delay, and safe-work and damage-response duties still apply.
Beginning July 27, 2025, Washington's free locator service must offer the same services online as by toll-free phone. Excavators generally must mark dig boundaries with white lines or flags; when marking is infeasible, they must send electronic notice. Notice must state a work start date 2 to 10 full business days later, excluding weekends and holidays, unless operators agree otherwise in writing. One notice can generate several unique codes showing issuance dates and times; codes become valid on the stated work start date. Excavators remain responsible when others submit notice, must coordinate locating for multiple sites or projects over 700 linear feet, and retain existing excavation exemptions.
The utility safety committee must include a labor representative from a group historically representing underground utility or excavation workers. It must receive enough evidence of a probable violation before appointing a review committee. At least 30 days before review, the accused party must receive all complaint materials and evidence the complainant will use. Both sides must receive notice and a chance to participate. The committee cannot review pipeline-damage complaints or specified pipeline penalty and criminal matters; the Utilities and Transportation Commission can enforce pipeline-related violations directly without committee referral.
Excavators who discover an unidentified underground facility must stop digging nearby and immediately notify the operator through the locator service. They must also notify the operator when a known facility cannot be located. Operators responding to a one-call notice may safely expose a facility that cannot be located without following the specified standard notice and locating requirements. These operators still must follow the law's safe-work and damage-response requirements.
Beginning July 27, 2025, operators must provide location information for locatable facilities by the stated work start date. Available information about facilities that cannot be located is due before that date; gas and hazardous-liquid pipelines follow specified federal rules. Extensions for events beyond the operator's control require written agreement. Operators must give extension notice as soon as reasonable, no later than the existing deadline. Beginning January 1, 2026, excavators cannot start until every operator with underground facilities in the notice area gives a positive response.
Bill Ramos
Democratic • Senate
Bob Hasegawa
Democratic • Senate
Jeff Wilson
Republican • Senate
Lisa Wellman
Democratic • Senate
Paul Harris
Republican • Senate
Sharon Shewmake
Democratic • Senate
T'wina Nobles
Democratic • Senate
All Roll Calls
Yes: 191 • No: 1
Senate vote • 4/22/2025
Final Passage as Amended by the House
Yes: 48 • No: 0
House vote • 4/11/2025
Final Passage as Amended by the House
Yes: 95 • No: 0 • Other: 3
Senate vote • 3/6/2025
3rd Reading & Final Passage
Yes: 48 • No: 1
Effective date 7/27/2025.
Chapter 292, 2025 Laws.
Governor signed.
Delivered to Governor.
Speaker signed.
President signed.
Passed final passage; yeas, 48; nays, 0; absent, 0; excused, 0.
Senate concurred in House amendments.
Third reading, passed; yeas, 95; nays, 0; absent, 0; excused, 3.
Rules suspended. Placed on Third Reading.
Committee amendment(s) adopted with no other amendments.
Rules Committee relieved of further consideration. Placed on second reading.
Referred to Rules 2 Review.
APP - Executive action taken by committee.
APP - Majority; do pass with amendment(s) but without amendment(s) by Environment & Energy.
Referred to Appropriations.
ENVI - Majority; do pass with amendment(s).
ENVI - Executive action taken by committee.
First reading, referred to Environment & Energy.
Third reading, passed; yeas, 48; nays, 1; absent, 0; excused, 0.
Rules suspended. Placed on Third Reading.
Floor amendment(s) adopted.
1st substitute bill substituted.
Placed on second reading by Rules Committee.
On motion, referred to Rules Committee for second reading.
Session Law
5/22/2025
Bill as Passed Legislature
4/25/2025
Engrossed Substitute
3/6/2025
Substitute Bill
2/21/2025
Original Bill
1/31/2025
SB 5974, Modernizing and strengthening laws concerning sheriffs, police chiefs, town marshals, law enforcement agency volunteers, youth cadets, specially commissioned officers, and police matrons.
HB 2034, Concerning termination and restatement of plan 1 of the law enforcement officers' and firefighters' retirement system.
HB 2689, Concerning the working connections child care program.
SB 6260, Implementing efficiencies and programming changes in public education.
SB 5998, Making 2025-2027 fiscal biennium supplemental operating appropriations.
SB 6003, Concerning the capital budget.